AGI Hopper Joint Seal Installation guide

  • Hello! I've reviewed the installation instructions for the 8" & 10" Swing-Away Auger Hopper Joint Seal. This document provides guidance on drilling and fastening the seal rubber skirt. I'm ready to answer any questions you may have about the installation process or any other information contained in this document.
  • How many holes should be drilled?
    What diameter should the drilled holes be?
    What type of screws should be used to fasten the seal?
1. Drill three .203” (5.2 mm) diameter holes in the curved bottom panel of the hopper joint box.
2. Fasten the seal rubber skirt to the curved bottom panel with three 1/4” x 1/2” long self tapping
metal screws.
INSTALLATION INSTRUCTIONS
FOR 8” & 10” SWING-AWAY AUGER
HOPPER JOINT SEAL
Publication No. 1035407
1035407-10401323
Page 2
0401324 1035407-2
INSTALLATION INSTRUCTIONS
FOR 8” & 10” SWING-AWAY AUGER
HOPPER JOINT SEAL
/