Displays2go GK1014 Operating instructions

Type
Operating instructions
© 2022
Order #XXXXX
Plan View
Perspective View
10’
10’
Scale: 17
GK-1014 - 10’ x 10’ Display
If you would like to tell us about your experience with your setup instructions please email us at [email protected]
SETUP INSTRUCTIONS
© 2022
Order #XXXXX
Locked layer contains
placeholder marks.
= 1 sq foot
GK-1014 Grid View
© 2022
Order #XXXXX
DO NOT USE POWER TOOLS
ALL CONNECTIONS MUST
BE TIGHTLY SECURED
Part Identification - Numbering
Spline Connection Base Plate & Extrusion Connection
General Setup Instructions
- Read entire setup instruction manual prior to
unpacking parts and pieces.
- The setup instructions are created specifically
for this configuration.
- Setup instructions are laid out sequentially in
steps, including exploded views with detailed
explanation for assembly.
WARNING
Cleaning & Packing
- For Cleaning Metal, Plex, & Laminate Parts:
Use a MILD NON-ABRASIVE cleanser and
soft cloth/paper towel to clean all surfaces.
- Keep exhibit components away from heat
and prolonged sun exposure.
Heat and UV exposure will warp and
fade components.
- Retain all provided Packing Materials.
All provided packing materials are for
ease of repacking & component protection.
Disassembly
- For loss prevention, tighten all set screws
and locks during disassembly.
7A
Hex Tool - Essential for Assembly
Extrusion & Lock Connection Engaged Lock
LADDERS OR LIFTS
MAY BE REQUIRED
General Information
© 2022
Order #XXXXX
Assembly Assembly Cont’d
Stacking Unstacking
Stacking Assembly
1) Place one horizontal frame on top of the other, lining up the
center grooves.
2) Turn stacking lock clockwise to tighten into place. Repeat
for each lock.
Stacking Disassembly
1) Turn the stacking lock counter-clockwise to loosen.
2) The whole spring on the stacking lock should be in view to
release each frame. The disengaged spring should release
the stacking lock. If not, keep turning the stacking lock until
it disengages.
Side-by-Side Assembly
1) Frames: Place frames side-by-side with one higher than the
other, then slide panel down to lock panels securely together.
2) Corner Connectors: Repeat Step 1 for installing corner
connectors to frames.
Side-by-Side Disassembly
1) Pull pin lock outwards to disengage.
2) Pull frames upward and apart at the same time to detatch.
Push stacking lock into the slot
of the upper frame, then spin the
cap to tighten the lock.
Push pin lock into hole of connecting frame.
Note: Block of pin lock will secure in groove.
Disengage the stacking lock by
spinning the cap counter
clockwise and pulling down.
Cap
Stacking
Lock
Pin Lock
Top View
Corner Connector
SEG
Grooves
Note: Orientation of Corner
Connector may change.
Gravitee Panel Assembly
© 2022
Crate 1 of 1
Order #XXXXX
Locked layer contains
placeholder marks.
CRATE PACKING
Crate Packing
© 2022
Step 1 of 6
Order #XXXXX
Completed Assembly
3
2
4
78
5
9
11 12
13
10
6
1
Item
1
2
3
4
5
6
7
8
9
10
11
12
13
Qty.
1
1
1
1
1
1
1
1
1
1
1
1
1
Description
14.125”w x 95”h Gravitee Panel
94.5”h Gravitee Corner Post w/ Caps Both Ends
38”w x 95”h Gravitee Panel
94.5”h Gravitee Corner Post w/ Caps Both Ends
14.125”w x 95”h Gravitee Panel
95”h Gravitee Corner Post
32.5”w x 95”h Gravitee Panel w/ Two 91.904” S44
95”h Gravitee Corner Post
14.125”w x 95”h Gravitee Panel
94.5”h Gravitee Corner Post w/ Caps Both Ends
38”w x 95”h Gravitee Panel
94.5”h Gravitee Corner Post w/ Caps Both Ends
14.125”w x 95”h Gravitee Panel
Steps:
1) Starting with panel [1], connect panels and posts
together in numerical order.
See Gravitee Panel Assembly sheet for assembly
instruction and GK-1014 Corner Post Orientation sheet.
Keep all vertical extrusions attached inside panels.
*
**
Transformers
Power Break
Maximum 8 light strips
per transformer.
Light Connection
to transformer
Light Connector
Cord
Connect lights
together as shown.
*
Light to Light Attachment
Light to Transformer
Attachment
Transformer
144W / 6 Amp / 24V
GK-1014 Assembly
© 2022
Step 2 of 6
Order #XXXXX
Top View
w/Caps
Top View
Top View Top View
w/Caps
Top View
w/Caps
Top View
w/Caps
GK-1014 Corner Post Orientation
© 2022
Step 3 of 6
Order #XXXXX
Steps:
1) Install SEG graphics to assembled panels as shown.
Limited space in corners requires
extra attentive installation.
Graphic Removal
To remove the graphic from
the frame, locate the fabric
pull tab. Gently pull up on the
tab to remove the fabric.
Step 1
Insert corner A. Turn edge of
graphic so silicon welt is
perpendicular to face of
graphic. Insert narrow side
of welt with fabric to outside
into the channel. Repeat for
other side of this corner.
Step 2
Repeat Step 1 for opposite
corner C, then insert corner
B, followed by corner D, to
complete the installation of
the corners.
Step 3
Once all corners are inserted,
press one silicon edge into
channel from corners and
work toward the center.
Make sure welt is fully inserted
into channel. Continue until
all sides are done. Smooth
out edges of graphic.
SEG Graphic Attachment
It is important to first insert
graphic into each alternate
corner, then to the sides of
the frame. If this is not done,
graphic will not fit into the
frame correctly.
Corner A
Corner D
Corner B
Corner C
SEG
SEG SEG
SEG
SEG
SEG SEG
GK-1014 SEG Graphics
© 2022
Step 4 of 6
Order #XXXXX
Shelf
Shelf
Shelf
Shelf
Steps:
1) Attach shelves, to panel [7], thru holes in graphic.
3) Connect lights to top of display where desired.
See Light Connection detail.
Completed Assembly
7
*
*
Slide light onto clip then lock clip
into groove of horizontal extrusion.
Light Connection
Clip
Light
Light
Clip
Horizontal Extrusion
GK-1014 Attachments
© 2022
Step 5 of 6
Order #XXXXX
Locked layer contains
placeholder marks.
25
26
27
28
29
30
31
32
1
2
3
Door
Door
Back View
*
*
*
*
Back View
Door
Hinge
Hinge
Slide pin into
hinge attached
to vertical.
Slide door
hinge over pin.
Door Connection
*
Pin
Top View
Top View
Top View
door
hinge
Top View
door
hinge
Steps:
1) Assemble Gravitee panels and posts in numerical order, as shown,
making sure Velcro is facing inward. See Gravitee Panel Assembly
sheet, for instruction.
2) Attach horizontal extrusions [1] and [2] between posts [25] and [32].
3) Attach vertical [3] between horizontals [1] and [2].
4) Connect doors to posts [25] and [32]. See Door Connection detail.
Item
25
26
27
28
29
30
31
32
1,2
3
Qty.
1
1
1
1
1
1
1
1
1,1
1
Description
38”h Gravitee Corner Post w/ Door Attachment
14.125”w x 38”h Gravitee Panel Frame
38”h Gravitee Corner Post
19”w x 38”h Gravitee Panel Frame
19”w x 38”h Gravitee Panel Frame
38”h Gravitee Corner Post
14.125”w x 38”h Gravitee Panel Frame
38”h Gravitee Corner Post w/ Door Attachment
37.0945”w Z45 Horizontal Extrusion
34.4173”h Z45 Vertical Extrusion
GOD-1558 Counter Assembly
© 2022
Step 6 of 6
Order #XXXXX
Locked layer contains
placeholder marks.
*
Shelf Supports
Shelf
Supports
Completed Assembly
Shelf
31
25
32
1
3
Counter Top
Steps:
1) Wrap SEG Graphic around front and sides of assembled counter.
See SEG Graphic Installation sheet for instruction.
2) Connect shelf supports to Velcro, then place shelf on top of supports.
3) Lock counter top to panels [26] and [31]. See Counter Top Lock detail.
Back View Front View
*
Top View
Align hole with pin Rotate pin. Spring
will push pin into hole.
Counter Top Lock
12
*
Pin
Hole
26
2
Keep connectors [25] [32] extrusions [1] [2] [3] and doors assembled, when packing.
GOD-1558 Counter Assembly (Cont’d)
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11

Displays2go GK1014 Operating instructions

Type
Operating instructions

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI