Technical Bulletin
Identification:
Bulletin no:
Date:
Issuer:
Factory:
Y06
FRJ2007-03
21/03/07
C.CHAUSSAT
FRJ AUBUSSON
POSTAL ADDRESS TELEPHONE TELEFAX
ELECTROLUX PROF. SAS ZI du mont 23200 AUBUSSON FRANCE +33 555832323 +33 555832340
Subject
EMC reinforcement (Electro-Magnetic Conformity).
Model
B3000 (all PNCs)
Problem
_
Reason
_
Actions in
factory
Addition of a green/yellow wire between speed controler and
motor + addition of a thermoconductive spacer between thermal
overload probe and motor windings.
Actions in
field
Application date: Year 2007, Week 10 –
- This modification does not bring any PNC modification.
- This modification has not to be done systematically on the
machines built before this date. (except in case of operation
problems.)