Lang PF-F-1-LMDR Installation guide

  • Hello! I am an AI chatbot trained to assist you with the Lang PF-F-1-LMDR Installation guide. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
Star Manufacturing International 10 Sunnen Drive St. Louis, MO 63143
Part Number: 2M-W817 Phone: 314-781-2777 Fax: 314-781-2714 December 1, 2006
Rev. WWW.STAR-MFG.COM
THERMOMETER INSTALLATION KIT
MODEL PF-F-1-LMDR PROOFER
Part Number 51100-49
De-energize the Proofer.
Remove all trays from right side of proofer.
Remove the rack along the right inside wall of proofer cavity.
Locate and drill two (2) holes per the below illustration. Use a 0.136 diameter drill bit.
Using (2) two # 8 self-tapping stainless screws, install the small mounting bracket
provided.
Install the rack on the right side of the proofer,
Install the Thermometer, by sliding bottom assembly tab into the mounting bracket.
Installation is complete.
10 3/8 in.
9 3/4 in.
18 1/4 in.
19 11/16 in.
Proofer
Front
Proofer Top
Top of Proofer Cavity
Proofer Door Edge
All Dimensions are internal
Right Side Wall
/