Important Change Notification
This document supersedes both the TCF–10B Frequency-Programmable Frequency-Shift Carrier
Transmitter/Receiver System Manual CF44–VER01, last printed in April 1996, and the Addendum to
CF44–VER01, printed December 10, 1996. The following list shows the most recent publication date for
each chapter. Publication dates in bold type indicate changes to that chapter since the previous publica-
tion. For these chapters, the specific pages that have changed are listed for easy reference. Note that only
significant changes, i.e., those changes which affect the technical use and understanding of the document
and the TCF–10B equipment, are reported. Changes in format, typographical corrections, minor word
changes, etc. are not reported. Note also that in some cases text and graphics may have flowed to a
different page than in the previous publication due to formatting or other changes. The page numbers
below show the current pages on which the reported changes appear.
Each reported change is identified in the document by a change bar placed in the margin to its immediate
left, just like the one on this page.
Chapter
Number & Title Publication Date Pages with Changes
Front Section April 1997 ii
1. Product Description April 1997 1-3, 1-13
2. Applications and Ordering Information December 1996
3. Installation April 1997 3-10, 3-11
4. Test Equipment January 1996
5. Acceptance Tests April 1997 5-5, 5-6, 5-9 thru 5-14
6. Routine Adjustment Procedures April 1997 6-11
7. Signal Path April 1997 7-3, 7-5
8. Maintenance January 1996
9. Power Supply Module January 1996
10. Keying Module January 1996
11. Transmitter Module April 1997 11-7
12. 10W PA Module January 1996
13. RF Interface Module April 1997 13-4
14. Receiver/Synthesizer Module April 1996
15. CLI and Discriminator Module January 1996
16. Receiver Logic Module April 1997 16-6, 16-9, 16-21 thru
16-23, 16-25
17. EM Output Module January 1996
18. Optional Voice Adapter Module April 1997 18-9
19. Optional Transfer Trip Test Unit (TTU) December 1996