Laminata Shed1800 Installation guide

  • Hello, I'm a chat assistant trained on the Shed 1800 installation guide document. I've read through the material list, assembly steps from base to door installation, and am ready to help answer questions about it. Feel free to ask me anything about the product, assembly process or materials.
  • What should I do before starting the building process?
    What is the recommended gap around the doors?
    How should I waterproof the shed?
Shed1800 installation guide.
®
Material list.
UI Code:
Quantity:
BR75-181-0
3
CP01-181-LR
1
CP01-181-RR
1
CP01-181-LF
1
CP01-181-RF
1
LM30-181-0
30
UI Code:
Quantity:
LM30-181-AC
2
IN01-181-SC
2
LM30-181-SPG
3
LM30-181-SPS
1
TR02-181-ST
2
TR02-181-FT
2
UI Code:
Quantity:
TR01-181-SB
2
TR01-181-FB
1
TR01-181-SJ
2
TR01-181-WB
1
PRE MADE DOOR
2
SC50
1 box (100)
UI Code:
Quantity:
SC75
1 box (50)
H200
4
PB150
1
PB100
1
SC40
1 box (100)
WPM-181-0
1
Step 1.
1. Prepare your workspace.
2. Unpack and carefully stack components to one side to free up
base for the shed.
Before you start building, you will need to:
Step 2.
28mm
Front flush
Fix LM30-181-SPG to BR75-181-0.
Position the flush at the front and al-
low for side and rear walls to sit on the
BR75-181-0. Refer to the Shed1800
base construction guide.
Tip:
BR75-181-0 3
UI Code: Quantity:
LM30-181-0 6
SC75 21
LM30-181-SPG 1
Step 3.
1. Ensure the base is level in each
direction.
2. Reuse the wrap under the base for
damp proofing.
Tips:
28mm
28mm
Step 4.
Secure first layer of MiniCLT planks with
bugle screws to the pallet base.
Tip:
LM30-181-0 3
UI Code: Quantity:
SC75 9
LM30-181-0
LM30-181-0
LM30-181-0
LR181
LF181
RR181
RF181
CP01-181-LR 1
CP01-181-RR 1
CP01-181-LF 1
CP01-181-RF 1
SC75 6
UI Code: Quantity:
Refer to fixing guide for more
information.
Ensure the bottom of the posts are level
with the bottom base planks. Refer to
fixing guide for further information on
how to secure the corner posts.
Tip:
Step 5.
25mm
Fixing groove
Step 6.
2
6
5
4
3
1
2
6
5
4
3
1
LAM30
SP90
AC90
LM30-181-AC 2
LM30-181-0 18
LM30-181-SP 10
SC50 36
SC75 14
UI Code: Quantity:
Fixing groove
Stack up MiniCLT planks and skew
screw with SC50 screws. Once all planks
are in place, secure SC75 screws at the
top, middle and bottom of corner posts.
Refer to fixing guide.
Tip:
Step 7.
Refer to fixing guide for more
information on attaching the
IN01-181-SC.
LM30-181-SPG 1
SC50 10
IN01-181-SC 2
UI Code: Quantity:
IN01-181-SC
LM30-181-SPG
LM30-181-SPG
IN01-181-SC
30mm
Step 8.
LM30-181-SPS 1
SC75 2
UI Code: Quantity:
LM30-
181
-SPS
Refer to fixing guide for more
information.
Step 9.
LAM30-181-0 6
SC50 14
LM30-181-SPG 1
UI Code: Quantity:
TR02-181-ST
TR01-181-FT
TR02-181-ST 2
TR02-181-FT 2
SC40 16
UI Code: Quantity:
Step 10.
Step 11. WPM roll to overhang around perimeter
and screw fix at 300mm centres.
Tip:
WPM02 1
SC40 45
UI Code: Quantity:
TR01-181-SB 2
TR01-181-FB 1
TR01-181-SJ 2
UI Code: Quantity:
SC50 35
TR01-181-FB
TR01-181-SB
Step 12.
Step 13.
UI Code: Quantity:
H200 4
PRE MADE DOORS 2
SC40 28
PB150 1
PB100 1
1. Use PB100 to secure the doors. Refer to
fixing guide.
2. Ensure there is an even gap around the
doors.
Tip:
7-10mm gap
Step 14. Even up the gap in the doors by adjusting
the base if required.
Tip:
TR03-181-DE 1
UI Code: Quantity:
Shed1800 xing guide.
Step 6.
45
25mm
Fixing groove
Steps 5&6.
Step 10.
Step 7.
28mm
Shed1800 base construction.
Birds eye view. Side section.
Front section.
100 100 100773773
1,846
1,790 28
28
2875
1,846
2828 1,790
1790
1846
BR75
CE65
100 100 100773773
28
100
BR75
LM30-SPG
138
1790
28
laminata.nz
®
/