Bretford TL10C-K-US-RED Operating instructions

  • Hello! I am an AI chatbot trained to assist you with the Bretford TL10C-K-US-RED Operating instructions. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
TechGuard Charging Locker 10-Bay
Assembly & Installation
|The equipment is to be secured to the building structure before
operation.
|Consult with a structural engineer or suitable professional prior to
installation.
|Unit must be secured to oor and/or anchored to the wall in compliance with
local building code.
|Two people required for lifting during assembly.
|Nothing may be placed on top of assembled unit.
|The socket-outlet shall be installed near the equipment and shall be easily accessible.
|Installation Instruction states the product is to be secured to building before operation.
|Elevated Operating Ambient - Consideration should be given to installing the lockers in an
environment compatible with the maximum ambient temperature Tma of 40°C.
|Reduced Air Flow - Instructions indicated to not block the ventilation openings so proper air ow
required for safe operation of the equipment is not compromised.
|Mechanical Loading - Mounting of the equipment in the locker should be such that a hazardous
condition is not achieved due to uneven mechanical loading.
TechGuard Charging Locker 10-Bay 031-10478 Rev 1.0
Tools Required Estimated Time Required People Required
T-25 Bit
30 Min. Two (2)
Bubble Level
Powered or Manual Bit Driver
Bit Extension
TechGuard Charging Locker 10-Bay 031-10478 Rev 1.0
Assembly Instructions
2
010-6980 - Qty 1
Top Cap
017-1292 - Qty 4
Short Support Tube
010-6983 - Qty 2
Front & Back Panel
010-6981 - Qty 2
Side Panel
022-3582 - Qty 1
Stacking Bracket
017-1293 - Qty 2
Long Support Tube
015-0045 - Qty 4
Leveler Foot
030-1796 - Qty 12
#10-32 x 1/2” Serrated Screw
010-7152 - Qty 1
Wall Anchor Bracket
TechGuard Charging Locker 10-Bay 031-10478 Rev 1.0
Assembly Instructions
3
1
Pedestal Assembly
2
030-1796
(8)x
017-1293
(2)x
017-1292
(2)x
017-1292
(2)x
030-1796
(8)x
TechGuard Charging Locker 10-Bay 031-10478 Rev 1.0
Assembly Instructions
4
3
4
015-0045
(4)x
010-6980
(1)x
030-1796
(8)x
Route all power cords
through Top Cap prior to
attaching Top Cap to tube
frame.
Adjust leveler feet to
desired location (use
bubble level).
TechGuard Charging Locker 10-Bay 031-10478 Rev 1.0
Assembly Instructions
5
5
6
010-6981
(2)x
030-1796
(8)x
Front
Back
Pedestal Mount To 5-Bay Locker
Carefully place 5-bay onto
pedestal.
TechGuard Charging Locker 10-Bay 031-10478 Rev 1.0
Assembly Instructions
6
Bottom view
Bottom view
Hold unit in place while
afxing unit to pedestal
with four (4) supplied 10-32
screws, being careful not to
overtighten.
The pedestal must be attached
to oor as necessary - consult
with a structural engineer
or suitable professional to
determine requirements.
There are four (4) holes,
5/8” (15.8mm) diameter in
the Short Support Tubes
of the pedestal.
030-1796
(4)x
7
TechGuard Charging Locker 10-Bay 031-10478 Rev 1.0
Assembly Instructions
7
8
030-1796
(4)x
022-3582
(1)x
Stack 5-Bay With Another 5-Bay Locker
Route power cord through appropriate hole if desired and attach stacking bracket to underside of upper
5-bay using four (4) supplied 10-32 screws, being careful not to overtighten.
Upper 5-Bay unit may be placed in any orientation (90, 180, 270 degrees) from lower 5-Bay unit,
as desired.
TechGuard Charging Locker 10-Bay 031-10478 Rev 1.0
Assembly Instructions
8
9
030-1796
(4)x
TechGuard Charging Locker 10-Bay 031-10478 Rev 1.0
Assembly Instructions
9
1. Locate the Y-Connector power cable and feed it through the
opening for the back panel. (You may need to re-adjust the
Leveler Feet of the base to accommodate the Y-Connector
cable.)
2. Connect each power cable to the supplied Y-Connector cable.
3. Connect the Y-Connector cable to a dedicated 15 A wall outlet.
10
To 15 A wall outlet
TechGuard Charging Locker 10-Bay 031-10478 Rev 1.0
Assembly Instructions
10
Secure the Wall Anchor Bracket
to the wall if desired.
11
030-1796
(2)x
010-7152
(1)x
11000 Seymour Avenue
Franklin Park, Illinois 60131 USA
US Toll Free Phone: 800-521-9614
Phone: +1-847-678-2545
US Toll Free Fax: 800-343-1779
Fax: +1-847-678-0852
BRETFORD.COM
Bretford, B design, and TechGuard are trademarks or registered marks of Bretford Manufacturing, Inc. or Bretford
Manufacturing, Ltd. Patents pending. ©2015 Bretford Manufacturing, Inc. All rights reserved. All other referenced
product names and logos are trademarks of their respective owners.
TechGuard Charging Locker 10-Bay 031-10478 Rev 1.0
12
010-6983
(2)x
12
/