Danfoss AM-PBU 25 Operating instructions

  • Hello! I am an AI chatbot trained to assist you with the Danfoss AM-PBU 25 Operating instructions. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
1
Installation Guide
AM-PBU 25
District Energy VI.AE.P2.02 DEN-SMT/SI
Description
AM-PBU 25 is a standby power supply for AME 55 and AME
85 actuators. It will drive the actuators to open or closed
position during a power failure. The AM-PBU 25 can power one
AMV(E) 85/86 or two AMV(E) 55/56 actuators.
L 24 Vac power
LN System neutral
BT Battery Test
RC Remote Control
TG Test Ground
C1 Common, Output 1
NC1 Normally Closed, Output 1
NO1 Normally Open, Output 1
AC 24 Vac output
C2 Common, Output 2
NC2 Normally Closed, Output 2
NO2 Normally Open, Output 2
Installation
1. Connect the VMS25 to the actuator(s) as shown.
Connect NC1 or NC2 to terminal 3 on an actuator to drive the valve stem down during power failure or to terminal
2 to drive the valve stem up during a power failure.
2. Connect AM-PBU 25 to 24 volts ac power.
3. Connect the red wire to the battery positive (+) and the black wire to the battery negative (-).
Connect the 24 volt power to the AM-PBU 25
before connecting the battery. Connecting
the battery rst causes the AM-PBU 25 to go
into the power failure mode.
Installation Guide AM-PBU 25
73690820/VI.AE.P2.02
Produced by Danfoss A/S © 05/2014
Testing the AM-PBU 25 and the battery
The jumper between LN & RC can be replaced by a connection to a Building Management System (BMS), a
controller or a manual switch. When the contact opens, the mains power is disconnected and the AM-PBU 25 goes
through a cycle, running on battery power. This feature can be used for remote control of the valve or for testing of
the battery.
Connecting terminals TG (-) and BT (+) to a BAS or volt meter and taking a reading just after an exercise cycle, gives a
good indication of battery condition. At the end of the cycle (6.5 minutes), the battery should not be below 10 V.
When the connection between LN & RC is restored the AM-PBU 25 will charge the battery with 13-14 volts dc wich
can be veried on terminals TG & BT.
/