ANZZI TW-AZ023CH Installation guide

Type
Installation guide
INSTALLATION INSTRUCTIONS
Before you begin, read the installation instructions below. Observe all local building and safety
codes.
Unpack and inspect the product for any shipping damages and ensure that none of the required
pieces are missing. If you nd damages, do not install. Contact Customer Service at 1.866.44.
ANZZI. If you need assistance or have questions while installing your towel warmer, contact
Customer Service.
Anzzi™ accepts no liability for any damage to the towel warmer or wall, or for personal injury during
installation.
TOOLS AND MATERIALS
Safety glasses • Tape Measure • Level • Drill • Screwdriver • Pencil
WALL MOUNT INSTALLATION
1. Attach the wall supports to the towel warmer.
2. Using a level and tape measure, determine and mark the installation location of the wall
supports. Drill mounting holes and install wall anchors in these locations.
3. Secure the mounting brackets onto the wall using the provided mounting screws.
4. Hang and adjust the towel warmer onto the mounting brackets. Ensure the towel warmer is
rmly and safely xed.
5. Plug the towel warmer into the wall socket.
OPERATION AND MAINTENANCE
The red light indicates the towel warmer is in the on position. Always turn the power o when the
towel warmer is not in use.
Note: Fabrics that contain soap or detergent residue may show what appears to be scorch marks.
These marks are simply the discoloration of the residue.
Wall Mounted Towel Warmer Installation
INSTALLATION INSTRUCTIONS
Before you begin, read the installation instructions below. Observe all local
building and safety codes.
Unpack and inspect the product for any shipping damages and ensure that
none of the required pieces are missing. If you nd damages, do not install.
Contact Customer Service at 1.866.44.ANZZI. If you need assistance or have
questions while installing your towel warmer, contact Customer Service.
Anzzi™ accepts no liability for any damage to the towel warmer or wall, or for
personal injury during installation.
TOOLS AND MATERIALS
Safety glasses • Tape Measure • Level • Drill • Screwdriver • Pencil • Allen Tool
WALL MOUNT INSTALLATION
Please refer to all the following steps if the wall brackets require assembly. If the
wall brackets are already xed to the vertical bars refer to steps 5-12.
1.
1. As shown in the picture,
drill the short screw (6)
through the hole or the
metal of the bracket (1).
2. Use the short screw (6)
to attach the bracket
onto the metal pad of
the vertical bar.
3. Screw down the
short screw (6) with
a screwdriver. Note
that the hole of the
bracket (1) should face
towards the ooor when
the towel warmer is
mounted.
4. Attach the remaining
three brackets (1) to
the vertical bars by
repeating steps 1, 2, & 3.
5. Use the measuring tape
to measure and mark
the (4) anchor points.
Measure A to B, A to C, C
to D an B to D.
6. Mark the location
of A,B,C, & D. It is
recommended to install
the towel warmer a
minimum of 600mm
from the oor.
7. Drill a pilot hole into
each marked point.
8. Completely hammer the
anchors (5) into the pilot
holes.
9. Insert the long screw (4)
through a bush or short
tube (3), then screw into
the wall anchor (5).
10. Install the bracket onto
the bush or short tube.
11. As shown in the picture,
screw the grab screw (2)
into the bracket hole (1)
using the provided Allen
tool; x the bracket (1)
onto the bush or short
tube (3).
12. Fix the remaining three
brackets by repeating
step 11.
And you’re done!
Wall Mounted Towel Warmer Installation
steps if
Accessories of square tubes Accessories of round tubes
Explain
1. Please refer to all the following the wall brackets are taken apart from the
vertical bars.
2. Please refer to the steps 5-12 if the wall brackets are fixed on vertical bars already.
5. Use tape measure the di stance between these four
holes of screw thread; get the data of AB, AC, CD, and
BD.
6. Mark A, B, C, D according the data; Suggest it is
installed at least 600mm above floor level.
WARNING: The plug should avoid all water.
Installation Fittings: Needed tools (left of right):
(1)+ (2): Wall hang bracket + set screw
short tube for wall bracket
1. Tape measure
2. Hammer
3. "+" screwdriver
4. Pencil
5. Angle spanner
6. Electric drill
(4) Long screw nail
(5) Plastic expander
(6) Short screw
(7) Hexagonal angle spanner
7. Drill A, B, C, D holes.
8. Use hammer to knock Wall anchor (5) into wall
completely.
9. Insert long screw (4) through bush or short tube (3),
then screw into (5). Wall anchor
1. As shown in the picture, drill the short screw (6) through the hole
of sheet metal of the bracket
(1).
10. Install the bracket onto the bush or short tube (3).
2. Use the short screw (6) to fix the bracket onto the metal pad of
the vertical tube.
11. As shown in the picture, screw the grub screw (2) into
the hole of the bracket (1) by hexagonal spanner; fix the
bracket (1) onto the bush or short tube (3).
3. Screw down the short screw (6) by a screwdriver. Note that the
hole of the bracket (1) should towards the floor when the towel rail is
wall mounted.
12. Fix the rest three brackets by repeating step11. The
installation is finished. Then wipe the tubs cleanly.
4. Fix the rest three brackets (1) to the vertical tubes by repeating
step 1 to 3.
-2-
-3-
(3) 4pc Bushes or 3pc Bushes +1pc
steps if
Accessories of square tubes Accessories of round tubes
Explain
1. Please refer to all the following the wall brackets are taken apart from the
vertical bars.
2. Please refer to the steps 5-12 if the wall brackets are fixed on vertical bars already.
5. Use tape measure the di stance between these four
holes of screw thread; get the data of AB, AC, CD, and
BD.
6. Mark A, B, C, D according the data; Suggest it is
installed at least 600mm above floor level.
WARNING: The plug should avoid all water.
Installation Fittings: Needed tools (left of right):
(1)+ (2): Wall hang bracket + set screw
short tube for wall bracket
1. Tape measure
2. Hammer
3. "+" screwdriver
4. Pencil
5. Angle spanner
6. Electric drill
(4) Long screw nail
(5) Plastic expander
(6) Short screw
(7) Hexagonal angle spanner
7. Drill A, B, C, D holes.
8. Use hammer to knock Wall anchor (5) into wall
completely.
9. Insert long screw (4) through bush or short tube (3),
then screw into (5). Wall anchor
1. As shown in the picture, drill the short screw (6) through the hole
of sheet metal of the bracket
(1).
10. Install the bracket onto the bush or short tube (3).
2. Use the short screw (6) to fix the bracket onto the metal pad of
the vertical tube.
11. As shown in the picture, screw the grub screw (2) into
the hole of the bracket (1) by hexagonal spanner; fix the
bracket (1) onto the bush or short tube (3).
3. Screw down the short screw (6) by a screwdriver. Note that the
hole of the bracket (1) should towards the floor when the towel rail is
wall mounted.
12. Fix the rest three brackets by repeating step11. The
installation is finished. Then wipe the tubs cleanly.
4. Fix the rest three brackets (1) to the vertical tubes by repeating
step 1 to 3.
-2-
-3-
(3) 4pc Bushes or 3pc Bushes +1pc
steps if
Accessories of square tubes Accessories of round tubes
Explain
1. Please refer to all the following the wall brackets are taken apart from the
vertical bars.
2. Please refer to the steps 5-12 if the wall brackets are fixed on vertical bars already.
5. Use tape measure the di stance between these four
holes of screw thread; get the data of AB, AC, CD, and
BD.
6. Mark A, B, C, D according the data; Suggest it is
installed at least 600mm above floor level.
WARNING: The plug should avoid all water.
Installation Fittings: Needed tools (left of right):
(1)+ (2): Wall hang bracket + set screw
short tube for wall bracket
1. Tape measure
2. Hammer
3. "+" screwdriver
4. Pencil
5. Angle spanner
6. Electric drill
(4) Long screw nail
(5) Plastic expander
(6) Short screw
(7) Hexagonal angle spanner
7. Drill A, B, C, D holes.
8. Use hammer to knock Wall anchor (5) into wall
completely.
9. Insert long screw (4) through bush or short tube (3),
then screw into (5). Wall anchor
1. As shown in the picture, drill the short screw (6) through the hole
of sheet metal of the bracket
(1).
10. Install the bracket onto the bush or short tube (3).
2. Use the short screw (6) to fix the bracket onto the metal pad of
the vertical tube.
11. As shown in the picture, screw the grub screw (2) into
the hole of the bracket (1) by hexagonal spanner; fix the
bracket (1) onto the bush or short tube (3).
3. Screw down the short screw (6) by a screwdriver. Note that the
hole of the bracket (1) should towards the floor when the towel rail is
wall mounted.
12. Fix the rest three brackets by repeating step11. The
installation is finished. Then wipe the tubs cleanly.
4. Fix the rest three brackets (1) to the vertical tubes by repeating
step 1 to 3.
-2-
-3-
(3) 4pc Bushes or 3pc Bushes +1pc
steps if
Accessories of square tubes Accessories of round tubes
Explain
1. Please refer to all the following the wall brackets are taken apart from the
vertical bars.
2. Please refer to the steps 5-12 if the wall brackets are fixed on vertical bars already.
5. Use tape measure the di stance between these four
holes of screw thread; get the data of AB, AC, CD, and
BD.
6. Mark A, B, C, D according the data; Suggest it is
installed at least 600mm above floor level.
WARNING: The plug should avoid all water.
Installation Fittings: Needed tools (left of right):
(1)+ (2): Wall hang bracket + set screw
short tube for wall bracket
1. Tape measure
2. Hammer
3. "+" screwdriver
4. Pencil
5. Angle spanner
6. Electric drill
(4) Long screw nail
(5) Plastic expander
(6) Short screw
(7) Hexagonal angle spanner
7. Drill A, B, C, D holes.
8. Use hammer to knock Wall anchor (5) into wall
completely.
9. Insert long screw (4) through bush or short tube (3),
then screw into (5). Wall anchor
1. As shown in the picture, drill the short screw (6) through the hole
of sheet metal of the bracket (1).
10. Install the bracket onto the bush or short tube (3).
2. Use the short screw (6) to fix the bracket onto the metal pad of
the vertical tube.
11. As shown in the picture, screw the grub screw (2) into
the hole of the bracket (1) by hexagonal spanner; fix the
bracket (1) onto the bush or short tube (3).
3. Screw down the short screw (6) by a screwdriver. Note that the
hole of the bracket (1) should towards the floor when the towel rail is
wall mounted.
12. Fix the rest three brackets by repeating step11. The
installation is finished. Then wipe the tubs cleanly.
4. Fix the rest three brackets (1) to the vertical tubes by repeating
step 1 to 3.
-2-
-3-
(3) 4pc Bushes or 3pc Bushes +1pc
steps if
Accessories of square tubes Accessories of round tubes
Explain
1. Please refer to all the following the wall brackets are taken apart from the
vertical bars.
2. Please refer to the steps 5-12 if the wall brackets are fixed on vertical bars already.
5. Use tape measure the di stance between these four
holes of screw thread; get the data of AB, AC, CD, and
BD.
6. Mark A, B, C, D according the data; Suggest it is
installed at least 600mm above floor level.
WARNING: The plug should avoid all water.
Installation Fittings: Needed tools (left of right):
(1)+ (2): Wall hang bracket + set screw
short tube for wall bracket
1. Tape measure
2. Hammer
3. "+" screwdriver
4. Pencil
5. Angle spanner
6. Electric drill
(4) Long screw nail
(5) Plastic expander
(6) Short screw
(7) Hexagonal angle spanner
7. Drill A, B, C, D holes.
8. Use hammer to knock Wall anchor (5) into wall
completely.
9. Insert long screw (4) through bush or short tube (3),
then screw into (5). Wall anchor
1. As shown in the picture, drill the short screw (6) through the hole
of sheet metal of the bracket (1).
10. Install the bracket onto the bush or short tube (3).
2. Use the short screw (6) to fix the bracket onto the metal pad of
the vertical tube.
11. As shown in the picture, screw the grub screw (2) into
the hole of the bracket (1) by hexagonal spanner; fix the
bracket (1) onto the bush or short tube (3).
3. Screw down the short screw (6) by a screwdriver. Note that the
hole of the bracket (1) should towards the floor when the towel rail is
wall mounted.
12. Fix the rest three brackets by repeating step11. The
installation is finished. Then wipe the tubs cleanly.
4. Fix the rest three brackets (1) to the vertical tubes by repeating
step 1 to 3.
-2-
-3-
(3) 4pc Bushes or 3pc Bushes +1pc
steps if
Accessories of square tubes Accessories of round tubes
Explain
1. Please refer to all the following the wall brackets are taken apart from the
vertical bars.
2. Please refer to the steps 5-12 if the wall brackets are fixed on vertical bars already.
5. Use tape measure the di stance between these four
holes of screw thread; get the data of AB, AC, CD, and
BD.
6. Mark A, B, C, D according the data; Suggest it is
installed at least 600mm above floor level.
WARNING: The plug should avoid all water.
Installation Fittings: Needed tools (left of right):
(1)+ (2): Wall hang bracket + set screw
short tube for wall bracket
1. Tape measure
2. Hammer
3. "+" screwdriver
4. Pencil
5. Angle spanner
6. Electric drill
(4) Long screw nail
(5) Plastic expander
(6) Short screw
(7) Hexagonal angle spanner
7. Drill A, B, C, D holes.
8. Use hammer to knock Wall anchor (5) into wall
completely.
9. Insert long screw (4) through bush or short tube (3),
then screw into (5). Wall anchor
1. As shown in the picture, drill the short screw (6) through the hole
of sheet metal of the bracket (1).
10. Install the bracket onto the bush or short tube (3).
2. Use the short screw (6) to fix the bracket onto the metal pad of
the vertical tube.
11. As shown in the picture, screw the grub screw (2) into
the hole of the bracket (1) by hexagonal spanner; fix the
bracket (1) onto the bush or short tube (3).
3. Screw down the short screw (6) by a screwdriver. Note that the
hole of the bracket (1) should towards the floor when the towel rail is
wall mounted.
12. Fix the rest three brackets by repeating step11. The
installation is finished. Then wipe the tubs cleanly.
4. Fix the rest three brackets (1) to the vertical tubes by repeating
step 1 to 3.
-2-
-3-
(3) 4pc Bushes or 3pc Bushes +1pc
steps if
Accessories of square tubes Accessories of round tubes
Explain
1. Please refer to all the following the wall brackets are taken apart from the
vertical bars.
2. Please refer to the steps 5-12 if the wall brackets are fixed on vertical bars already.
5. Use tape measure the di stance between these four
holes of screw thread; get the data of AB, AC, CD, and
BD.
6. Mark A, B, C, D according the data; Suggest it is
installed at least 600mm above floor level.
WARNING: The plug should avoid all water.
Installation Fittings: Needed tools (left of right):
(1)+ (2): Wall hang bracket + set screw
short tube for wall bracket
1. Tape measure
2. Hammer
3. "+" screwdriver
4. Pencil
5. Angle spanner
6. Electric drill
(4) Long screw nail
(5) Plastic expander
(6) Short screw
(7) Hexagonal angle spanner
7. Drill A, B, C, D holes.
8. Use hammer to knock Wall anchor (5) into wall
completely.
9. Insert long screw (4) through bush or short tube (3),
then screw into (5). Wall anchor
1. As shown in the picture, drill the short screw (6) through the hole
of sheet metal of the bracket
(1).
10. Install the bracket onto the bush or short tube (3).
2. Use the short screw (6) to fix the bracket onto the metal pad of
the vertical tube.
11. As shown in the picture, screw the grub screw (2) into
the hole of the bracket (1) by hexagonal spanner; fix the
bracket (1) onto the bush or short tube (3).
3. Screw down the short screw (6) by a screwdriver. Note that the
hole of the bracket (1) should towards the floor when the towel rail is
wall mounted.
12. Fix the rest three brackets by repeating step11. The
installation is finished. Then wipe the tubs cleanly.
4. Fix the rest three brackets (1) to the vertical tubes by repeating
step 1 to 3.
-2-
-3-
(3) 4pc Bushes or 3pc Bushes +1pc
steps if
Accessories of square tubes Accessories of round tubes
Explain
1. Please refer to all the following the wall brackets are taken apart from the
vertical bars.
2. Please refer to the steps 5-12 if the wall brackets are fixed on vertical bars already.
5. Use tape measure the di stance between these four
holes of screw thread; get the data of AB, AC, CD, and
BD.
6. Mark A, B, C, D according the data; Suggest it is
installed at least 600mm above floor level.
WARNING: The plug should avoid all water.
Installation Fittings: Needed tools (left of right):
(1)+ (2): Wall hang bracket + set screw
short tube for wall bracket
1. Tape measure
2. Hammer
3. "+" screwdriver
4. Pencil
5. Angle spanner
6. Electric drill
(4) Long screw nail
(5) Plastic expander
(6) Short screw
(7) Hexagonal angle spanner
7. Drill A, B, C, D holes.
8. Use hammer to knock Wall anchor (5) into wall
completely.
9. Insert long screw (4) through bush or short tube (3),
then screw into (5). Wall anchor
1. As shown in the picture, drill the short screw (6) through the hole
of sheet metal of the bracket
(1).
10. Install the bracket onto the bush or short tube (3).
2. Use the short screw (6) to fix the bracket onto the metal pad of
the vertical tube.
11. As shown in the picture, screw the grub screw (2) into
the hole of the bracket (1) by hexagonal spanner; fix the
bracket (1) onto the bush or short tube (3).
3. Screw down the short screw (6) by a screwdriver. Note that the
hole of the bracket (1) should towards the floor when the towel rail is
wall mounted.
12. Fix the rest three brackets by repeating step11. The
installation is finished. Then wipe the tubs cleanly.
4. Fix the rest three brackets (1) to the vertical tubes by repeating
step 1 to 3.
-2-
-3-
(3) 4pc Bushes or 3pc Bushes +1pc
steps if
Accessories of square tubes Accessories of round tubes
Explain
1. Please refer to all the following the wall brackets are taken apart from the
vertical bars.
2. Please refer to the steps 5-12 if the wall brackets are fixed on vertical bars already.
5. Use tape measure the di stance between these four
holes of screw thread; get the data of AB, AC, CD, and
BD.
6. Mark A, B, C, D according the data; Suggest it is
installed at least 600mm above floor level.
WARNING: The plug should avoid all water.
Installation Fittings: Needed tools (left of right):
(1)+ (2): Wall hang bracket + set screw
short tube for wall bracket
1. Tape measure
2. Hammer
3. "+" screwdriver
4. Pencil
5. Angle spanner
6. Electric drill
(4) Long screw nail
(5) Plastic expander
(6) Short screw
(7) Hexagonal angle spanner
7. Drill A, B, C, D holes.
8. Use hammer to knock Wall anchor (5) into wall
completely.
9. Insert long screw (4) through bush or short tube (3),
then screw into (5). Wall anchor
1. As shown in the picture, drill the short screw (6) through the hole
of sheet metal of the bracket
(1).
10. Install the bracket onto the bush or short tube (3).
2. Use the short screw (6) to fix the bracket onto the metal pad of
the vertical tube.
11. As shown in the picture, screw the grub screw (2) into
the hole of the bracket (1) by hexagonal spanner; fix the
bracket (1) onto the bush or short tube (3).
3. Screw down the short screw (6) by a screwdriver. Note that the
hole of the bracket (1) should towards the floor when the towel rail is
wall mounted.
12. Fix the rest three brackets by repeating step11. The
installation is finished. Then wipe the tubs cleanly.
4. Fix the rest three brackets (1) to the vertical tubes by repeating
step 1 to 3.
-2-
-3-
(3) 4pc Bushes or 3pc Bushes +1pc
steps if
Accessories of square tubes Accessories of round tubes
Explain
1. Please refer to all the following the wall brackets are taken apart from the
vertical bars.
2. Please refer to the steps 5-12 if the wall brackets are fixed on vertical bars already.
5. Use tape measure the di stance between these four
holes of screw thread; get the data of AB, AC, CD, and
BD.
6. Mark A, B, C, D according the data; Suggest it is
installed at least 600mm above floor level.
WARNING: The plug should avoid all water.
Installation Fittings: Needed tools (left of right):
(1)+ (2): Wall hang bracket + set screw
short tube for wall bracket
1. Tape measure
2. Hammer
3. "+" screwdriver
4. Pencil
5. Angle spanner
6. Electric drill
(4) Long screw nail
(5) Plastic expander
(6) Short screw
(7) Hexagonal angle spanner
7. Drill A, B, C, D holes.
8. Use hammer to knock Wall anchor (5) into wall
completely.
9. Insert long screw (4) through bush or short tube (3),
then screw into (5). Wall anchor
1. As shown in the picture, drill the short screw (6) through the hole
of sheet metal of the bracket
(1).
10. Install the bracket onto the bush or short tube (3).
2. Use the short screw (6) to fix the bracket onto the metal pad of
the vertical tube.
11. As shown in the picture, screw the grub screw (2) into
the hole of the bracket (1) by hexagonal spanner; fix the
bracket (1) onto the bush or short tube (3).
3. Screw down the short screw (6) by a screwdriver. Note that the
hole of the bracket (1) should towards the floor when the towel rail is
wall mounted.
12. Fix the rest three brackets by repeating step11. The
installation is finished. Then wipe the tubs cleanly.
4. Fix the rest three brackets (1) to the vertical tubes by repeating
step 1 to 3.
-2-
-3-
(3) 4pc Bushes or 3pc Bushes +1pc
steps if
Accessories of square tubes Accessories of round tubes
Explain
1. Please refer to all the following the wall brackets are taken apart from the
vertical bars.
2. Please refer to the steps 5-12 if the wall brackets are fixed on vertical bars already.
5. Use tape measure the di stance between these four
holes of screw thread; get the data of AB, AC, CD, and
BD.
6. Mark A, B, C, D according the data; Suggest it is
installed at least 600mm above floor level.
WARNING: The plug should avoid all water.
Installation Fittings: Needed tools (left of right):
(1)+ (2): Wall hang bracket + set screw
short tube for wall bracket
1. Tape measure
2. Hammer
3. "+" screwdriver
4. Pencil
5. Angle spanner
6. Electric drill
(4) Long screw nail
(5) Plastic expander
(6) Short screw
(7) Hexagonal angle spanner
7. Drill A, B, C, D holes.
8. Use hammer to knock Wall anchor (5) into wall
completely.
9. Insert long screw (4) through bush or short tube (3),
then screw into (5). Wall anchor
1. As shown in the picture, drill the short screw (6) through the hole
of sheet metal of the bracket
(1).
10. Install the bracket onto the bush or short tube (3).
2. Use the short screw (6) to fix the bracket onto the metal pad of
the vertical tube.
11. As shown in the picture, screw the grub screw (2) into
the hole of the bracket (1) by hexagonal spanner; fix the
bracket (1) onto the bush or short tube (3).
3. Screw down the short screw (6) by a screwdriver. Note that the
hole of the bracket (1) should towards the floor when the towel rail is
wall mounted.
12. Fix the rest three brackets by repeating step11. The
installation is finished. Then wipe the tubs cleanly.
4. Fix the rest three brackets (1) to the vertical tubes by repeating
step 1 to 3.
-2-
-3-
(3) 4pc Bushes or 3pc Bushes +1pc
steps if
Accessories of square tubes Accessories of round tubes
Explain
1. Please refer to all the following the wall brackets are taken apart from the
vertical bars.
2. Please refer to the steps 5-12 if the wall brackets are fixed on vertical bars already.
5. Use tape measure the di stance between these four
holes of screw thread; get the data of AB, AC, CD, and
BD.
6. Mark A, B, C, D according the data; Suggest it is
installed at least 600mm above floor level.
WARNING: The plug should avoid all water.
Installation Fittings: Needed tools (left of right):
(1)+ (2): Wall hang bracket + set screw
short tube for wall bracket
1. Tape measure
2. Hammer
3. "+" screwdriver
4. Pencil
5. Angle spanner
6. Electric drill
(4) Long screw nail
(5) Plastic expander
(6) Short screw
(7) Hexagonal angle spanner
7. Drill A, B, C, D holes.
8. Use hammer to knock Wall anchor (5) into wall
completely.
9. Insert long screw (4) through bush or short tube (3),
then screw into (5). Wall anchor
1. As shown in the picture, drill the short screw (6) through the hole
of sheet metal of the bracket
(1).
10. Install the bracket onto the bush or short tube (3).
2. Use the short screw (6) to fix the bracket onto the metal pad of
the vertical tube.
11. As shown in the picture, screw the grub screw (2) into
the hole of the bracket (1) by hexagonal spanner; fix the
bracket (1) onto the bush or short tube (3).
3. Screw down the short screw (6) by a screwdriver. Note that the
hole of the bracket (1) should towards the floor when the towel rail is
wall mounted.
12. Fix the rest three brackets by repeating step11. The
installation is finished. Then wipe the tubs cleanly.
4. Fix the rest three brackets (1) to the vertical tubes by repeating
step 1 to 3.
-2-
-3-
(3) 4pc Bushes or 3pc Bushes +1pc
steps if
Accessories of square tubes Accessories of round tubes
Explain
1. Please refer to all the following the wall brackets are taken apart from the
vertical bars.
2. Please refer to the steps 5-12 if the wall brackets are fixed on vertical bars already.
5. Use tape measure the di stance between these four
holes of screw thread; get the data of AB, AC, CD, and
BD.
6. Mark A, B, C, D according the data; Suggest it is
installed at least 600mm above floor level.
WARNING: The plug should avoid all water.
Installation Fittings: Needed tools (left of right):
(1)+ (2): Wall hang bracket + set screw
short tube for wall bracket
1. Tape measure
2. Hammer
3. "+" screwdriver
4. Pencil
5. Angle spanner
6. Electric drill
(4) Long screw nail
(5) Plastic expander
(6) Short screw
(7) Hexagonal angle spanner
7. Drill A, B, C, D holes.
8. Use hammer to knock Wall anchor (5) into wall
completely.
9. Insert long screw (4) through bush or short tube (3),
then screw into (5). Wall anchor
1. As shown in the picture, drill the short screw (6) through the hole
of sheet metal of the bracket
(1).
10. Install the bracket onto the bush or short tube (3).
2. Use the short screw (6) to fix the bracket onto the metal pad of
the vertical tube.
11. As shown in the picture, screw the grub screw (2) into
the hole of the bracket (1) by hexagonal spanner; fix the
bracket (1) onto the bush or short tube (3).
3. Screw down the short screw (6) by a screwdriver. Note that the
hole of the bracket (1) should towards the floor when the towel rail is
wall mounted.
12. Fix the rest three brackets by repeating step11. The
installation is finished. Then wipe the tubs cleanly.
4. Fix the rest three brackets (1) to the vertical tubes by repeating
step 1 to 3.
-2-
-3-
(3) 4pc Bushes or 3pc Bushes +1pc
steps if
Accessories of square tubes Accessories of round tubes
Explain
1. Please refer to all the following the wall brackets are taken apart from the
vertical bars.
2. Please refer to the steps 5-12 if the wall brackets are fixed on vertical bars already.
5. Use tape measure the di stance between these four
holes of screw thread; get the data of AB, AC, CD, and
BD.
6. Mark A, B, C, D according the data; Suggest it is
installed at least 600mm above floor level.
WARNING: The plug should avoid all water.
Installation Fittings: Needed tools (left of right):
(1)+ (2): Wall hang bracket + set screw
short tube for wall bracket
1. Tape measure
2. Hammer
3. "+" screwdriver
4. Pencil
5. Angle spanner
6. Electric drill
(4) Long screw nail
(5) Plastic expander
(6) Short screw
(7) Hexagonal angle spanner
7. Drill A, B, C, D holes.
8. Use hammer to knock Wall anchor (5) into wall
completely.
9. Insert long screw (4) through bush or short tube (3),
then screw into (5). Wall anchor
1. As shown in the picture, drill the short screw (6) through the hole
of sheet metal of the bracket
(1).
10. Install the bracket onto the bush or short tube (3).
2. Use the short screw (6) to fix the bracket onto the metal pad of
the vertical tube.
11. As shown in the picture, screw the grub screw (2) into
the hole of the bracket (1) by hexagonal spanner; fix the
bracket (1) onto the bush or short tube (3).
3. Screw down the short screw (6) by a screwdriver. Note that the
hole of the bracket (1) should towards the floor when the towel rail is
wall mounted.
12. Fix the rest three brackets by repeating step11. The
installation is finished. Then wipe the tubs cleanly.
4. Fix the rest three brackets (1) to the vertical tubes by repeating
step 1 to 3.
-2-
-3-
(3) 4pc Bushes or 3pc Bushes +1pc
steps if
Accessories of square tubes Accessories of round tubes
Explain
1. Please refer to all the following the wall brackets are taken apart from the
vertical bars.
2. Please refer to the steps 5-12 if the wall brackets are fixed on vertical bars already.
5. Use tape measure the di stance between these four
holes of screw thread; get the data of AB, AC, CD, and
BD.
6. Mark A, B, C, D according the data; Suggest it is
installed at least 600mm above floor level.
WARNING: The plug should avoid all water.
Installation Fittings: Needed tools (left of right):
(1)+ (2): Wall hang bracket + set screw
short tube for wall bracket
1. Tape measure
2. Hammer
3. "+" screwdriver
4. Pencil
5. Angle spanner
6. Electric drill
(4) Long screw nail
(5) Plastic expander
(6) Short screw
(7) Hexagonal angle spanner
7. Drill A, B, C, D holes.
8. Use hammer to knock Wall anchor (5) into wall
completely.
9. Insert long screw (4) through bush or short tube (3),
then screw into (5). Wall anchor
1. As shown in the picture, drill the short screw (6) through the hole
of sheet metal of the bracket
(1).
10. Install the bracket onto the bush or short tube (3).
2. Use the short screw (6) to fix the bracket onto the metal pad of
the vertical tube.
11. As shown in the picture, screw the grub screw (2) into
the hole of the bracket (1) by hexagonal spanner; fix the
bracket (1) onto the bush or short tube (3).
3. Screw down the short screw (6) by a screwdriver. Note that the
hole of the bracket (1) should towards the floor when the towel rail is
wall mounted.
12. Fix the rest three brackets by repeating step11. The
installation is finished. Then wipe the tubs cleanly.
4. Fix the rest three brackets (1) to the vertical tubes by repeating
step 1 to 3.
-2-
-3-
(3) 4pc Bushes or 3pc Bushes +1pc
Corporate Oce
5701 NW 35 AVE
MIAMI, FL 33142
Phone
1-844-44-ANZZI™
Fax
1-844-Fax-Numb
Email
Web
www.ANZZI.com
v1.2
  • Page 1 1
  • Page 2 2

ANZZI TW-AZ023CH Installation guide

Type
Installation guide

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI