ABB MR100 Startup Procedure

Type
Startup Procedure

This manual is also suitable for

ABB MR100 DSP is a compact, high-resolution spectroradiometer that provides spectrally corrected irradiance and radiance measurements over the UV/VIS/NIR (200nm to 2500nm) range. It combines advanced holographic and Fourier Transform (FT) technologies with a triple-grating monochromator and thermoelectrically cooled detectors. This device is ideal for applications in photometry, colorimetry, and optical radiation measurements.

ABB MR100 DSP is a compact, high-resolution spectroradiometer that provides spectrally corrected irradiance and radiance measurements over the UV/VIS/NIR (200nm to 2500nm) range. It combines advanced holographic and Fourier Transform (FT) technologies with a triple-grating monochromator and thermoelectrically cooled detectors. This device is ideal for applications in photometry, colorimetry, and optical radiation measurements.

MR Series FT
-
Spectroradiometers
Start
-
Up Procedure
This manual contains:
Information on the unpacking and set
-
up of the
MR Series FT
-
Spectroradiometers
.
IMZ8947
Revision
3,1 March 2003
v
TABLE OF CONTENTS
1. INTRODUCTION...............................................................................................................................1
2.
UNPACKING AND SETUP.........................................................................................................
3
2.1
VISUAL INSPECTION .....................................................................................................................................
3
2.2
CARRYING CASES LAYOUT.........................................................................................................................
4
3.
HARDWARE STARTUP...............................................................................................................
5
3.1
CONNECTOR PLATES ....................................................................................................................................
5
3.2
INSTALLATION OF THE
DSP BOARD IN THE HOST COMPUTER.......................................................10
3.3
PUTTING THE BASIC SYSTEM TOGETHER.............................................................................................11
4.
SOFTWARE STARTUP...............................................................................................................14
4.1 S
OFTWARE INSTALLATION ................................................................................................................................14
4.2 E
DIT
ING THE CONFIGURATIO
N FILE
(A
CQUIRE
.
CFG
) .........................................................................................16
4.2.1
Changing the instrument type...................................................................................................................16
4.2.2
Running Research Acquire without instrument........................................................................................16
4.2.3
External Trigger address
setting..............................................................................................................17
5.
SHUTDOWN SEQUENCE AN
D SYSTEM PACKING.......................................17
6.
HANDLING AND CARE OF
HYGROSCOPIC MATERIA
LS....................19
6.1
INTRODUCTION............................................................................................................................................19
6.2
HYGROSCOP
IC MATERIALS......................................................................................................................19
6.3
HANDLING AND CARE................................................................................................................................21
6.3.1
Handling of components...........................................................................................................................21
6.3.2
Storage conditions....................................................................................................................................21
6.3.2.1
Optical materials..................................................................................................................................................... 21
6.3.2.2
Instrumentation.......................................................................................................................................................22
6.3.3
Transport conditions ................................................................................................................................22
6.4
RELATIVE HUMIDITY ................................................................................................................................
.22
6.5
CONCLUSION ................................................................................................................................................24
Start-Up Procedure 1
1.
INTRODU
CTION
This section is intended for users who have not received the operation training but want to get the instrument up
and running. It also contains useful reference information on the set-up of the instrument (hardware and
software) and on packing the i
nstrument in order to ship it.
This section also contains information on the handling of hygroscopic materials and should be studied by
customers having ordered optional hygroscopic optics for their MR system.
Start-Up Procedure 3
2.
UNPACKING AND SETUP
a.
VISUAL INSPECTION
The
MR spectrometer system and its accessories may come in up to 4 different carrying cases depending on the
options selected at purchase.
CASE IDENTIFICATION
CONTENT
SPECTRORADIOMETER
MR100 OR MR200 SERIES SPECTRORADIOMETER
COMPUTER
COMPUTER
MONITOR
KEYB
OARD
MOUSE
BACKUP SOFTWARE
COMPUTER MANUAL FROM ORIGINAL MANUFACTURER
DOS/WINDOWS AND BOMEM GRAMS SOFTWARE
MANUALS
ACCESSORIES
WIDE ANGLE TELESCOPE
MEDIUM ANGLE TELESCOPE
NARROW ANGLE TELESCOPE
MIR DETECTOR(MCT)
NIR DETECTOR(InSb)
CCD CAMERA
CCD CAMERA M
ONITOR
CCD CAMERA POWER SUPPLY
COLD SOURCE
DATA CABLE
WHITE LIGHT ALIGNMENT SOURCE & POWER SUPPLY
FUNNEL FOR FILLING LN
2
DETECTOR DEWARS
THE MANUAL YOU ARE PRESENTLY READING
TRIPOD
TRIPOD
Upon reception of the material check for any external damage to
the carrying cases. If any damage is observed,
please notify the courier and have this stated on the packing slip. This is important for making a claim should the
equipment have been damaged during shipment. Please notify the After Sales Service Departme
nt at ABB.
Before unpacking the system a minimum delay of 12 hours is recommended to allow the equipment to
reach thermal equilibrium with the environment. This will help prevent any moisture condensation on the
optics.
Most MR systems use ZnSe optics whi
ch are non hygroscopic but they can optionally be supplied with
KBr or other hygroscopic materials. When this is the case special precautions need to be taken to avoid
damaging the optics, please refer to “Handling and Care of Hygroscopic Materials”.
MR Series FT-Spectroradiometers
4
b.
CARR
YING CASES LAYOUT
The following figures show the interior layout of the carrying cases.
NARROW ANGLE
TELESCOPE
DETECTOR
DETECTOR
MEDIUM ANGLE
TELESCOPE
WIDE ANGLE
TELESCOPE
CCD CAMERA
MONITOR
CCD CAMERA
POWER SUPPLY
CCD CAMERA
90' INPUT
COLD
SOURCE
DATA CABLE
SPARE
FUNEL
MANUALS
Computer
COMPUTER
OR SPARE
CABLES
MANUALS AND
KEY BOARD
MOUSE
MONITOR
COMPUTER
OR SPARE
COMPUTER
OR SPARE
BACKUP SOFTWARE
MR FT
-
Spectroradiometer
SPECTRORADIOMETER
Accessories
Start-Up Procedure 5
3.
HARDWARE STARTUP
a.
CONNECTOR PLATES
There is only one connection between the Spectroradiometer and
the computer: a 25 pins serial cable for the
MR100 or an optical fibre cable for the MR200. One end of the data cable connects to the respective connector
plate for each instrument as indicated on the next two figures.
MR100 con
nector plate showing DB
-
25 connector
MR100:
In addition to the data connector, the resolution setting knob, the AC power inlet, input power
selection, on-off switch and status LED’s can be found on this connector plate. The POWER led is
always on when t
he instrument is powered up. The other LEDs are used to provide the instrument status
during power and operation. When the instrument is first turned on the SCAN and DATA LEDs comes
on to indicate that the instrument is searching for the ZPD position. Once the ZPD is located the ZPD
LED comes on and the SCAN LED is turned off. When the instrument starts normal scanning the ZPD
MR Series FT-Spectroradiometers
6
LED is off and the DATA LED comes on for every scan to indicate that data is being transferred to the
PC.
The resolution setting kn
ob is used to set the spectral resolution of the instrument. Please note that the
resolution setting of the MR100 is not controlled by software. The resolution setting is effective right
after the selection is made. The scan length is a function of the res
olution setting. After changing this
setting, the frequency at which the DATA LED’s flashes changes accordingly.
Please note that the data cable can be connected or disconnected at any time whether the unit is turned
on or not. Doing so will not harm the
equipment.
MR200 connector plate showing fibre optics connector.
MR200:
In addition to the data connector, the AC power inlet, input power selection, on
-
off switch and status
display can be found on this connector plate. The status display is alw
ays active when the instrument is
powered up. It is used to show the progress of the power up self test sequence and to indicate faults in
the instrument. When the instrument is working correctly the display will show 7, 9 or A depending on
Start-Up Procedure 7
the revision of
the instrument control code. The following table list the meaning of the different status
display states.
Instrument status
display code
Instruments prior to October 1996
Revision A
Instruments prior to April 1997
Revision B
Instruments after April 1997
Revision C
0
start code
start code
start code
1
laser operational
laser operational
laser operational
2
scan motors operational
scan motors operational
scan motors operational
3
initiate ZPD search
scan displacement large enough
for 1 cm
-1
operation
sc
an displacement large
enough for 1 cm
-1
operation
4
ZPD position same as previous
(requires two consecutive identical
ZPD positions)
initiate ZPD search
initiate ZPD search
5
ZPD position not same as previous
(two different consecutive ZPD
positions)
ZPD
position same as previous
(requires two consecutive
identical ZPD positions)
ZPD position same as
previous (requires two
consecutive identical ZPD
positions)
6
ZPD located (requires three
consecutive identical ZPD
positions)
Invalid ZPD position (A ZPD
p
osition must be clearly defined)
Invalid ZPD position (A ZPD
position must be clearly
defined)
7
fringe counter initialisation with
ZPD location successful, normal
scanning
ZPD position not same as
previous (two different
consecutive ZPD positions)
ZPD po
sition not same as
previous (two different
consecutive ZPD positions)
8
ZPD located once (requires three
consecutive identical ZPD
positions)
ZPD located once (requires
three consecutive identical
ZPD positions)
9
fringe counter initialisation
successf
ul, ZPD located three
times at fringe counter zero
position, normal scanning
fringe counter initialisation
successful, ZPD located three
times at fringe counter zero
position
A
normal scanning
The ACTIVE LEDs on the instrument and on the DSP board indicate that the fibre optic link is
functioning properly and that there is communication between the DSP board, located in the computer,
and the unit itself. These LEDs will only turn on when there is power on both the MR200 and the host
computer and when
the fibre optic cable is properly connected.
Please note that the fibre optic data cable can be connected or disconnected at any time whether the unit
is turned on or not. Doing so will not harm the equipment.
For both MR100 and MR200, the other end of t
he data connects to the DSP board which must be installed in the
host computer. The DSP board differs for the MR100 and MR200.
MR Series FT-Spectroradiometers
8
MR100:
The DSP board occupies
two
ISA slots in the host computer. Only one external connector is available
and is used for the connection of the DB-25 serial data cable. The board is displayed on the next two
figures.
Start-Up Procedure 9
MR200:
The DSP board occupies
three
ISA slots in the host computer. Two connectors are available. On is
used for the connection of the fibre optic data cable. The other (DB-25) is an unused RS232 port. This
port could be used to receive RS232 signals coming from an IRIG-B time code converter. The board is
displayed on the next two figures.
MR Series FT-Spectroradiometers
10
b.
INSTALLATION OF THE DSP BOARD IN THE HOST COMPUTER
WARNING:
Do not perform the following instructions while the computer is turned on. Inserting or removing
interface boards from the computer while power is on may permanently damag
e the boards and/or the computer.
The computer, if purchased from ABB comes with the DSP board already installed. It is nevertheless desired to
verify that the DSP board is properly inserted in its slots and that all chips are properly inserted in their s
ockets.
This is especially important for the RAM chips. Please perform a visual inspection of the RAM chips before
applying power on the computer. You may refer to the pictures of the DSP above for their locations on the DSP
board. You may also perform a visual inspection of the proper insertion of the ISA connector in the slot. Should
it look outside or not evenly inserted in the slot, please push gently on the DSP board, making sure that it is well
inserted in the slots.
When the computer is not purchased from ABB, the DSP board comes delivered as a separate item. To install it
in the computer, please proceed as follows:
1. Make sure the power is removed from the computer
2. You must touch the case of the computer to make sure you are properly grounded otherwise you are taking
the risk of permanently damaging the board when inserting it in the computer. Using a ground strap is
recommended.
3.
Remove the cover from the computer. Please refer to your computer manual for instructions.
4.
Once the cover is removed, the
mother board and other existing boards appear as follows:
Start-Up Procedure 11
5. You must locate two adjacent free slots for the installation of the MR100 DSP, three for the MR200. You
may have to re-
arrange the location of existing boards to achieve that
goal.
6. Some blank holding plates (please refer to A on the above picture) may be present and must be removed.
Please keep the screws. They will be required to secure the DSP board after installation.
7. Insert the DSP board as shown in the above picture. Be careful no to interfere with wires and other boards.
A PC computer normally includes some guiding slides (please refer to B on the above picture) which must
be used to ensure that the ISA connector will arrive right on the slot of the motherboard. Make sure that the
edges of the DSP PC board are inserted in these slides before inserting the board.
8. Once the board is fully inserted, apply a bit more pressure for the ISA connector to enter in the slot of the
motherboard.
9.
Once the board is inserted in the slot,
install the screws (please refer to C on the above picture) to secure the
board.
10. At this point, the board is installed. Do not put the cover on the computer right away. You may want to
check that the instrument is fully operational before doing so.
11. Apply p
ower on the computer and make sure that it boots normally, indicating no major hardware problem.
12. At this point, the computer is ready to be connected to the Spectroradiometer to perform a basic
communication test.
c.
PUTTING THE BASIC SYSTEM TOGETHER
An ope
rational Spectroradiometer requires the following basic elements to be interconnected together:
The Spectroradiometer unit must be connected to the computer
One or two detectors must be installed and if cryogenic, must be filled with liquid nitrogen
Power
must be connected and applied to both the spectroradiometer and the computer
In addition, the following equipment may be added to the unit (please refer to the alignment manual for more
information about installation):
A cold source.
An input collimator
if purchased, if not a window is present.
A telescope (can be installed if the input collimator is present).
A video camera and monitor
The following steps must be followed to set
-
up the instrument as a minimal operational system:
1.
Remove the Spectroradi
ometer from its carrying case and install in at a stable location. Two persons are
required to perform this operation. Use the handles located each side of the instrument to carry it. Do not
attempt to do it alone.
2.
Remove the white cover on top of the inst
rument. The cover is held in place by small latches, which must be
loosened.
3.
The instrument has provision for one or two detectors depending on the configuration purchased.
MR Series FT-Spectroradiometers
12
IMPORTANT: Make sure the power is off on the instrument before proceeding to the n
ext step.
4.
Install one or two detectors on the top cover as laid out on the next figure:
5.
When putting the detector module(s) in place, please watch for the two dowel pins that guide the detector to
its proper location. When the detector
module is in place, secure it to the output optics plate by tightening
the two captive screws located at the bottom of the module.
6.
For the MR100, plug the two telephone type connectors into the preamplifier. There are two cables to
connect and the size of
the connectors differs permitting only one location per cable. This is not required for
the MR200 as the connection is made automatically when the detector is installed in place. This is done via
a 50 pin connector installed on the output optics plate. Ma
ke sure that cryogenic detectors are properly filled
with Liquid Nitrogen.
7.
At this point the detector module(s) is(are) in place and the power can be applied to the instrument.
8.
Insert the power cable into the socket located on the connector plate of the in
strument.
9.
Connect the data cable at the proper location on the connector plate of the instrument.
10.
Connect the other end of the cable into the DSP board located inside the computer.
11.
Turn on both the computer and the spectroradiometer.
Start-Up Procedure 13
12.
Watch the status indic
ated on the connector plate of the spectroradiometer and check that the correct LED
sequence is followed.
13.
Start the acquisition software from the computer (please refer to the next section or the software manual)
and go into the alignment/status screen whe
re the interferogram and spectral data are displayed in real time.
14.
At this point, the system is operational and data can be acquired.
MR Series FT-Spectroradiometers
14
4.
SOFTWARE STARTUP
a.
Software installation
Research Acquire requires an IBM compatible computer running DOS 5 or later. It must have a minimum of 4
megabytes of free RAM and at least 10 megabytes of disk space. It will also run under Windows 3.x and
Windows 9x as a DOS program. If ABB supplied your computer, Research Acquire was preinstalled at the
factory. Otherwise, install the software by inserting the distribution diskette into the floppy disk drive and
typing:
A:INSTALL E
Under Windows use the Run command to run install.
This will bring up a dialog box that prompts for an installation directory and an instrument type (see figure 1).
Figure
1
Install screen for Research Acquire
By default the install program will install the software into C: \ACQUIRE but this can be changed to install the
software in any directory on the computer. The install pro gram also needs to know what kind of instrument will
be running with Research Acquire in order to correctly configure the software
1
; use No Instrument on computers
that are only going to be used for post processing and not for data acquisition.
Once the two fields are correctly set, press E to start the installation process. The installation process will
take a few minutes; progress will be reported by a bar graph.
Once the installation is completed the software can be run at any time by typing:
ACQUIRE E
The program will load and after a few seconds the instrument initialisation screen will appear followed after a
short pause by the start-up screen. These screens will look like figures 2 and 3.
1
The settings can be changed at a latter time by editing the config file (see next section ).
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16
  • Page 17 17
  • Page 18 18
  • Page 19 19
  • Page 20 20
  • Page 21 21
  • Page 22 22
  • Page 23 23
  • Page 24 24
  • Page 25 25
  • Page 26 26
  • Page 27 27
  • Page 28 28
  • Page 29 29
  • Page 30 30

ABB MR100 Startup Procedure

Type
Startup Procedure
This manual is also suitable for

ABB MR100 DSP is a compact, high-resolution spectroradiometer that provides spectrally corrected irradiance and radiance measurements over the UV/VIS/NIR (200nm to 2500nm) range. It combines advanced holographic and Fourier Transform (FT) technologies with a triple-grating monochromator and thermoelectrically cooled detectors. This device is ideal for applications in photometry, colorimetry, and optical radiation measurements.

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI