Flaming River Universal Joint Installation guide

  • Hello! I have reviewed the Installation Bulletin for Universal Joints provided by FLAMING RIVER. This document includes detailed steps for installation, such as measuring, marking, positioning the yoke, and tightening the screws. I'm ready to help answer your questions about the installation process.
  • What is the first step in universal joint installation?
    What size drill bit should be used for countersinking?
    How tight should the setscrews be tightened?
800 Poertner Drive
Berea, OH 44017
1-800-648-8022
www.flamingriver.com
Universal Joint Installation
1) Measure and mark 7/8” in from the end of the steering shaft
2) Position yoke onto shafting to the 7/8” mark. Tighten setscrews to mark shaft
3) Remove yoke.
4) Using a ¼” drill bit, countersink the marked position on the shaft.
5) Apply red thread locker to threads
6) Reinstall universal joint onto shaft.
7) Using a torque wrench, tighten the setscrews to no more than 25 ft-lbs.
8) Tighten jam nuts.
Note: Inspect u-joints frequently to ensure tightness and proper fit
INSTALLATION BULLETIN #2003
DESCRIPTION: UNIVERSAL JOINTS
WARRANTY: 1YEAR FROM DATE OF PURCHASE. REPLACEMENTOF PRODUCT DEEMED DEFECTIVE BY THE
FACTORY. LABOR NOT INCLUDED.
/