ET4BE

Tappan ET4BE, CSH4BE, DT4BE, ET4BE-K, JT4BE, Single Phase, MSH4BE Product information

  • Hello! I am an AI chatbot trained to assist you with the Tappan ET4BE Product information. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
SEE ECM WIRING NOTES
CY0
W2
R
E
T1
T2
C
Y
0
0
W2
R
DFT
E
DF1
DF2
DEFROST CONTROL BOARD
CONTACTOR
SINGLE PHASE
FIELD SUPPLY
GROUNDING
LUG
HIGH PRESS.
SWITCH
COMPRESSOR
H
C
T1
T2
T3
CCH
ECM
Defrost
Thermostat
Reversing Valve
Solenoid
Start Capacitor
Start
Relay
1
5
2
ECM WIRING NOTES:
1) FOR 825 RPM ATTACH WHITE TO RIGHT CONTACTOR. (FOR SKUS 919660,919661,919662,919664)
2) FOR 960 RPM ATTACH YELLOW TO RIGHT CONTACTOR. (FOR SKU 919663)
3) FOR 1100 RPM ATTACH WHITE AND YELLOW TO RIGHT CONTACTOR.
BROWN
BLACK
WHITE
YELLOW
BLACK
BLUE
BLACK
BLACK
BLACK
RED
RED
YELLOW/BLACK
YELLOW/BLACK
BLUE
BLACK
BLACK
YELLOW
RED
BLACK
RT
T1
T2
L2
L1
LEFT
GREEN
TO UNIT
GROUND LUG
Compressor
E
Defrost Control Board
DFT
Control
Logic
DF1
DF2
DFT
1
2
3
4
1
R
W2
O
Y
C
T2
T1
R
W2
O
Y
C
RVS
HPS
CC
Split System Heat Pump (Outdoor Section) Single Phase
WIRING DIAGRAM
NOTES:
1. Disconnect all power before servicing.
2. For supply connections use copper conductors only.
3. Not suitable on systems that exceed 150 volts to ground.
4. For replacement wires use conductors suitable for 105˚C.
5. For ampacities and overcurrent protection, see unit rating plate.
6. Connect to 24 vac/40va/class 2 circuit. See furnace/air handler
installation instructions for control circuit and optional
relay/transformer kits.
Defrost Board Operation:
1. Closing during defrost. Rating: 1 Amp.Max
2. Opens during defrost. Rating: 2HP at 230 Vac Max.
3. Closed when “Y” is on. Open when “Y” is off.
Provides “off delay time of 5 min. when “Y” opens.
4. With DFT closed and “Y” closed, compressor run
time is accumulated. Opening of DFT during
defrost or interval period resets the interval to 0.
CC - Contactor Coil
CCH - Crankcase Heater
DFT - Defrost Thermostat
HPS - High Pressure Switch
RVS - Reversing Valve Selenoid
* - Hard Start Kit Field Installed
710658B
(Replaces 710658A)
0312
1. Couper le courant avant de faire letretien.
2. Employez uniquement des conducteurs en cuivre.
3. Ne convient pas aux installations de plus de 150 volt a la terre.
FIELD WIRING
LEGEND:
LOW VOLTAGE
HIGH VOLTAGE
HC
CCH
L1
T1
L2
T2
Compressor
Contacts
ECM
208/230V
R
C
S
/