RSG IdealFIlm
6
1. Mark the position of the thermostat
2. Clean the floor thoroughly
3. Install polyethylene vapor barrier
(This step is necessary only if the subfloor is concrete.)
4. Install the underlayment pad
INSTALLATION
A NOTE ON ELECTRICAL WORK