Ply Gem 310F, 510 2030BLK, 510 3030BLK, 510 3040BLK, 510 3050BLK, 510 3060BLK Operating instructions

  • Hello! I am an AI chatbot trained to assist you with the Ply Gem 310F Operating instructions. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
WHITE
WHITE
PRECAUTIONARY NOTES
•Fortrimandsiding,allow1/8”-1/4”gapallthewayaroundthewindowframe
toallowforexpansion.Ifexteriorisbrickormasonry,leavea3/8“gapbetween
thebottomsillofthewindowandthemasonrytoavoid“brickbinding”.
•Exterior wall systems like stucco and EIFS must be designed to manage
moisturearoundthewindowopening.
•Followthesidingmanufacturer’srequirementsforsealingbetweenthesiding
andwindowframes.
•Any low-expansion foam used should conform to AAMA 812-04 (see
manufacturer’s requirements), but any binding
ordamageofanytypecausedbytheinsulation
willnotbecoveredunderwarranty.
•Donotblockorsealweepholes.
•Donotfastenthroughthesilltrack.
For specific instructions on how to install
units with flange frame configuration
consult www.floridabuilding.org and
www.plygemwindows.com.
NOTE: Where pan flashing is present, do not use flashing that will impede
proper drainage of the pan on the bottom.
NOTE: Over-shimming can cause bowing and prevent proper window operation.
8. (Required)
Aftercheckingtheoperationofthewindow,completethefasteningby
installingfastenersthroughthenailingnaccordingtoChart A.
9. (Recommended)
Followingtheashingmanufacturers’recommendations,apply
ashingtothenailnsandsurroundingwallsurfacestartingwiththebottom,
thenthesides,andnallythetop,creatingashingleeect(referenceFigure 4).
1. (Required)
The Rough Opening should be level,
plumb,andsquare,andshouldbesizedaccording
toFigure 1.
2. (Recommended)
If a weather resistant barrier
is used, follow the barrier manufacturer’s
recommendationsfor treatment of window
openings.
3. (Recommended)
If pan ashing is used, it should
beinstalledatthistime.Followthepanashing
manufacturer’s recommendations (or ASTM
2112 standards), making sure that the product
provides an adequate sill dam height to the
interior.
4. (Required)
Applyagenerous(atleast3/8”bead),
continuous bead of exterior-grade sealant to
ensureanadequatesealbetweenthebackofthe
nailing n and the exterior surface of the rough
opening(referenceFigure3).Thebeadshouldrun
alongtheapproximatelocationofwherethenails/
screwswillgothroughthenailn.If using pan
flashing, do not seal the lower sill nailing fin so
as to provide adequate drainage.
5. (Required)
With the window closed and locked,
placeitintheroughopeningandcenteritfrom
sidetosideandtoptobottom.
6. (Required)
Withasingleapprovedfastener(seeChartA),fastenthewindow
throughthenailnnearthetopcenterofthewindow.
IMPORTANT! READ ALL INSTRUCTIONS
BEFORE BEGINNING INSTALLATION.
Followyour local building codes, customs and
building practices for additional installation
requirements. The manufacturer will accept
no responsibility for air or water leakage
above, under, or around the window unit.
These instructions are general in nature; for
detailed installation instructions by product,
contact Ply Gem Windows at 1-888-9PLYGEM.
7. (Required)
Squarethewindowsidetoside(shimmingifnecessary-seeFigure2)to
maintainsquareandplumbjambs.Makesurethewindowsillandheadareleveland
notcrownedandthejambsarenotbowed.Ifyourwindowisahorizontalsliding
window,makesureeachmeetingrailissupported. 
Figure 1
Figure 2
Consultlocalbuildingcodestoverifythat
sheathingisconsideredaframingmember.
Figure 3 – General Installation
Figure 4
NEW CONSTRUCTION
NAIL FIN INSTALLATION
Chart A -FastenerScheduleforNewConstructionAluminum
Nailfin Fastener Perimeter Spacing 12”
Fastener Distance from Window Corners 6”
Bldg Framing Penetration 11/2”min.
Min. Corrosion-Resistant Nail Size 3/8”MinimumHeaddiameter
Min. Corrosion-Resistant Screw Size
#8orLargerPanHead
Note:Mulledunitsmayhaveadditionalinstructionsattachedtotheunit.
170005000REV.C
/