Part 1: Installing the Compressor, Regulator and Oil
Cooler
1.1 Preparing for installation
1. Drain the coolant.
2. Remove both fender inserts.
3. Remove the radiator stabilizer bar from the driver’s side of the truck.
4. Loosen the OEM clamps on both ends of the intercooler tube, remove all retaining fasteners
and remove the intercooler tube from the engine. This tube will be modified and installed in
the final steps.
5. Remove the coolant expansion bottle.
6. Remove the upper radiator hose and support bracket.
7. Remove the fan from the engine.
8. Remove the fan shroud.
9. Loosen both clamps on the lower radiator hose, but only remove the end that is attached to
the engine.
10. Remove the harmonic balancer.
11. Remove and discard the fastener from the retainer which holds the electrical harness in
place on the top front driver’s side of the timing cover casting.
12. Similarly, remove but keep the hose retainer from the front of the timing cover casting, as the
compressor mounting bracket must be fitted behind the hoses.
13. Clean the engine block in the area where the compressor bracket will be mounted to ensure
that it mounts properly. If there is any contamination behind the bracket, the pulleys may
not line up correctly.
1.2 Installing the bracket and compressor
1. Remove the idler and tensioner from the VR7000 mounting bracket (Figure 1).
2. Shift the electrical harness so that it will be behind the VR7000 bracket when the bracket is
placed on the engine.
DOCUMENT 19282
NOTE
Check the engine to see if there is an oil filler tube on the timing cover. If the engine is
equipped with a filler tube, you will have to remove the tube assembly and replace it with
the VR7000 cover plate (part #32096).