FSR CB-12P Installation guide

Category
Projector mounts
Type
Installation guide
FSR 244 Bergen Boulevard, Woodland Park, NJ 07424, Phone: 973.785.4347 - Fax: 973.785.4207
43189 LIT1317B
POLE MOUNT
PLATE COVER
REMOVE POLE MOUNT PLATE COVER (COVER
SCREWS LOCATED IN INTERIOR OF CEILING BOX).
1a. 1b. REMOVE FLANGE AND MOVE TO ALTERNATE
LOCATION. CHANGE PLUG LOCATION ON THE POLE
MOUNT PLATE COVER AS REQUIRED, AND
RE-INSTALL THE PLATE COVER WITH THE (2)
ORIGINAL SCREWS.
(2) PLUG
1. PRIOR TO CEILING INSTALLATION, DETERMINE MOUNTING LOCATION
OF THE FLANGE FOR THE PROJECTOR MOUNT. IF DEFAULT FACTORY
LOCATION WILL BE USED, PROCEED TO STEP 2. IF CHANGING TO
ALTERNATE LOCATION, FOLLOW STEPS 1a THRU 1b.
NOTE: FLANGE LOCATION CAN BE CHANGED AFTER
CEILING INSTALLATION.
CB-12P INSTALLATION INSTRUCTIONS
MAKE SURE PROJECTOR
MOUNT SET SCREW IS
ORIENTED TOWARDS THE
ACCESS HOLE IN THE POLE
MOUNT PLATE
POLE MOUNT FLANGE
(4) #10 LOCK WASHERS
(4) #10-32 x 3/4" LONG
HEX SCREW
SET SCREW ACCESS HOLE POLE MOUNT PLATE
AVAILABLE KITS (SOLD SEPARATELY):
CB-MNT1 - CABLE INSTALLATION KIT
CB-THRD - THREADED ROD INSTALLATION KIT
NOTE: THREADED ROD IS THE
RECOMMENDED CEILING BOX
MOUNTING SUSPENSION
(SHOWN), TO MINIMIZE
FIXTURE TILTING DUE
TO THE WEIGHT OF ANY
SUSPENDED EQUIPMENT.
NOTE: MAXIMUM GROSS WEIGHT - 110 LBS
INSTALL CB-12P TO A STRUCTURAL CEILING ABLE TO
SUPPORT FIVE TIMES THE NOTED GROSS WEIGHT. USE
APPROPRIATE MOUNTING METHODS BASED ON LOCAL
BUILDING CODES. INSTALL SAFETY CABLE AS REQUIRED BY
LOCAL BUILDING CODES. ROUTE CONDUITS TO BOX AS
REQUIRED.
2.
14 GA. STEEL TIE WIRE MAY BE USED
(SUPPLIED BY CUSTOMER OR USE FSR KIT)
AT 70,000 PSI TENSILE STRENGTH OR
BETTER AS REQUIRED BY BUILDING CODES.
NOTE: WIRES SUPPORT CEILING
BOX, AND ARE NOT SAFETY CABLES
THREADED ROD OR CABLE TO
BE PLUMB WITH CEILING AND FLOOR
ROUTE CONDUIT
(SUPPLIED BY
CUSTOMER) TO
KNOCKOUTS
AS REQUIRED
STRUCTURAL
MEMBER
ALL MOUNTING HARDWARE
SUPPLIED BY CUSTOMER
STRUCTURAL
CHANNEL
BRACKET - FSR'S
THREADED ROD
INSTALLATION KIT
(HARDWARE SUPPLIED
BY CUSTOMER)
COVER SCREWS LOCATED IN
INTERIOR OF CEILING BOX
PART OF
POLE MOUNT
PLATE COVER
FSR Inc.
244 Bergen Boulevard, Woodland Park, NJ 07424
Phone: 973.785.4347 - Fax: 973.785.4207
Web: www.fsrinc.com - E-mail: [email protected]om
10-3/4" x 15-1/4"
DROP CEILING
PANEL MATERIAL
(SUPPLIED BY
CUSTOMER)
3. INSTALL 10-3/4" x 15-1/4" DROP CEILING PANEL MATERIAL
INTO DOOR OF CB-12P. BEND CAPTURE TABS OVER
PANEL TO HOLD PANEL IN PLACE.
(4) CAPTURE TAB
LOOSEN SCREWS
TO OPEN CB-12P DOOR
DOOR IS
REMOVABLE.
(a) PUSH DOOR
UP TOWARDS
CEILING AND
(b) PUSH AWAY
FROM
PROJECTOR
PANEL MOUNT -
REVERSE
PROCEDURE
TO INSTALL
a
b
4. REMOVE SHELF AND MOUNT ELECTRONICS TO SHELF.
USE HOLE/SLOT PATTERN ON SHELF TO MOUNT
EQUIPMENT. ADDITIONAL HOLES MAY BE REQUIRED.
RE-INSTALL SHELF INTO CB-12P. MAKE ELECTRICAL
CONNECTIONS AS REQUIRED.
NOTE: MAXIMUM LOAD PER SHELF - 20 LBS EACH
LOOSEN SCREWS (4 PER SHELF)
TO REMOVE SHELVES
LOOSEN SHELF
SCREWS. (a) PUSH
SHELF TOWARDS
PROJECTOR
MOUNT AND (b) SHELF
WILL DROP DOWN OUT
OF CB-12P
(2) SHELF
b
a
5. INSTALL PROJECTOR MOUNT PIPE INTO CB-12P. SECURE
PIPE WITH SET SCREW. FINISH INSTALLATION PER
MANUFACTURER'S PROJECTOR MOUNT INSTRUCTIONS.
PROJECTOR MOUNT SET
SCREW ACCESS HOLE
PROJECTOR MOUNT PIPE
(SUPPLIED BY CUSTOMER)
NOTE: MAXIMUM PROJECTOR LOAD INCUDING MOUNTED ACCESSORIES - 50 LBS
DISCONNECT
SAFETY CABLE
TO COMPLETELY
REMOVE DOOR
NOTE: THE CENTER OF MASS
OF SUSPENDED EQUIP-
MENT MUST BE WITHIN
A 2.5" RADIUS OF THE
CENTER LINE OF THE
FLANGE MOUNT OF THE
CEILING BOX.
  • Page 1 1
  • Page 2 2

FSR CB-12P Installation guide

Category
Projector mounts
Type
Installation guide

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI