Waterous SL10 LED Operating instructions

Type
Operating instructions

This manual is also suitable for

Pressure Gauge Installation Instructions
Subject:
Revision:
Noshok 3 inch Low Pressure Gauge Installation Instructions
10/05/04 Revision Date: Standards No. 5000042-01
Page 1 of 2
Date Originated:
Hole Preparation and Gauge Mounting
1. Prepare or conrm a 3 3/16" diameter hole in panel.
2. Install gauge through front of panel and secure with panel clamp provided. Check to make sure
gauge is level before tightening clamp.
3.188"
[81mm]
Plumbing the Gauge
1. Install 1/4 FNPT x 6mm tube push-in style low pressure tting provided using standard plumbing
practices.
2. Cut appropriate 6mm tubing as squarely as possible and to the required length.
3. Insert tube into tting using a slight twisting motion.
4. Friction will be evident as the tube slides past the internal O-ring.
5. Continue pushing until the tube bottoms rmly against the internal tube stop.
kPa
bar
0
500
1000
2500
2000
1500
0
5
10
15
20
25
6mm OD
tubing
1/4 FNPT x 6mm
tube tting
kPa
bar
-100
-60
-40
05
-0.2
10
15
20
25
-0.4
-0.6
-0.8
-1.0
0500
1000
1500
2000
2500
-20
-80
B 03/15/08
kPa
bar
0
2000
4000
10000
8000
6000
0
20
40
60
80
100
Pressure Gauge Installation Instructions
Subject:
Revision:
Noshok 3 inch High Pressure Gauge Installation Instructions
10/05/04 03/15/08B Revision Date: Standards No. 5000042-02
Page 2 of 2
Date Originated:
Hole Preparation and Gauge Mounting
1. Prepare or conrm a 3 3/16" diameter hole in panel.
2. Install gauge through front of panel and secure with panel clamp provided. Check to make sure
gauge is level before tightening clamp.
3.188"
[81mm]
6mm OD
high pressure tubing
1/4 FNPT x 6mm tube
Plumbing the Gauge
1. Install 1/4 FNPT x 6mm tube compression style high pressure tting provided using standard
plumbing practices.
2. Cut appropriate 6mm high pressure tubing as squarely as possible and to the required length.
3. Insert tube into tting making sure that it rests rmly on the shoulder of the tube tting body.
4. Establish a starting point by tightening the nut until the tubing will not turn by hand or move axially
in the tting. Scribe the nut at the 6 o'clock position.
5. While holding the tting body steady, tighten the nut 1 1/4 turns to the 9 o-clock position.
6. Pull open (pull up) the vent on the top of the gauge to ensure gauge accuracy.
  • Page 1 1
  • Page 2 2

Waterous SL10 LED Operating instructions

Type
Operating instructions
This manual is also suitable for

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI