PEX 8648 Errata v1.9
© 2011 by PLX Technology, Inc. All rights reserved. 20
with these registers is not affected. Power to the hot plug capable downstream
ports can still be turned on and off normally.
Back to Errata Summary Table
31. Incorrect ACS P2P Completion Routing
Risk Category: Low Silicon Revisions Affected: AA, AB, BB
Description
If the ACS P2P Completion Redirect bit in the ACS Control and Capability
register is set for a downstream port, completions directed to a peer port from a
peer port without the TLP Relaxed Ordering (RO) bit set should be routed to the
upstream port. However, when the following 2 conditions are met, the Switch
incorrectly routes such completions to the peer port instead:
a) The ACS P2P Egress Control bit is active in the ACS Control and
Capability Register.
b) The Egress Control Vector bit in the ACS Control and Capability register
for the associated egress peer is inactive.
Solution/Workaround
There are two possible workarounds:
1. Do not set the ACS P2P Egress control bit in the ACS Control and
Capability register if the ACS P2P Completion Redirect bit is being used in
the switch.
2. Ensure that the Egress Control Vector in the ACS Control and Capability
register of both the peer ports enable or disable the other port in a
symmetric manner. For example, if Peer Port 1 enables Peer Port 2
Egress Control and Peer Port 2 enables Peer Port 1 in the Egress Control
Vector, it is symmetric. Or, if Peer Port 1 disables Peer Port 2 Egress
Control and Peer Port 2 disables Peer Port 1 in the Egress Control Vector,
it is symmetric.
Impact
When the ACS P2P Completion Redirect bit is set, the ACS Egress Control
Vector may affect the ACS P2P Completion Redirect functionality by causing
completions (as described in the Description) to be routed to the incorrect port.
Back to Errata Summary Table
32. ACS Upstream Forwarding Issue
Risk Category: Low Silicon Revisions Affected: AA, AB, BB
Description
If the ACS Upstream Forwarding bit in the ACS Control and Capability register is
set in the downstream port of the Switch, and a completion is received at the
ingress of the downstream port intended for the egress of the same downstream
port, it should be routed upstream. However, with the Switch, if the above