3 Bentone
Table of contents
1. General Information __________________________________ 4
2. Technical data _______________________________________ 7
2.1 Dimensions BG 800 _______________________________ 7
2.2 Capacity range ___________________________________ 8
2.3 Appliance categories ______________________________ 8
2.4 Working field _____________________________________ 9
2.5 Electric Specification EN 60335-2-102 _______________ 9
2.6 Description ______________________________________ 10
3. General instructions _________________________________ 11
3.1 General instructions ______________________________ 11
3.2 Installation and maintenance instructions ____________ 11
3.3 Instructions _____________________________________ 11
3.4 Inspection and maintenance _______________________ 11
3.5 Start up ________________________________________ 11
3.6 Commissioning of installation ______________________ 11
4. Installation _________________________________________ 12
4.1 Delivery check ___________________________________ 12
4.2 Preparations for installation ________________________ 12
4.3 Gas supply ______________________________________ 12
4.4 Electric connection _______________________________ 12
4.5 Setting brake plate and air flow _____________________ 12
4.6 Handling and lifting instruction _____________________ 13
4.7 Mounting on the boiler ____________________________ 14
4.8 Inspection of gas nozzle before commissioning _______ 15
4.9 Leakage control _________________________________ 16
4.10 Gas nozzle ______________________________________ 17
4.11 Setting Damper motor, modulating operation ________ 18
5. Setting the burner ___________________________________ 19
5.1 Setting the air pressure switch _____________________ 19
5.2 Setting the min. gas pressure switch ________________ 20
5.3 Skeleton diagrams _______________________________ 21
5.4 MB-VEF BO1, 415 - 425 __________________________ 22
5.5 Recommended excess air when using default setting __ 25
5.6 Determining the gas quantity for the system __________ 25
5.7 Calculating the quantity of gas supplied _____________ 27
6. Service _____________________________________________ 28
6.1 Servicing the combustion assembly _________________ 28
6.2 Servicing air dampers _____________________________ 29
6.3 Replacement of damper motor, air __________________ 30
6.4 Vibration ________________________________________ 31
6.5 Flame monitoring and ionisation current check ________ 32
6.6 UV-5 detector ___________________________________ 32
7. Handing over of the installation _______________________ 33
8. Fault location, functional troubles _____________________ 33
9. Electric equipment __________________________________ 34
9.1 Safety system ___________________________________ 34
9.2 List of components _______________________________ 34
9.3 Wiring diagram BP230UVFR-S2 ____________________ 35
10. Control __________________________________________ 36
10.1 Technical data ___________________________________ 36
10.2 LED indicator lamps ______________________________ 36
10.3 Explanation of the different sequence modes _________ 37
10.4 BurnerPro LED fault/lock code table ________________ 38
10.5 Leakage control Dungs VPS 504 ___________________ 41
11. Troubleshooting __________________________________ 43
12. General instructions for gasburners _________________ 46