![](//vs1.manuzoid.com/store/data-gzf/9c4641e0cec08277587e45bd4c78e246/2/001018427.htmlex.zip/bg1.jpg)
Observer proper assembly order during termination:
1) Strip cable jacket to expose 1” of wire strands.
2) Install twist separator (C).
3) Separate and order conductors per TIA/EIA 568-A/B.
4) Slide load bar (B) over conductors and separator.
5) Cut conductors flush with the end of the load bar.
6) Insert cable assembly into connector.
7) Terminate using a suitable RJ45 crimping tool.