Reznor B Installation guide

Type
Installation guide

This manual is also suitable for

Reznor B: A Versatile and Powerful Unit Heater for Your Industrial and Commercial Spaces

The Reznor B unit heater is a highly efficient and durable heating solution designed to provide reliable warmth in various industrial and commercial settings. With its robust construction and advanced features, the Reznor B unit heater delivers exceptional heating performance and ease of use. Here are some key capabilities and use cases of this remarkable device:

  • Industrial Heating: The Reznor B unit heater excels in heating large industrial spaces such as factories, warehouses, workshops, and garages. Its powerful airflow and even heat distribution ensure optimal temperature maintenance, enhancing employee comfort and productivity.

Reznor B: A Versatile and Powerful Unit Heater for Your Industrial and Commercial Spaces

The Reznor B unit heater is a highly efficient and durable heating solution designed to provide reliable warmth in various industrial and commercial settings. With its robust construction and advanced features, the Reznor B unit heater delivers exceptional heating performance and ease of use. Here are some key capabilities and use cases of this remarkable device:

  • Industrial Heating: The Reznor B unit heater excels in heating large industrial spaces such as factories, warehouses, workshops, and garages. Its powerful airflow and even heat distribution ensure optimal temperature maintenance, enhancing employee comfort and productivity.
Form I-F/B125-HV, P/N 132794 (Rev 2), Page 1
®
Horizontal/Vertical
Vent Outlet
INSTALLATION FORM I-F/B125-HV
Obsoletes RGM 434-HV125
Applies to: Models F125 and B125
Model F and B 125 unit heaters require field assembly of the vent outlet. Using 17, #10 x 1/2" sheetmetal
screws (16 in the plastic bag and the two screws used to hold the vent outlet pieces in place during shipping),
carefully follow the illustrated instructions on page 2 to assemble the vent outlet.
DANGER: Failure to provide proper venting could result in death, serious injury, and
/or property damage. The unit must be installed with a vent connection and proper vent
to the outside of the building. Follow the instructions on page 2 and the venting
instructions in the installation manual.
WARNING: Improper installation, adjustment,
alteration, service, or maintenance can cause
property damage, injury or death. Read the
installation, operation, and maintenance
instructions thoroughly before installing or
servicing this equipment.
SEE PAGE 2
! CAUTION:
THIS HEATER
REQUIRES ASSEMBLY
OF FLUE OUTLET.
REFER TO
INSTRUCTIONS ON
THIS SHEET.
! CAUTION:
THIS HEATER
REQUIRES ASSEMBLY
OF FLUE OUTLET.
REFER TO
INSTRUCTIONS ON
THIS SHEET.
Form I-F/B125-HV, P/N 132794 (Rev 2), Page 2
1. Remove the two center screws (one on each side) that are holding the
three flue outlet pieces in place during shipping. Use these screws and the
16 screws (#10x1/2" sheetmetal screws) in the plastic bag.
Flue Collar
Assembly
Cover
ASSEMBLY INSTRUCTIONS FOR VENT OUTLET -- Models F 125 and B 125
These instructions and illustrations show the vent outlet being assembled in the horizontal position. To assemble the
vent outlet in the vertical position, follow the instructions reversing the positions of the flue collar assembly (Step 3)
and the cover (Step 4).
(800) 695-1901, www.RezSpec.com
©2014 Reznor, LLC. All rights reserved. Printed in the U.S.A.
Trademark Note: Reznor
®
is registered in the United States and other countries.
0514 OG POD Form I-F/B125-HV (Version 0.1)
The three pieces are: P/N
Flue Collar Support 131992
Flue Collar Assembly 132765
Cover 132764
Slide the flange on the front of
the flue collar support under-
neath the drafthood.
Drafthood
Sheetmetal Screws (5)
Flue Collar
Support
Cover
Sheetmetal
Screws (8)
Flue Collar
Assembly
Sheetmetal Screws (4)
Flue Collar
Support
Front Flange
MUST slide
under top of
heater
2. Attach the Flue
Collar
Support
Position the support with the opening
toward the back of the heater.
Slide the flange on the front of the flue
collar support under the drafthood
(top of the heater).
Fasten with five sheetmetal screws.
3. Attach the Flue Collar Assembly
Position the flue collar
assembly over the rear
opening.
Fasten with four
sheetmetal screws.
Installation NOTE: For vertical vent outlet,
reverse the positions of the flue collar
assembly (Step 3) and the cover (Step 4).
4. Attach the Cover
Position the flat cover.
Fasten on the top and
back with eight sheet-
metal screws.
5. Installation of the vent outlet is complete. When the
outlet is in the horizontal position, it is recom-
mended that a 12-18" piece of straight pipe be
connected to the flue pipe before installing an elbow.
Follow the instructions in the installation manual for
venting the heater.
  • Page 1 1
  • Page 2 2

Reznor B Installation guide

Type
Installation guide
This manual is also suitable for

Reznor B: A Versatile and Powerful Unit Heater for Your Industrial and Commercial Spaces

The Reznor B unit heater is a highly efficient and durable heating solution designed to provide reliable warmth in various industrial and commercial settings. With its robust construction and advanced features, the Reznor B unit heater delivers exceptional heating performance and ease of use. Here are some key capabilities and use cases of this remarkable device:

  • Industrial Heating: The Reznor B unit heater excels in heating large industrial spaces such as factories, warehouses, workshops, and garages. Its powerful airflow and even heat distribution ensure optimal temperature maintenance, enhancing employee comfort and productivity.

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI