cobas s 201 system

Roche cobas s 201 system User manual

  • Hello! I am an AI chatbot trained to assist you with the Roche cobas s 201 system User manual. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
cobas s 201 system Validation Guide for Large Pools 11/2009, Revision 1.0
1
cobas s 201 System
Validation Guide
for Use with Large Pools
(Pools of 24, 48, and 96)
Configuration C MR1
05225329190-01
cobas s 201 system Validation Guide for Large Pools 11/2009, Revision 1.0
2
This page intentionally left blank.
cobas s 201 system Validation Guide for Large Pools 11/2009, Revision 1.0
3
Table of Contents
Preface.......................................................................................................................................................... 7
Revision History .......................................................................................................................................................................... 7
Purpose of this Guide............................................................................................................................................................... 9
How to Use this Guide ...........................................................................................................................................................10
Conventions Used in this Guide .........................................................................................................................................11
References..................................................................................................................................................................................12
Acronyms....................................................................................................................................................................................13
Glossary.......................................................................................................................................................................................14
Section 1: Hamilton Microlab STAR IVD / STARlet IVD Pipettor and Pooling Management
Workstation Validation............................................................................................................................ 15
Traceability Matrix ................................................................................................................................... 16
Traceability Chart.....................................................................................................................................................................16
Installation Qualification (IQ) ................................................................................................................ 17
Overview......................................................................................................................................................................................17
Test Case HIQ-01: Pooling Manager Hardware and Software...............................................................................18
Test Case HIQ-02: Location Verification.........................................................................................................................20
Test Case HIQ-03: Environment Verification.................................................................................................................22
Test Case HIQ-04: Verification of Connections............................................................................................................24
Test Case HIQ-05: Safety and Training Verification...................................................................................................26
Test Case HIQ-06: Consumables ......................................................................................................................................28
Test Case HIQ-07: Documentation Verification...........................................................................................................29
Test Case HIQ-08: Configuration Settings.....................................................................................................................30
Test Case HIQ-09: Verification of Application Security.............................................................................................32
Operational Qualification (OQ).............................................................................................................. 35
Overview......................................................................................................................................................................................35
Dependencies............................................................................................................................................................................37
Test Case HOQ-01: Primary Pooling – Plate Run .........................................................................................................38
Test Case HOQ-02: Primary Pooling – Batch Run........................................................................................................43
Test Case HOQ-03: 2D Pooling (Library Plates Enabled)..........................................................................................50
Test Case HOQ-04: 2D Pooling (Library Plates Disabled).........................................................................................57
Test Case HOQ-05: Resolution Pooling ...........................................................................................................................64
Test Case HOQ-06: Correcting Loading Errors .............................................................................................................70
Test Case HOQ-07: Recovery from Sample Pipetting Errors....................................................................................74
Test Case HOQ-08: Recovery from Control Pipetting Errors....................................................................................79
Test Case HOQ-09: Excluding Donors..............................................................................................................................87
Test Case HOQ-10: Rejecting Library Plate Wells........................................................................................................90
Test Case HOQ-11: Confirmation Pooling.......................................................................................................................95
Test Case HOQ-12: Manual Barcode Entry for Donor Tubes................................................................................ 101
cobas s 201 system Validation Guide for Large Pools 11/2009, Revision 1.0
4
Test Case HOQ-13: Manual Plate Barcode Entry...................................................................................................... 106
Test Case HOQ-14: Rejecting Pools............................................................................................................................... 111
Test Case HOQ-15: Repeat Batch Run.......................................................................................................................... 118
Test Case HOQ-16: Aborting a Pooling Run ............................................................................................................... 121
Performance Qualification (PQ)..........................................................................................................123
Overview................................................................................................................................................................................... 123
Section 2: COBAS
®
AmpliPrep Instrument, Optional Docking Station, and AMPLILINK
Software Validation................................................................................................................................127
Traceability Matrix .................................................................................................................................128
Installation Qualification (IQ) ..............................................................................................................129
Overview................................................................................................................................................................................... 129
Materials................................................................................................................................................................................... 129
General Prerequisites .......................................................................................................................................................... 129
Dependencies......................................................................................................................................................................... 129
Test Case APIQ-01: Work Area Verification ................................................................................................................ 130
Test Case APIQ-02: Reagent Storage Area Verification.......................................................................................... 132
Test Case APIQ-03: Hardware and Software Verification ...................................................................................... 134
Test Case APIQ-04: Location Verification................................................................................................................... 137
Test Case APIQ-05: Environment Verification ........................................................................................................... 139
Test Case APIQ-06: Connections and Accessories................................................................................................. 141
Test Case APIQ-07: Safety and Training ..................................................................................................................... 143
Test Case APIQ-08: Documentation ............................................................................................................................. 145
Test Case APIQ-09: Consumables................................................................................................................................. 146
Test Case APIQ-10: Configuration Settings ............................................................................................................... 147
Test Case APIQ-11: Security............................................................................................................................................ 150
Operational Qualification (OQ)............................................................................................................155
Overview................................................................................................................................................................................... 155
Materials................................................................................................................................................................................... 155
Documentation ...................................................................................................................................................................... 155
General Prerequisites .......................................................................................................................................................... 156
Dependencies......................................................................................................................................................................... 157
Test Case APOQ-01: Loading Reagents....................................................................................................................... 158
Test Case APOQ-02: Loading Consumables............................................................................................................... 161
Test Case APOQ-03: Routine Sample Preparation Run.......................................................................................... 165
Test Case APOQ-04: Error Handling for Reagents on Incorrect Rack............................................................... 172
Test Case APOQ-05: Extracting Resolution Pools..................................................................................................... 179
Test Case APOQ-06: Handling Loading Errors........................................................................................................... 185
Test Case APOQ-07: Handling Reagent Barcode Reading Errors....................................................................... 194
Test Case APOQ-08: Error Handling for Empty Reagent Cassettes.................................................................... 201
Test Case APOQ-09: Error Handling for Expired Reagents ................................................................................... 204
Test Case APOQ-10: Examining System and Rack Status Indicators ................................................................ 207
cobas s 201 system Validation Guide for Large Pools 11/2009, Revision 1.0
5
Test Case APOQ-11: Status Indicators, Logs, and Problem Reports.................................................................. 209
Performance Qualification (PQ)..........................................................................................................213
Overview................................................................................................................................................................................... 213
Section 3: COBAS
®
TaqMan
®
Analyzer and AMPLILINK Software Validation..........................215
Traceability Matrix .................................................................................................................................216
Installation Qualification (IQ) ..............................................................................................................217
Overview................................................................................................................................................................................... 217
Materials................................................................................................................................................................................... 217
General Prerequisites .......................................................................................................................................................... 217
Dependencies......................................................................................................................................................................... 217
Test Case TMIQ-01: Work Area Verification ............................................................................................................... 218
Test Case TMIQ-02: Hardware and Software Verification ..................................................................................... 220
Test Case TMIQ-03: Location Verification.................................................................................................................. 223
Test Case TMIQ-04: Environment Verification .......................................................................................................... 225
Test Case TMIQ-05: Connections and Accessories ................................................................................................ 227
Test Case TMIQ-06: Safety and Training..................................................................................................................... 229
Test Case TMIQ-07: Documentation ............................................................................................................................ 231
Test Case TMIQ-08: Consumables................................................................................................................................ 232
Test Case TMIQ-09: Configuration Settings............................................................................................................... 233
Test Case TMIQ-10: Security........................................................................................................................................... 236
Operational Qualification (OQ)............................................................................................................241
Overview................................................................................................................................................................................... 241
Materials................................................................................................................................................................................... 241
Documentation ...................................................................................................................................................................... 241
General Prerequisites .......................................................................................................................................................... 242
Dependencies......................................................................................................................................................................... 243
Test Case TMOQ-01: Analyzing Primary Pools........................................................................................................... 244
Test Case TMOQ-02: Accepting Results on AMPLILINK Software .................................................................... 248
Test Case TMOQ-03: Analyzing 2D Pools.................................................................................................................... 252
Test Case TMOQ-04: Analyzing Resolution Pools..................................................................................................... 256
Test Case TMOQ-05: Blocked Samples........................................................................................................................ 260
Test Case TMOQ-06: Analyzing a Short Primary Pool............................................................................................. 265
Test Case TMOQ-07: Analyzing Confirmation Pools................................................................................................ 269
Test Case TMOQ-08: Status Indicators, Logs, and Problem Reports.................................................................273
Performance Qualification (PQ)..........................................................................................................277
Overview................................................................................................................................................................................... 277
Section 4: Roche PDM Data Manager Software Validation..........................................................279
Traceability Matrix .................................................................................................................................280
Installation Qualification (IQ) ..............................................................................................................281
cobas s 201 system Validation Guide for Large Pools 11/2009, Revision 1.0
6
Overview................................................................................................................................................................................... 281
Test Case PIQ-01: Data Management Workstation and Software.....................................................................282
Test Case PIQ-02: Data Manager Communication.................................................................................................. 284
Test Case PIQ-03: PDM Server Hardware .................................................................................................................. 286
Test Case PIQ-04: Safety and Training ........................................................................................................................ 288
Test Case PIQ-05: Documentation ................................................................................................................................ 290
Test Case PIQ-06: Configuration Security................................................................................................................... 291
Operational Qualification (OQ)............................................................................................................297
Overview................................................................................................................................................................................... 297
Test Case POQ-01: Reviewing Results from Primary Pools ................................................................................... 300
Test Case POQ-02: Reviewing Results from 2D Pools............................................................................................. 307
Test Case POQ-03: Reviewing Resolution Results.................................................................................................... 313
Test Case POQ-04: Reviewing a Short Pool and UDECs ........................................................................................ 317
Test Case POQ-05: Reviewing Confirmation Results............................................................................................... 322
Test Case POQ-06: Defining UDECs.............................................................................................................................. 327
Performance Qualification (PQ)..........................................................................................................333
Overview................................................................................................................................................................................... 333
Appendix: The Validation Process ......................................................................................................337
Introduction............................................................................................................................................................................. 339
Defining User Requirements............................................................................................................................................. 340
Selecting the System............................................................................................................................................................ 340
Analyzing Risk........................................................................................................................................................................ 341
Preparing a Validation Plan............................................................................................................................................... 342
Executing the Validation Plan........................................................................................................................................... 343
Specifying Corrective Action............................................................................................................................................. 345
Using a Waiver Report ........................................................................................................................................................ 345
Preparing the Validation Report ...................................................................................................................................... 345
Forms......................................................................................................................................................................................... 346
cobas s 201 system Validation Guide for Large Pools 11/2009, Revision 1.0
7
Preface
Revision History
Manual Version Date Action
1.0 November 2009 Original document.
Roche Diagnostics Ltd.
CH-6343 Rotkreuz
Switzerland
Distributed by
Roche Diagnostics
Indianapolis, IN 46256 USA
(For Technical Assistance call the
Roche Response Center
toll-free 1-800 526 1247)
Roche Diagnostics
H7V 4A2 Laval, Quebec
(For Technical Assistance call:
Pour toute assistance technique,
appeler le: 1-877 273 3433)
Roche Diagnostics (Schweiz) AG
CH-6343 Rotkreuz
Roche Diagnostics
F-38240 Meylan
Roche Diagnostics GmbH
D-68298 Mannheim, Germany
Distributore in Italia:
Roche Diagnostics SpA
Piazza Durante 11
I-20131 Milano
Roche Diagnostics S.L.
E-08006 Barcelona
Distribuidor em Portugal:
Roche Farmacêutica Química, Lda
P-2700 Amadora
cobas s 201 system Validation Guide for Large Pools 11/2009, Revision 1.0
8
Questions or comments regarding the contents of this guide can be directed to the
address below or to your Roche representative.
Roche Molecular Systems, Inc.
4300 Hacienda Drive
Pleasanton, California 94588-2722
ROCHE, AMPERASE, AMPLILINK, COBAS, COBAS S, AMPLIPREP, TAQSCREEN,
and TAQMAN are trademarks of Roche.
ROCHE RESPONSE CENTER is a servicemark of Roche.
HP and StorageWorks are trademarks of Hewlett-Packard Company in the United States
and/or other countries.
Microlab is a registered trademark of Hamilton Company.
Microsoft and Windows are either registered trademarks or trademarks of Microsoft
Corporation in the United States and/or other countries.
Pentium is a registered trademark of Intel Corporation.
Copyright © 2009. Roche Molecular Systems, Inc. All rights reserved.
cobas s 201 system Validation Guide for Large Pools 11/2009, Revision 1.0
9
Purpose of this Guide
The cobas s 201 system includes hardware, software, and reagents. This Validation Guide
assists users in establishing Quality Assurance (QA) procedures with regard to all the
cobas s 201 system components that are used when testing blood products.
The purpose of this Validation Guide is to assist users of the cobas s 201 system in creating
a site-specific Validation Plan to qualify their system according to current guidelines. This
Validation Guide should be used only as a guideline, and users may elect to use, modify,
or not use each section as they deem appropriate.
Refer to the cobas s 201 system Operator’s Manuals for a complete description of the
cobas s 201 system. Refer to the assay-specific package inserts for instructions on
collection, storage, and handling of samples.
cobas s 201 system Validation Guide for Large Pools 11/2009, Revision 1.0
10
How to Use this Guide
Preface
Lists the reference materials that were used to
prepare this Validation Guide and the terms and
acronyms that are used.
Hamilton Microlab
STAR IVD / STARlet
IVD Pipettor and
Pooling Management
Workstation
Provides sample test cases that can be used to
assist in preparing a Hamilton Microlab STAR
IVD / STARlet IVD Pipettor, Roche PDM Pooling
Wizard software, and Roche PDM Pooling
Manager software Validation Plan for your
facility. The user can select those parts of this
section that are applicable for the validation and
modify them as needed.
COBAS
®
AmpliPrep
Instrument and
AMPLILINK Software
Provides sample test cases that can be used to
assist in preparing a COBAS
®
AmpliPrep
Instrument and AMPLILINK software Validation
Plan for your facility. The user can select those
parts of this section that are applicable for the
validation and modify them as needed.
COBAS
®
TaqMan
®
Analyzer and
AMPLILINK Software
Provides sample test cases that can be used to
assist in preparing a COBAS
®
TaqMan
®
Analyzer
and AMPLILINK software Validation Plan for
your facility. The user can select those parts of
this section that are applicable for the validation
and modify them as needed.
Data Manager
Software
Provides sample test cases that can be used to
assist in preparing a Roche PDM Data Manager
and Administrator Software Validation Plan for
your facility. The user can select those parts of
this section that are applicable for the validation
and modify them as needed.
Appendix
Provides an overview of the validation process
and describes how the validation plan is
developed. Templates for commonly used
validation forms are also provided.
cobas s 201 system Validation Guide for Large Pools 11/2009, Revision 1.0
11
Conventions Used in this Guide
Italics
Indicates a reference to another section of this guide or an
external document. For example:
Refer to the cobas s 201 system Hardware and Software
Reference Manual for a complete description of the cobas s
201 system.
Italics are also used for field, screen, and dialog box titles. For
example:
The Begin Logon dialog box is displayed.
Bold
Emphasizes a term or component that is being described or
indicates a keyboard entry or mouse selection. For example:
Press F1 to display online Help.
Select Export from the File menu.
“Quotes” Designates keyboard input that should be typed exactly as
shown. For example:
Enter “GUEST” then click OK.
1 First Item
2 Second Item
Used to number procedures that should be performed
sequentially and to uniquely identify system requirements.
[Brackets] Indicates a cross-reference to an external document. Outside
source material used in the preparation of the Validation Guide
is listed in the References section. A bracketed category name
and sequential number precede each entry. For example the
first referenced FDA document is listed:
[FDA-1] CFR Title 21
> Separates command options in a multi-level command. For
example:
Select Control Panel > Help > About Windows
+ Indicates more than one key should be pressed
simultaneously. For example:
Press the Ctrl+Alt+Del keys.
cobas s 201 system Validation Guide for Large Pools 11/2009, Revision 1.0
12
References
(as of the date of this publication)
The following documents were used as sources of information for this Validation Guide:
[AABB-1] Facts About Blood And Blood Banking, AABB Web site:
www.aabb.org/All_About_Blood/FAQs/aabb_faqs.htm
[FDA-1] U.S. Government Code of Federal Regulations (CFR) Title 21 - Food and
Drugs.
[FDA-2] General Principles of Software Validation; Final Guidance for Industry
and FDA Staff (January 11, 2002).
[FDA-3] Glossary of Computerized System and Software Development
Terminology, 1995.
[FDA-4] Guideline on General Principles of Process Validation, May, 1987.
[FDA-5] Docket No. 91N-0450, Guideline for Quality Assurance in Blood
Establishments, July 11, 1995.
[FDA-6] CBER publication "Commemorating 100 Years of Biologics Regulation”,
March 2002.
[FDA-7] CBER publication "Guidance for Industry Q7A Good Manufacturing
Practice Guidance for Active Pharmaceutical Ingredients”, August 2001.
[FDA-8] Medical Device Quality System Manual, HHS Publication FDA 97-4179,
December 1996. Available online at www.fda.gov/cdrh/qsr/
[FDA-9] Development of West Nile virus Testing and Donor screening as a Model
for Screening Bioterrorist Agents, Hira Nakhasi, Ph.D., Director,
DETTD/OBRR, CBER, FDA
[FMEA-1] An Introduction to Risk/Hazard Analysis for Medical Devices; Daniel
Kamm, P.E., C.Q.A.
[GAMP-1] GAMP Good Practice Guide: Validation of Process Control Systems
(VPCS), October 2003.
[GOV-1] GPO Access Web site: http://www.gpoaccess.gov/cfr/index.html. A service
of the U.S. Government Printing Office.
[CEFIC-1] CEFIC Task Force – Computer Validation Guide, ver. 2, December, 2002.
[IEEE-1] IEEE-STD-829-1998; IEEE Standard for Software Test Documentation,
Institute of Electrical and Electronics Engineers, New York.
[ISBT-1] Guidelines for validation and maintaining the validation state of
automated systems in blood banking, July 2003.
[RMS-1]
Roche Diagnostics Web site: www.roche-diagnostics.com/quality.html (2006).
[RMS-2] cobas s 201 system Operator’s Manual for Use with Large Pools
[RMS-3] cobas s 201 system Hardware and Software Reference Manual
[RMS-4] cobas s 201 system PDM Software Administrator’s Guide
[RMS-5] cobas s 201 system Facilities Guide
[RMS-6] cobas s 201 system Operator’s Manual Supplement for Use of the
Docking Station
cobas s 201 system Validation Guide for Large Pools 11/2009, Revision 1.0
13
Acronyms
The following acronyms are used in this guide:
CBER Center for Biologics Evaluation and Research
CFR Code of Federal Regulations
DNA Deoxyribonucleic Acid
DR Discrepancy Report
FDA U.S. Food and Drug Administration
FMEA Failure Mode Effects Analysis
GAMP Good Automated Manufacturing Practices
HBV Hepatitis B Virus
HCV Hepatitis C Virus
HIV Human Immunodeficiency Virus
IEEE Institute of Electrical and Electronics Engineers
IQ Installation Qualification
ISBT International Society for Blood Transfusion
LAN Local Area Network
LIS Laboratory Information System
MB Megabyte
MHz Megahertz
MPX Multiplexed set of targets: HCV, HBV, HIV-1 (Group M and O), HIV-2
OQ Operational Qualification
PCR Polymerase Chain Reaction
PQ Performance Qualification
QA Quality Assurance
RMEC Roche-Manufactured External Control
RMS Roche Molecular Systems, Inc.
RNA Ribonucleic Acid
TCx Thermal Cycler A, B, C, or D
UDEC User-Defined External Control
URS User Requirements Specification
V Volts
VAC Volts Alternating Current
cobas s 201 system Validation Guide for Large Pools 11/2009, Revision 1.0
14
Glossary
Code of Federal
Regulations
The Code of Federal Regulations (CFR) is the codification of the general
and permanent rules published in the Federal Register by the executive
departments and agencies of the Federal Government. It is divided into 50
titles that represent broad areas subject to Federal regulation.
1
CFR Title 21, FDA, is referenced in this guide.
Concurrent
Validation
Testing that thoroughly monitors the process, allowing tested product to
be released for use. This method can be used when a previously validated
process is modified.
Installation
Qualification
Documented verification that the system, including all software and
hardware components, has been installed correctly.
Operational
Qualification
Documented verification that the system meets all its requirements under
all anticipated operating conditions including boundary and extreme test
cases.
Performance
Qualification
Documented verification that the system produces acceptable results
under normal operating conditions in the customer environment.
Prospective
Validation
Testing that is performed before the product is used.
Quality
Assurance
The actions, planned and performed, to provide confidence that all
systems and components that influence the quality of the product are
working as expected individually and collectively.
2
Quality Control The operational techniques and procedures used to achieve quality
requirements.
2
Retrospective
Validation
Testing that is performed on representative batches of the product after
the product is released. This method is reserved for a well-established
process that has undergone a change that does not affect product quality.
Validation Establishing documented evidence that a process will consistently
perform effectively according to its intended use.
Validation Plan The written and approved document of an experimental sequence of tests,
that when executed as prescribed, are intended to produce documented
evidence that the equipment or system conforms to user needs and
intended uses, and that the particular requirements implemented can be
consistently fulfilled.
For additional information, refer to the Medical Device Quality Systems Manual.
3
1
[GOV-1]
2
[FDA-3]
3
[FDA-8]
cobas s 201 system Validation Guide for Large Pools 11/2009, Revision 1.0
15
Section 1: Hamilton Microlab
STAR IVD / STARlet IVD Pipettor and Pooling
Management Workstation Validation
This section can be used to assist in preparing a Hamilton Microlab STAR IVD / STARlet IVD Pipettor, PDM Pooling Wizard
software, and PDM Pooling Manager software Validation Plan for your facility.
The contents of this section and the test cases are intended only to be used as a guide. The user can select those parts of this
section that are applicable for the validation and modify them as needed.
Hamilton Microlab STAR IVD / STARlet IVD Pipettor and Roche PDM Pooling Manager Software Validation
Traceability Matrix Traceability Chart
cobas s 201 system Validation Guide for Large Pools 11/2009, Revision 1.0
16
Traceability Matrix
Requirements for the Hamilton Microlab STAR IVD / STARlet IVD Pipettor, PDM Pooling Wizard software, and PDM Pooling
Manager software and the test case(s) that validate each requirement are summarized below.
Traceability Chart
Requirements Test Case(s)
Hardware and Software HIQ-01
Location HIQ-02
Environment HIQ-03
Connections and Accessories HIQ-04
Safety and Training HIQ-05
Consumables HIQ-06
Documentation HIQ-07
Configuration Settings HIQ-08
Security HIQ-09
Operation HOQ-01 through HOQ-16
Validity Checking HOQ-06, HOQ-07, HOQ-08, HOQ-12, HQO-13
Results Analysis See POQ-01 through POQ-05
Data Management and Reporting See POQ-01 through POQ-05
Audit Log See POQ-01 through POQ-05
Alarms HOQ-01 through HOQ-16
Throughput and Capacity HOQ-01, HOQ-02
Hamilton Microlab STAR IVD / STARlet IVD Pipettor and Roche PDM Pooling Manager Software Validation
Installation Qualification (IQ) Overview
cobas s 201 system Validation Guide for Large Pools 11/2009, Revision 1.0
17
Installation Qualification (IQ)
Overview
The Installation Qualification (IQ) verifies that the Hamilton Microlab STAR IVD / STARlet IVD Pipettor and Pooling Management
Workstation software have been installed correctly.
Materials
No special materials are required to perform the IQ.
General Prerequisites
Each IQ test case lists prerequisites required to begin the test case. Additionally, all IQ testing assumes that:
1 The vendor properly installed the system.
2 The operator is familiar with general computer operation and the Windows operating system.
Dependencies
All test cases in the IQ section are designed so they can be run independently.
Hamilton Microlab STAR IVD / STARlet IVD Pipettor and Roche PDM Pooling Manager Software Validation
Installation Qualification (IQ) Test Case HIQ-01: Pooling Manager Hardware and Software
cobas s 201 system Validation Guide for Large Pools 11/2009, Revision 1.0
18
Test Case HIQ-01: Pooling Manager Hardware and Software
Purpose
This test case verifies that the correct hardware and software are installed for the Pooling Management Workstation.
Prerequisites
This test case assumes the operator:
Has a login ID and password that allow access to the PDM Pooling Wizard and PDM Pooling Manager.
Record the login ID: _________________________________
Acceptance Criteria
This test case is complete and passes when the Expected Result has been obtained and entered in the Observed Result box, Pass is
circled in the Pass/Fail column for each step, and (if required by your facility) each completed step is initialed and dated.
Procedure
Step Action Expected Result Observed Result Pass/Fail By/Date
1
Power on the Pooling Management
Workstation if it is powered off.
A prompt is displayed to press the
CTRL+ALT+DEL keys simultaneously to
logon.
Pass Fail
________
________
2 Press CTRL+ALT+DEL.
The Welcome to Roche PDM dialog box is
displayed.
Pass Fail
________
________
3
Enter the login ID and password
recorded in the Prerequisites
section and then click OK.
The PDM Pooling Manager is started and
the Query tab is displayed. The software
version is displayed in the title bar.
PDM Pooling Manager software version:
__________________________________
Pass Fail
________
________
Hamilton Microlab STAR IVD / STARlet IVD Pipettor and Roche PDM Pooling Manager Software Validation
Installation Qualification (IQ) Test Case HIQ-01: Pooling Manager Hardware and Software
cobas s 201 system Validation Guide for Large Pools 11/2009, Revision 1.0
19
Step Action Expected Result Observed Result Pass/Fail By/Date
4 Click the Wizard button located on
right side of the Query tab.
Record the software version for
PDM Pooling Wizard software.
The PDM Pooling Wizard main screen is
displayed. The software version is
displayed in the title bar.
PDM Pooling Wizard software version:
__________________________________
Pass Fail
________
________
5 Click Exit.
The PDM Pooling Wizard application
closes. The PDM Pooling Manager Query
tab is displayed.
Pass Fail
________
________
6 Click the Logoff button located on
right side of the Query tab.
The logoff is successful and a prompt is
displayed to press CTRL, ALT, DEL to
logon.
Pass Fail
________
________
Results
Acceptable ________ Unacceptable _________
Comments ________________________________________________________________________________________________________________
__________________________________________________________________________________________________________________________
__________________________________________________________________________________________________________________________
Performed By _______________________________________ Date _________________
Verified By _______________________________________ Date _________________
Hamilton Microlab STAR IVD / STARlet IVD Pipettor and Roche PDM Pooling Manager Software Validation
Installation Qualification (IQ) Test Case HIQ-02: Location Verification
cobas s 201 system Validation Guide for Large Pools 11/2009, Revision 1.0
20
Test Case HIQ-02: Location Verification
Purpose
This test case verifies proper positioning of the Hamilton Microlab STAR IVD / STARlet IVD Pipettor.
Prerequisites
None.
Acceptance Criteria
This test case is complete and passes when the Expected Result has been obtained and entered in the Observed Result box, Pass is
circled in the Pass/Fail column for each step, and (if required by your facility) each completed step is initialed and dated.
Procedure
Action Expected Result Observed Result Pass/Fail By/Date
1
Examine the front and sides of the
Hamilton Microlab STAR IVD /
STARlet IVD Pipettor.
Personnel have access at the front and
sides of the instrument, for operation,
maintenance, and opening of the
protective covers.
Pass Fail
________
________
2
Examine the rear of the Hamilton
Microlab STAR IVD / STARlet IVD
Pipettor.
There is sufficient space for ventilation. Pass Fail
________
________
3
Examine the Hamilton Microlab
STAR IVD / STARlet IVD Pipettor
location.
The Hamilton Microlab STAR IVD /
STARlet IVD Pipettor is positioned away
from:
heating ducts
air conditioning vents
direct sunlight
intense artificial light
laboratory equipment that emits
electromagnetic RF fields (e.g., X-ray
machine, elevator)
Pass Fail
________
________
Note: There are no special location requirements for the Pooling Management Workstation. The USB cable length limits its proximity to the instrument.
/