Stratco HM5 Hinged Door Installation guide

Type
Installation guide
HANDI-MATE HM5 HINGED DOOR SHED INSTALLATION GUIDE
HANDI-MATEHM5 HINGED DOOR SHED
BEFORE YOU START
To ensure that the installation and erection of your Stratco Handi-Mate™ Shed proceeds smoothly you should confirm that all
the components and materials listed on the delivery documentation and in this installation guide have been supplied. Details
for ordering individual components can be found in the “Component Index” section at the end of this document.
Carefully read this installation guide to familiarise yourself with all the steps involved and ensure that you have the correct tools
and equipment for the job.
There are dierent types and colours of screws. Ensure that the right type and colour screw is being used at each location.
Use heavy gloves when handling steel sheeting and flashings and never attempt to install a shed in windy conditions.
It is important that you contact your local government authority to determine if building approval is required.
Stability and performance of the shed relies on the door being closed during high wind events.
It is essential to clear and level the site prior to assembling your Stratco Handi-Mate™ Shed.
Do not traverse the roof of the Handi-Mate™.
The installer is responsible for ensuring the slab or concrete pads are sucient to support the shed and sustain wind loading.
Do not directly anchor your shed to pavers. All Stratco Handi-Mate™ Sheds must be securely bolted to a permanent concrete
base with sucient masonry anchors as specified in Figure 4.4 to prevent wind uplift.
Option 1 - Before building the shed, pour a base that is larger than the area by at least 200mm in each direction. The
base should be poured so the concrete outside the shed floor area slopes away from the shed to help prevent water from
entering the shed.
Option 2 - Substantial concrete pads may be used at each anchor location as an alternative to a complete concrete floor.
It is recommended pads are minimum Ø250mm x 400mm deep, embedded into a firm natural soil base.
Where necessary, components are marked with a coloured sticker as to easily dierentiate one from another. Components are
referenced throughout the installation guide by their colour. For example, Panel (Short) is marked with a red sticker.
SHED WINDOWS OPTIONAL
Stratco Shed Windows are available as an optional add-on, available in both Louvre and Sliding variations. Handi-Mate Windows
should be purchased along side the Handi-Mate Shed and installed during the Handi-Mate Shed assembly. Refer to the “Window
Installation” section if installing a Stratco Window, or visit your local Stratco store for more information.
HANDI-MATE HM5 HINGED DOOR SHED INSTALLATION GUIDE
HANDIMATE™ DIMENSIONS
TOOLS REQUIRED
Rivet Gun Power Drill PH2 Phillips Head Bit
(Supplied)
3/16 Hex Head Bit
(Supplied)
Adjustable Spanner 3.5mm Bit (Supplied)
12mm Bit
10mm Masonry Bit
Gloves Safety Glasses Step Ladder 2 x Trestles Permanent Marker Tape Measure
2.00
2.17
2.21
2.15
2.15
2.00
2.17
2.21
2.15
2.15
Stratco Handi-Mate Shed Windows are available as an optional add-on. For HM5 size Handi-Mates, the Window can be
installed to the centre of the rear or side wall. Handi-Mate Windows should be installed during the Handi-Mate Shed assembly.
Refer to the “Window Installation” section at the end of this document if installing a Stratco Window, or visit a Stratco store for
more information.
HANDIMATE™ SHED WINDOWS
COMPONENTS
x 1 x 1
x 1
x 8 x 1
x 2 x 2 x 1 x 1 x 1
x 8 x 8
x 1
x 12
x 25
x 3
x 100
x 60 x 22
Ridge Cap
Short
Long
Ridge Beam
Door Shroud
Door JambDoor Wall Channel
L/H Barge Cap R/H Barge Cap
Coloured Rivet
10x25 Hex-Head
Coloured Screw
(with neo washer)
10x16 Hex-Head
Coloured Screw
(with neo washer)
10x16 Hex-Head
Screw
Door Handle Door Tongue Hold Down
Lug
M8x47 Masonry
Anchor
Corner
Bracket
10x16 Wafer- Head
Screw
HANDI-MATE HM5 HINGED DOOR SHED INSTALLATION GUIDE
COMPONENTS
x 1 x 4 x 6 x 6
Split Wall Sheet Corner Wall Sheet Wall Sheet Roof Sheet
REAR WALL ASSEMBLY
When assembling the Wall and Door Sheets, lay the sheets
down on trestles / blocks (Figure 1.1). This will make assembly
easier and reduce the risk of damage to components.
Trestles / Blocks
Wall Channel
10x16mm Hex-Head Screw
Fasten through
pilot holes first
Sheet Crest
Fasten middle
Screws secondly
The ‘Sheet Crest, as referenced throughout this guide, refers
to the curved top faces of the sheet.
FIGURE 1.0
ASSEMBLY HANDY HINTS
FIGURE 1.1
Corner Wall Sheet
Wall Sheet
Wall Sheet
Sheet ‘Underlap’
Sheet ‘Overlap’ Sheet ‘Underlap’
Sheet ‘Overlap’
10x16 Hex-Head Screw
Wall Channel - Long
Corner Wall Sheet
Wall Channel - Long
Wall Sheet
Wall Sheet
Using Trestles or Blocks to support the sheets, lay the Corner Wall Sheet down first. Then lay down the two Wall Sheets. Pay
attention to the ‘overlap’ and ‘underlap’ lapping details (Figure 2.1).
FIGURE 2.0
FIGURE 2.1
WALL ASSEMBLY
Stratco Handi-Mate Windows
Refer to the “Window Installation” section at the end of this
document if installing a Stratco Window, or visit a Stratco
store for more information.
(Optional) Drainage holes can be drilled to help trapped water flow out of the bottom Wall Channels. After assembling the
Walls, drill 6mm holes spaced approximately 350mm apart through the bottom Wall Channels of each Wall. Ensure holes are
located in-between Sheet crests. Ensure metal filings are removed from the channels as to prevent rust spots from forming.
FIGURE 1.2
Wall Channel
Drain Hole
350mm
HANDI-MATE HM5 HINGED DOOR SHED INSTALLATION GUIDE
1. Fit the Wall Channel (Long) over the lapped Wall Sheets. The end of the Wall Channel should fit up against the end of the
Corner Wall Sheet (Figure 2.2).
2. Wall Channels have three pilot holes in each end. Fasten through the third pilot hole of both Wall Channel ends and into the
Wall Sheet crests. Fasten through the Wall Channels and into every third Wall Sheet crest using six 10x16 Hex-Head Screws in
each Wall Channel (Figure 2.2).
1. 2. 2.
10x16 Hex-Head Screw
Wall Channel - Long
Corner Wall Sheet
Wall Channel - Long
Wall Sheet
Wall Sheet
FIGURE 2.2
Repeat steps in Figures 2.0 to 2.2 to make two more Wall Assemblies, totalling three Wall Assemblies.
SECOND AND THIRD WALL ASSEMBLY
FRONT WALL ASSEMBLY
10x16 Hex-Head Screw
Wall Channel - Long
Wall Channel - Long
Door Jamb
Top
Door
Corner Wall Sheet
Split Wall Sheet
Corner Wall Sheet
Split Wall Sheet
Sheet ‘Underlap’
Sheet ‘Overlap’
Corner Wall Sheet
Door Jamb
Door
FIGURE 3.0
Lay out a Corner Wall Sheet and Split Wall Sheet onto trestles/blocks. Fit the Door over the Split Wall Sheet and then fit the Door
Jamb up against the Door. (Figure 3.1).
FIGURE 3.1
HANDI-MATE HM5 HINGED DOOR SHED INSTALLATION GUIDE
1. Fit both Wall Channels (Long) over the lapped Wall Sheets and Door Jambs. The end of the Wall Channels should fit up
against the end of the Corner Wall Sheet (Figure 3.2).
2. Fasten one 10x16 Hex-Head Screw through the third pilot hole of the bottom and top Wall Channels and into the Corner
Wall Sheet crest. Fasten two 10x16 Hex-Head Screws through the bottom and top Wall Channels and into the third Wall Sheet
crests (Figure 3.2).
3. Ensure the edge of the Wall Channels and Door Jamb are in-line. Fasten one 10x16 Hex-Head Screw through the third pilot
hole of the bottom and top Wall Channels and into the Door Jamb (Figure 3.2).
1. 2. 3.
Edge of Wall Channel
and Door Jamb in-line
Corner Wall Sheet
10x16 Hex-Head Screw
Wall Channel - Long
Wall Channel - Long
Door Jamb
Split Wall Sheet
FIGURE 3.2
Wall Channel - Long
Door Shroud
Door Jamb
Door Jamb
10mm
1.
Bottom View
10x16 Hex-Head Screw
With the Door open, fit the Door Shroud in-between the Door Jambs. Use the Door Shroud as a guide to set the correct
spacing between the Door Jambs (Figure 3.3).
1. Fasten two 10x16 Hex-Head Screws through both Wall Channels and into the Door Jamb. Close the Door and ensure an
approximate 10mm gap between the edge of the Door and end Door Jamb (Figure 3.3).
FIGURE 3.3
HANDI-MATE HM5 HINGED DOOR SHED INSTALLATION GUIDE
Corner Bracket
Wall Channel
1.
10x16 Hex-Head Screw
Corner Bracket
Wall Channel
2.
10x16 Hex-Head Screw
Corner Bracket
3.
Front Wall Assembly
Wall Assembly
JOINING WALL ASSEMBLIES
The wall assemblies can now be joined together. Fit the Corner Wall Sheet of the Front Wall over the Side Wall Sheet. Ensure
the Corner Sheet fits inside the Side Wall Channels (Figure 4.0).
1. Fit a Corner Bracket over the top Wall Channels. Ensure the pilot holes of the Corner Bracket and Wall Channels line up.
2. Fasten through the Corner Bracket pilot holes and into the top Wall Channels using four 10x16 Hex-Head Screws.
3. Fit a Corner Bracket to the bottom Wall Channels. Fasten through the Corner Bracket pilot holes and into the bottom Wall
Channels using four 10x16 Hex-Head Screws (Figure 4.0).
FIGURE 4.0
Door Shroud
Wall Channel - Long
10x16 Hex-Head Screw
Door Handle
10x16 Wafer-Head Screw
Handle Mount
Door Tongue
Locking Washer
Door Tongue Screw
Fit the Remaining Wall Assemblies together with Corner Brackets as per Figure 4.0.
Wall Assembly
Wall Assembly
Front Wall Assembly
Wall Assembly
FIGURE 4.1
Fasten the Door Handle to the Handle Mount with two 10x16
Wafer-Head Screws. Fit the Door Tongue over the Door
Handle shaft. Ensure the Door Tongue is oriented vertically
and the Handle is oriented horizontally.
Tighten the Door Tongue screw on the Door Handle shaft to
secure the Door Tongue in place.
Lastly, slide the Locking Washer onto the Door Handle shaft
and up against the Door Tongue (Figure 4.2).
Fit the Door Shroud into the Wall Channel (Long). Fasten the
Door Shroud to the Wall Channel with two 10x16 Hex-Head
Screws (Figure 4.3).
FIGURE 4.2 FIGURE 4.3
HANDI-MATE HM5 HINGED DOOR SHED INSTALLATION GUIDE
‘X’ - Anchor Locations
ROOF ASSEMBLY
Masonry Anchor
Corner Bracket
Using the Corner Bracket pilot holes as a guide, drill holes in
all four corners with a 10mm masonry drill bit. Secure all four
bottom Corner Brackets to the concrete base with M8x47
Masonry Anchors (Figure 4.5).
Fit a Hold Down Lug at the middle of all four Wall Channels.
Fasten one 10x16 Hex-Head Screw through all four Hold
Down Lugs into the Wall Channels and Wall Sheets. Fix all
four Hold Down Lugs to the concrete base with M8x47
Masonry Anchors (Figure 4.6).
Hold Down Lug
Masonry Anchor
10x16 Hex-Head
Screw
Bottom Channel
Hold Down Lug
Hold Down Lug
Hold Down Lug
Hold Down Lug
Check the walls are square. Check the diagonal
measurements from corner to corner. The diagonal
measurements should be equal for the walls to be square.
Note: Shed anchoring requirements are determined by
the wind zone the Handi-Mate is installed in. Contact a
Stratco store for further information or to determine your
wind zone.
The recommended anchor spacing in Figure 4.4 below,
where anchor points are no greater than 900mm apart,
will satisfy engineering requirements for N1, N2 and N3
wind zones.
FIGURE 4.5
FIGURE 4.4
FIGURE 4.6
Ridge Cap - Short
Ridge Beam
Roof Sheet
R/H Barge Cap
L/H Barge Cap
R/H Barge Cap
L/H Barge Cap
Ridge Cap - Long
FIGURE 5.0
Pan
Fit the Ridge Beam onto the top Wall Channels. Ensure 1005mm spacing between the edge of the shed and edge of the Ridge
Beam (Figure 5.1).
1. Align the end of the Ridge Beam with the outer edge of the Wall Channel. Fasten two 10x16 Hex-Head Screws through the
pilot holes in the Ridge Beam and into the Wall Channel (Figure 5.1).
2. Fasten two 10x16 Hex-Head Screws through the pilot holes in the Ridge Beam and into the rear Wall Channel (Figure 5.1).
Ridge Beam
Wall Channel
10x16 Hex-Head Screw
1005mm
2.
Ridge Beam
Wall Channel
10x16 Hex-Head Screw
1.
FIGURE 5.1
Use an adjustable spanner to turn up the pans at the ridge end of the Roof Sheets. This will prevent water flowing back under
the sheet (Figure 5.2).
FIGURE 5.2
Wall Channel
10x16 Hex-Head Screw
with Neo Washer
Roof Sheet
2.
Ridge Beam
1.
Ridge Beam
HANDI-MATE HM5 HINGED DOOR SHED INSTALLATION GUIDE
Lay a Roof Sheets onto the Ridge Beam and Wall Channel, ensuring the overlap end of the Roof Sheet is facing the front of the
shed (Figure 5.4).
1. Ensure the end of the Roof Sheet is in-line with the end of the Ridge Beam. Fasten five 10x16 Hex-Head Screws with Neo
Washers through the pans of the Roof Sheet and into the Ridge Beam (Figure 5.4).
2. Fasten five 10x16 Hex-Head Screws with Neo Washers through the pans of the Roof Sheet and into the Wall Channel
(Figure 5.4).
Install the opposing side Roof Sheets in the same manner.
FIGURE 5.4
Roof Sheet
Sheet ‘Underlap’
Sheet ‘Overlap’
Roof Sheet
Sheet ‘Overlap’ towards
the front of the Shed
Roof Sheet
FIGURE 5.3
Refer to the sheet layout below when installing Roof Sheets (Figure 5.3).
Ridge Cap - Long
10x16 Hex-Head Screw
with Neo Washer
Ridge Beam
FIGURE 5.5
Position the Ridge Cap (Long) over the Ridge Beam. The outside edge of the Ridge Cap (Long) should line up with the outer
face of the Barge Support (Figure 5.5).
Fasten the Ridge Cap (Long) to the Ridge Beam using three 10x16 Hex-Head Screws with Neo Washers (Figure 5.5).
Refer to Figure 5.3 for Sheet layout. Lay the next Roof Sheet onto the Ridge Beam and Wall Channel, ensuring the overlap end
of the Roof Sheet is facing the front of the shed (Figure 5.6).
1. Ensure the Roof Sheet is hard against the step of the Ridge Beam. Fasten five 10x16 Hex-Head Screws with Neo Washers
through the pans of the Roof Sheet and into the Ridge Beam (Figure 5.6).
2. Fasten five 10x16 Hex-Head Screws with Neo Washers through the pans of the Roof Sheet and into the Wall Channel
(Figure 5.6).
Install the opposing side Roof Sheets in the same manner.
Roof Sheet
10x16 Hex-Head Screw
with Neo Washer
Wall Channel
2.
1.
Ridge Beam
FIGURE 5.6
HANDI-MATE HM5 HINGED DOOR SHED INSTALLATION GUIDE
Position the Ridge Cap (Short) over the Ridge Beam. The end of the Ridge Cap (Short) should line up with the outer face of
the Wall Channel (Figure 5.7).
Fasten the Ridge Cap (Short) to the Ridge Beam using three 10x16 Hex-Head Screws with Neo Washers (Figure 5.7).
Ridge Beam
Ridge Cap Ridge Beam
10x16 Hex-Head Screw
with Neo Washer
Ridge Cap
FIGURE 5.7
HANDI-MATE HM5 HINGED DOOR SHED INSTALLATION GUIDE
R/H Barge Cap
L/H Barge Cap
R/H Barge Cap
L/H Barge Cap
220mm
1. 2.
Coloured 10x25 Hex-Head
Screw with Neo Washer
1. Place the L/H Barge Cap over the Roof Sheet at the front of the shed. The front face of the Barge Cap should fit up against
the Roof Sheets (Figure 5.8).
2. The ends of the Barge Cap Should align with the end of the Roof Sheet. Fasten two coloured 10x25 Hex-Head Screws with
Neo Washers through the front face of the Barge Cap and into the Wall Channel. Fasten two coloured 10x25 Hex-Head Screws
with Neo Washers through the top of the Barge Cap and into the crests of the Roof Sheets (Figure 5.8).
Install the R/H Barge Cap in the same manner on the front right side of the shed. Install the remaining L/H and R/H Barge Caps
to the rear of the shed in the same manner (Figure 5.8).
FIGURE 5.8
Coloured Rivet
A coloured Rivet should be installed at sheet laps in the Roof Sheets, Rear Wall, Wall Corners and Door Jambs. Drill a 3.5mm
hole through the centre of each sheet lap and install a coloured Rivet (Figure 5.9).
FIGURE 5.9
Silicone Bead
Wall Channel
Water-Proofing the Floor (Optional)
Water may enter the Shed between the bottom Wall Channels and Floor. Water ingress can be mitigated by applying silicone to
the gaps along the Floor. From the inside of the Shed, apply a bead of silicone along the entire perimeter of the Shed, including
along the Corner Brackets and Wall Channel ends. Do not apply silicone to the outside of the Shed as this will not allow water
to flow out and away from the Shed (Figure 5.10).
FIGURE 5.10
SHED MAINTENANCE
It is vital that all metal swarf and filings are removed from the shed as to prevent rust spots from forming. Your Stratco Handi-
MateTM Shed will maintain its good looks for even longer with a simple wash and wipe down. Cleaning should be performed as
often as is required to remove any dirt, salt and pollutants.
Stratco Handi-MateTM Sheds are produced from the highest quality materials and will provide many years of service. Refer to
the ‘Selection Use and Maintenance’ brochure for more information on how to get the best out of your product.
HANDI-MATE HM5 HINGED DOOR SHED INSTALLATION GUIDE
Rivet
Window Flashing
Trestles / Blocks
750mm
Lay a Wall Sheet on trestles or blocks. Mark and cut 750mm
from the end of the Wall Sheet (Figure 6.1).
Assemble the Wall Assembly as per the “Wall Assembly” section
of the install guide using below sheet layout (Figure 6.2).
Stratco Shed Windows are an optional add-on, available in
both Louvre and Sliding variations. Installation methods are
identical for each window type. Windows can be installed to
the rear or side walls of the shed.
The Window must be installed during the assembly of the
Wall.
WINDOW INSTALLATION
Stratco Louvre WindowStratco Sliding Window
FIGURE 6.0
FIGURE 6.1
FIGURE 6.2
Wall Channel
Wall Channel
Window
Coloured Rivet
The Window Flashing must be fitted from the inside of the
shed. Fit the short face of the Flashing between the window
and the cut edge of the Wall Sheet. Secure the flashing to
the Wall Sheet with four evenly spaced Rivets. Ensure all
rivets are crest-fixed through to the sheets (Figure 6.4).
Fit the window within the opening. Ensure the top lip of the
window is fitted between the Wall Channel and Wall Sheets.
A minimum of four evenly spaced rivets must be used along
each side of the window frame. All fasteners must be fixed
through the crests of the Wall Sheets (Figure 6.3).
FIGURE 6.3
FIGURE 6.4
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16
  • Page 17 17
  • Page 18 18
  • Page 19 19
  • Page 20 20
  • Page 21 21

Stratco HM5 Hinged Door Installation guide

Type
Installation guide

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI