on the top of the frame.
choose the correct length of chain needed.
4. Raise the frame up over the mounting
strap and do the wire connections. Secure
the canopy with the collar loop ring.
6. Dress the crystals as illustrated.
1. Screw the center stem kit onto the coupler
2. Decide the preferred hanging height and
3. Install the mounting strap onto the outlet
5. Install the bulb onto the socket.
box.
BLA-10668-MK
Crystorama.comCrystorama.com