Xtreme P91 5-10kVA Installation guide

Type
Installation guide

Xtreme P91 5-10kVA is a versatile power solution designed to provide reliable backup power and surge protection for various applications. With its advanced features and flexible configurations, it offers a comprehensive power protection strategy. The device comes with bypass and/or transformer options for customized power distribution and voltage regulation. Additionally, the XBDM series allows for rackmount or external battery pack mounting, providing flexible installation options.

Xtreme P91 5-10kVA is a versatile power solution designed to provide reliable backup power and surge protection for various applications. With its advanced features and flexible configurations, it offers a comprehensive power protection strategy. The device comes with bypass and/or transformer options for customized power distribution and voltage regulation. Additionally, the XBDM series allows for rackmount or external battery pack mounting, providing flexible installation options.

XBDM/XPD
with P91 5-10kVA
Installation Addendum
www.xpcc.com | © 2022 Xtreme Power Conversion Corporation. All rights reserved. (Rev 10/14/22)
Table of Contents
1. P91 5-10k with Bypass
1.1. P91 with XBDM-P91A…………………………………………………………………………..3
1.2. P91 with XBDM-P91B…………………………………………………………………………..4
1.3. P91 with XBDM-P91C…………………………………………………………………………..5
1.4. P91 with XBDM-P91D…………………………………………………………………………..6
2. P91 5-10k with Output Transformer
2.1. P91 with XPD-IT6kW…………………………………………………………………………….7
2.2. P91 with XPD-IT10kW…………………………………………………………………………..8
3. P91 with Bypass and Transformer
3.1. P91 with XBDM-P91A and XPD-IT60A…………………………………………………..9
3.2. P91 with XBDM-P91B and XPD-IT60A…………………………………………………10
3.3. P91 with XBDM-P91C and XPD-IT60A…………………………………………………11
3.4. P91 with XBDM-P91D and XPD-IT60A…………………………………………………12
3.5. P91 with XBDM-P91B and XPD-IT6kW………………………………………………..13
3.6. P91 with XBDM-P91C and XPD-IT6kW………………………………………………..14
3.7. P91 with XBDM-P91B with XPD-IT10kW……………………………………………..15
3.8. P91 with XBDM-P91C with XPD-IT10kW……………………………………………..16
PROJECT
TITLE
DRAWN
CHECKED
APPROVED
SCALE WEIGHT SHEET
DWG NO REVCODESIZE
P91 with Accessories
P91 with XBDM-P91A
1/1
1:4
9/30/2022
IC-P91-P91A
A0
UPS
Output
Connection
UPS
Input
Connection
Utility
Input
Connection
(L6-30P)
MBS
Detection
(RJ45)
Notes:
1) Input and output wiring between UPS
and Bypass are supplied with
bypass.
2) Red connector is for UPS input,
black for UPS output. Note that for
the black set of wiring that the red
wire is L1 and black wire is L2(N).
For red set the brown wire is L1 and
blue wire is L2(N).
3) XBDM comes with brackets for
installation to rack or to mount it to
back of an external battery pack.
4) Load connections can be made from
the bypass .
P91
XBDM-P91A
PROJECT
TITLE
DRAWN
CHECKED
APPROVED
SCALE WEIGHT SHEET
DWG NO REVCODESIZE
P91 with Accessories
P91 with XBDM-P91B
1/1
1:4
9/30/2022
IC-P91-XBDMP91B
A0
UPS
Output
Connection
UPS
Input
Connection
Utility
Input
Connection
(Hardwired)
MBS
Detection
(RJ45)
Notes:
1) Input and output wiring between UPS
and Bypass are supplied with
bypass.
2) Red connector is for UPS input,
black for UPS output. Note that for
the black set of wiring that the red
wire is L1 and black wire is L2(N).
For red set the brown wire is L1 and
blue wire is L2(N).
3) XBDM comes with brackets for
installation to rack or to mount it to
back of an external battery pack.
4) Load connections can be made from
the bypass .
P91
XBDM-P91B
PROJECT
TITLE
DRAWN
CHECKED
APPROVED
SCALE WEIGHT SHEET
DWG NO REVCODESIZE
P91 with Accessories
P91 with XBDM-P91C
1/1
1:4
9/30/2022
IC-P91-XBDMP91C
A0
UPS
Output
Connection
UPS
Input
Connection
Utility
Input
Connection
(Hardwired)
MBS
Detection
(RJ45)
Notes:
1) Input and output wiring between UPS
and Bypass are supplied with
bypass.
2) Red connector is for UPS input,
black for UPS output. Note that for
the black set of wiring that the red
wire is L1 and black wire is L2(N).
For red set the brown wire is L1 and
blue wire is L2(N).
3) XBDM comes with brackets for
installation to rack or to mount it to
back of an external battery pack.
4) Load connections can be made from
the bypass .
P91
XBDM-P91C
PROJECT
TITLE
DRAWN
CHECKED
APPROVED
SCALE WEIGHT SHEET
DWG NO REVCODESIZE
P91 with Accessories
P91 with XBDM-P91D
1/1
1:4
9/30/2022
IC-P91-XBDMP91D
A0
UPS
Output
Connection
UPS
Input
Connection
Utility
Input
Connection
(Hardwired)
MBS
Detection
(RJ45)
Notes:
1) Input and output wiring between UPS
and Bypass are supplied with
bypass.
2) Red connector is for UPS input,
black for UPS output. Note that for
the black set of wiring that the red
wire is L1 and black wire is L2(N).
For red set the brown wire is L1 and
blue wire is L2(N).
3) XBDM comes with brackets for
installation to rack or to mount it to
back of an external battery pack.
4) Load connections can be made from
the bypass .
P91
XBDM-P91D
PROJECT
TITLE
DRAWN
CHECKED
APPROVED
SCALE WEIGHT SHEET
DWG NO REVCODESIZE
P91 with Accessories
P91 with XPD-IT6kW
1/1
1:4
9/30/2022
IC-P91-IT6kW
A0
Utility Input
Connection
(Hardwired)
Notes:
1) If external batteries are being used, it
is recommended that they be
installed below the transformer
cabinet.
2) Load connections are made from the
transformer.
3) Voltage selector jumper on back of
transformer should match the voltage
from utility, 208VAC or 240VAC.
UPS should be set for the same
voltage.
P91
XPD-IT6kW
Transformer
Input
Connection
from UPS
Output
(Hardwired)
PROJECT
TITLE
DRAWN
CHECKED
APPROVED
SCALE WEIGHT SHEET
DWG NO REVCODESIZE
P91 with Accessories
P91 with XPD-IT10kW
1/1
1:4
9/30/2022
IC-P91-IT10kW
A0
Utility Input
Connection
(Hardwired)
Notes:
1) If external batteries are being used, it
is recommended that they be
installed below the transformer
cabinet.
2) Load connections are made from the
transformer.
3) Voltage selector jumper on back of
transformer should match the voltage
from utility, 208VAC or 240VAC.
UPS should be set for the same
voltage.
P91
XPD-IT10kW
Transformer
Input
Connection
from Bypass
Output
(Hardwired)
PROJECT
TITLE
DRAWN
CHECKED
APPROVED
SCALE WEIGHT SHEET
DWG NO REVCODESIZE
P91 with Accessories
P91 with XBDM-P91A and XPD-IT60A
1/1
1:4
9/30/2022
IC-P91-P91A-IT60A
A0
UPS
Output
Connection
UPS
Input
Connection
L6-30R to
Transformer's
Input
L6-30P Transformer Input
from either of
Bypass's Output
L6-30R pigtails
Utility
Input
Connection
(L6-30P)
MBS
Detection
(RJ45)
Notes:
1) Input and output wiring between UPS
and Bypass are supplied with
bypass.
2) Red connector is for UPS input,
black for UPS output. Note that for
the black set of wiring that the red
wire is L1 and black wire is L2(N).
For red set the brown wire is L1 and
blue wire is L2(N).
3) Voltage selector switch on back of
transformer should match the voltage
from utility, 208VAC or 240VAC.
UPS should be set for the same
voltage.
4) XBDM comes with brackets for
installation to rack or to mount it to
back of an external battery pack.
5) If external batteries are being used, it
is recommended that they be
installed below the transformer
cabinet.
6) Load connections can be made from
either the bypass or transformer,
depending on voltages needed.
P91
XBDM-P91A
XPD-IT60A
PROJECT
TITLE
DRAWN
CHECKED
APPROVED
SCALE WEIGHT SHEET
DWG NO REVCODESIZE
P91 with Accessories
P91 with XBDM-P91B and XPD-IT60A
1/1
1:4
9/30/2022
IC-P91-XBDMP91B-IT60A
A0
UPS
Output
Connection
UPS
Input
Connection
L6-30R to
Transformer's
Input
L6-30P
Utility
Input
Connection
(Hardwired)
MBS
Detection
(RJ45)
Notes:
1) Input and output wiring between UPS
and Bypass are supplied with
bypass.
2) Red connector is for UPS input,
black for UPS output. Note that for
the black set of wiring that the red
wire is L1 and black wire is L2(N).
For red set the brown wire is L1 and
blue wire is L2(N).
3) Voltage selector switch on back of
transformer should match the voltage
from utility, 208VAC or 240VAC.
UPS should be set for the same
voltage.
4) XBDM comes with brackets for
installation to rack or to mount it to
back of an external battery pack.
5) If external batteries are being used, it
is recommended that they be
installed below the transformer
cabinet.
6) Load connections can be made from
either the bypass or transformer,
depending on voltages needed.
P91
XBDM-P91B
XPD-IT60A
PROJECT
TITLE
DRAWN
CHECKED
APPROVED
SCALE WEIGHT SHEET
DWG NO REVCODESIZE
P91 with Accessories
P91 with XBDM-P91C and XPD-IT60A
1/1
1:4
9/30/2022
IC-P91-XBDMP91C-IT60A
A0
UPS
Output
Connection
UPS
Input
Connection
L6-30R to
Transformer's
Input
L6-30P
Utility
Input
Connection
(Hardwired)
MBS
Detection
(RJ45)
Notes:
1) Input and output wiring between UPS
and Bypass are supplied with
bypass.
2) Red connector is for UPS input,
black for UPS output. Note that for
the black set of wiring that the red
wire is L1 and black wire is L2(N).
For red set the brown wire is L1 and
blue wire is L2(N).
3) Voltage selector switch on back of
transformer should match the voltage
from utility, 208VAC or 240VAC.
UPS should be set for the same
voltage.
4) XBDM comes with brackets for
installation to rack or to mount it to
back of an external battery pack.
5) If external batteries are being used, it
is recommended that they be
installed below the transformer
cabinet.
6) Load connections can be made from
either the bypass or transformer,
depending on voltages needed.
P91
XBDM-P91C
XPD-IT60A
PROJECT
TITLE
DRAWN
CHECKED
APPROVED
SCALE WEIGHT SHEET
DWG NO REVCODESIZE
P91 with Accessories
P91 with XBDM-P91D and XPD-IT60A
1/11:4
9/30/2022
IC-P91-XBDMP91D-IT60A
A0
UPS
Output
Connection
UPS
Input
Connection
L6-30R to
Transformer's
Input
L6-30P
Utility
Input
Connection
(Hardwired)
MBS
Detection
(RJ45)
Notes:
1) Input and output wiring between UPS
and Bypass are supplied with
bypass.
2) Red connector is for UPS input,
black for UPS output. Note that for
the black set of wiring that the red
wire is L1 and black wire is L2(N).
For red set the brown wire is L1 and
blue wire is L2(N).
3) Voltage selector switch on back of
transformer should match the voltage
from utility, 208VAC or 240VAC.
UPS should be set for the same
voltage.
4) XBDM comes with brackets for
installation to rack or to mount it to
back of an external battery pack.
5) If external batteries are being used, it
is recommended that they be
installed below the transformer
cabinet.
6) Load connections can be made from
either the bypass or transformer,
depending on voltages needed.
P91
XBDM-P91D
XPD-IT60A
PROJECT
TITLE
DRAWN
CHECKED
APPROVED
SCALE WEIGHT SHEET
DWG NO REVCODESIZE
P91 with Accessories
P91 with XBDM-P91B and XPD-IT6kW
1/11:4
9/30/2022
IC-P91-XBDMP91B-IT6kW
A0
UPS
Output
Connection
UPS
Input
Connection Utility
Input
Connection
(Hardwired)
MBS
Detection
(RJ45)
Notes:
1) Input and output wiring between UPS
and Bypass are supplied with
bypass.
2) Red connector is for UPS input,
black for UPS output. Note that for
the black set of wiring that the red
wire is L1 and black wire is L2(N).
For red set the brown wire is L1 and
blue wire is L2(N).
3) XBDM comes with brackets for
installation to rack or to mount it to
back of an external battery pack.
4) If external batteries are being used, it
is recommended that they be
installed below the transformer
cabinet.
5) Load connections can be made from
either the bypass or transformer,
depending on voltages needed.
Transformer has both receptacle and
hardwire options.
6) Voltage selector jumper on back of
transformer should match the voltage
from utility, 208VAC or 240VAC.
UPS should be set for the same
voltage.
P91
XBDM-P91B
XPD-IT6kW
Transformer
Input
Connection
from
Bypass
Output
(Hardwired)
PROJECT
TITLE
DRAWN
CHECKED
APPROVED
SCALE WEIGHT SHEET
DWG NO REVCODESIZE
P91 with Accessories
P91 with XBDM-P91C and XPD-IT6kW
1/1
1:4
9/30/2022
IC-P91-XBDMP91C-IT6kW
A0
UPS
Output
Connection
UPS
Input
Connection Utility
Input
Connection
(Hardwired)
MBS
Detection
(RJ45)
Notes:
1) Input and output wiring between UPS
and Bypass are supplied with
bypass.
2) Red connector is for UPS input,
black for UPS output. Note that for
the black set of wiring that the red
wire is L1 and black wire is L2(N).
For red set the brown wire is L1 and
blue wire is L2(N).
3) XBDM comes with brackets for
installation to rack or to mount it to
back of an external battery pack.
4) If external batteries are being used, it
is recommended that they be
installed below the transformer
cabinet.
5) Load connections can be made from
either the bypass or transformer,
depending on voltages needed.
Transformer has both receptacle and
hardwire options.
6) Voltage selector jumper on back of
transformer should match the voltage
from utility, 208VAC or 240VAC.
UPS should be set for the same
voltage.
P91
XBDM-P91C
XPD-IT6kW
Transformer
Input
Connection
from
Bypass
Output
(Hardwired)
PROJECT
TITLE
DRAWN
CHECKED
APPROVED
SCALE WEIGHT SHEET
DWG NO REVCODESIZE
P91 with Accessories
P91 with XBDM-P91B and XPD-IT10kW
1/11:4
9/30/2022
IC-P91-XBDMP91B-IT10kW
A0
UPS
Output
Connection
UPS
Input
Connection Utility
Input
Connection
(Hardwired)
MBS
Detection
(RJ45)
Notes:
1) Input and output wiring between UPS
and Bypass are supplied with
bypass.
2) Red connector is for UPS input,
black for UPS output. Note that for
the black set of wiring that the red
wire is L1 and black wire is L2(N).
For red set the brown wire is L1 and
blue wire is L2(N).
3) XBDM comes with brackets for
installation to rack or to mount it to
back of an external battery pack.
4) If external batteries are being used, it
is recommended that they be
installed below the transformer
cabinet.
5) Load connections can be made from
either the bypass or transformer,
depending on voltages needed.
Transformer has both receptacle and
hardwire options.
6) Voltage selector jumper on back of
transformer should match the voltage
from utility, 208VAC or 240VAC.
UPS should be set for the same
voltage.
P91
XBDM-P91B
XPD-IT10kW
Transformer
Input
Connection
from
Bypass
Output
(Hardwired)
PROJECT
TITLE
DRAWN
CHECKED
APPROVED
SCALE WEIGHT SHEET
DWG NO REVCODESIZE
P91 with Accessories
P91 with XBDM-P91C and XPD-IT10kW
1/1
1:4
9/30/2022
IC-P91-XBDMP91C-IT10kW
A0
UPS
Output
Connection
UPS
Input
Connection Utility
Input
Connection
(Hardwired)
MBS
Detection
(RJ45)
Notes:
1) Input and output wiring between UPS
and Bypass are supplied with
bypass.
2) Red connector is for UPS input,
black for UPS output. Note that for
the black set of wiring that the red
wire is L1 and black wire is L2(N).
For red set the brown wire is L1 and
blue wire is L2(N).
3) XBDM comes with brackets for
installation to rack or to mount it to
back of an external battery pack.
4) If external batteries are being used, it
is recommended that they be
installed below the transformer
cabinet.
5) Load connections can be made from
either the bypass or transformer,
depending on voltages needed.
Transformer has both receptacle and
hardwire options.
6) Voltage selector jumper on back of
transformer should match the voltage
from utility, 208VAC or 240VAC.
UPS should be set for the same
voltage.
P91
XBDM-P91C
XPD-IT10kW
Transformer
Input
Connection
from
Bypass
Output
(Hardwired)
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16

Xtreme P91 5-10kVA Installation guide

Type
Installation guide

Xtreme P91 5-10kVA is a versatile power solution designed to provide reliable backup power and surge protection for various applications. With its advanced features and flexible configurations, it offers a comprehensive power protection strategy. The device comes with bypass and/or transformer options for customized power distribution and voltage regulation. Additionally, the XBDM series allows for rackmount or external battery pack mounting, providing flexible installation options.

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI