Allure Aluminum AL12BGSN Installation guide

Type
Installation guide
ALLURE ALUMINUM GARDEN FENCE
ASSEMBLY INSTRUCTIONS
Parts Included In Package:
Pickets 6 Short Pickets & 2 Tall Pickets
Rails 2
Screws 20
Screw cover caps 4
Corner connectors 2
Tools Required:
Phillips Screw Driver
Scissors
Optional-
Power drill with Phillips head bit
o Caution- Adjust the torque setting on the power drill to release at point when
the screw head is flush with rail. Too much torque might snap the screw head.
Also please wear safety glasses while using power drills.
Fence Section Assembly:
Step 1: Take out all the components from box, and line up the pre-drilled
holes in the pickets with those of the rails as seen in the Figure A above. Please
make sure the tall pickets are at the end.
Step 2: Using the screws in the package, fasten the pickets to the rails as
shown above using a Phillips screw driver or a power drill.
Step 3: If you have more than one section, assemble all sections similarly
(repeating steps 1 & 2) before attempting to connect the sections together.
Figure A
Fence Installation:
For Corner Sections Assembly:
Using the corner connector, align the two
fence sections perpendicular to each other,
and fasten the connectors onto the rails
using a screw driver or a power drill as
seen in Figure B.
Repeat for all corner section connections.
For Line Sections Assembly:
A continuous run can be achieved by
connecting sections to each other by
alternatively overlapping and fastening the
rails to each other, as shown in the Figures
C&D to the right.
Installation:
After all the sections are assembled
and connected to each other, apply gentle
pressure on the overlapping rails and
corners to push the sections into the
ground. If sections aren’t placed in the
right location, gently pull out the sections
and try again. A shortened custom-length
garden fence section can be made by
cutting off the excess rail lengths using a
hacksaw. Make sure a tall picket is placed
at the end of the rails.
NOTE:
The clearance between the short pickets and the ground is at the discretion of the installer. Also, after all the
sections have been assembled and installed into the ground, use the screw cover caps to cover up all exposed
screw tips on corner and line connections. Snip off any excess material from the caps using scissors.
CAUTION:
Although using a power drill may reduce assembly time, a high torque setting may snap or strip the screw
head. Use caution while assembling sections using power drills.
Figure B
Figure C
Figure D
  • Page 1 1
  • Page 2 2

Allure Aluminum AL12BGSN Installation guide

Type
Installation guide

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI