60
M5x50mm
M5x60mm
M5x15mm
M6x20mm
A
M4x6mm
8gx25mm
(T1) X 2
100
10211 ZINS-Z912-43
15
• Screw body in place using screws as shown.
• Assemble arm to pinion as shown.
• Secure arm and rail foot with screw provided.
22.5
(M4) X 1
(T2) X 4
(B1) X 1
48
4 body mounting holes and 2 track holes as indicated on this sheet.
If Hold Open is not required do not tighten HO screw.
Slip rail foot into track and insert end caps.
Push track and arm towards frame and secure in position.
EN1 750mm 20kg 9Nm
13Nm
18Nm
8
7
175
175
175
Timber drill 3
Metal drill 4.2 and tap M5
(B1) x 1
(M1) x 2
M6x20mm
(C1) x 1
M5x50mm
(M2) x 4
M5x50mm
(T1) x 2
10gx50mm
(T2) x 4
10gx50mm
(Full Cover
only)
(A1) X 2
M6x10mm
Instructions 724_SLIDE ARM PULL SIDE NOVE 2013