AIR GAP AG110-001 Installation Procedures

  • Hello! I am an AI chatbot trained to assist you with the AIR GAP AG110-001 Installation Procedures. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
REVERSE OSMOSIS
AIR GAP
Model:
Old Part Number:
500 Jefferson Street, Placentia, California 92870 USA • 949-955-3928 • Email: [email protected]
Copyright AIR GAP INTERNATIONAL
Placentia, California
AG110-001
GAP-A-RO, KIT S-A
Doc.#400-0653-003
5. Connect 3/8" OD poly tubing from
your RO unit to AG110-001 inlet
port and 3/8" OD poly tubing from the
AG110-001 outlet port to the drain
pipe. Use provided clamps and
screws to secure tubing. (See FIG
1-5)
3/8” O.D.
Poly tubing
Also fits
5/8” I.D. Poly tubing
The 5/8 inch ID tubing fits
AG110-001 and can be used if
desired. The AG110-001 design
enables the larger tube to be
used for inlet or outlet, or to be
as part of a double-sealed
system, or to provide added
mechanical protection to the
inside tubing. (See FIG 1-6)
5/8” I.D. Poly
tubing
4. The AG110-001 must be installed with the "C/L" line
above the sink's rim, sump, floor drain, floor grate, or
standpipe where the discharge tubing is terminated. The
AG110-001must be installed vertically. Secure
AG110-001 with provided mounting screws (See Fig 1-4).
"C/L"
0.857"-0.900"
Critical Level (C/L) marking
Mounting Screws
Fig 1-4
3/8” O.D.
Poly tubing
Clamp
Fig 1-5
Fig 1-6
Installation Procedures
LIST OF PARTS ENCLOSED
Please read the instructions once through before starting.
AG110-001 INSTALLATION INSTRUCTION
-OVER-
AG110-001
1- Inline Reverse Osmosis Air Gap Drain
1- Mounting Bracket
4- 3/8 Nylon Clamps
6- #6-1", Phillips Screws
AG110-001 Reverse Osmosis Filter Air Gap prevents back-flow from drain line into RO
system. The discharge water flows out of the reverse osmosis system into inlet, passes air-gap,
and then down to the drain piping.
•Secure connection of inlet and outlet ports using 3/8-inch poly-tubing.
•Tested at over 0.3 GPM (1.1 Liters/minute)
•The optimum suggested usage 1 to 16 oz/minute (30 to 500 milliliters/minute)
•UPC® listed, tested for compliance to IPC and NSF standards
Always comply with local plumbing codes during installation
1. Make sure that the flow rate output of the RO equipment meets AG110-001 flow capacity limits such as
0.3 GPM (1.1 Liters/minute).
-OVER-
2. Check inlet and outlet ports marking on AG110-001 body and install AG110-001 into the threaded opening of the
mounting bracket as shown on FIG 1-1 (mounting options 1 and 2), for dimensions see FIG 1-2.
Inlet Port
Outlet Port
Mounting Bracket
Inline Reverse Osmosis
air gap
0.680" dia.
Fig 1-1
Inlet Marking
Outlet Marking
1"
Fig 1-2
4 1/2"
2.85"
0.640" dia.
3. AG110-001 is a gravity flow device and must have an
outlet poly tubing feeding directly to a drain without kinks
or bends. The AG110-001 must be permanently
connected to enable the discharge water to flow freely
through the outlet tubing. (See FIG 1-3)
Inlet Port
Mounting Bracket
Outlet Port
Outlet Marking
Inline Reverse Osmosis
air gap
Inlet Marking
Mounting option 2
Mounting option 1
Water supply
Water CoolerRO System
Discharge
Drain Pipe
RO Tank
Fig 1-3
AG110-001
/