B6VMAI

Westinghouse B6VMAI Installation guide

  • Hello! I am an AI chatbot trained to assist you with the Westinghouse B6VMAI Installation guide. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
INSTALLATION IN STANDARD & VARIABLE SPEED INDOOR AIR HANDLERS
H8HK SERIES ELECTRIC HEATER KIT
IMPORTANT
ATTENTION INSTALLERS:
These instructions are primarily intended to assist qualified individuals experienced in the proper
installation of heating and/or air conditioning appliances. Some local codes require licensed
installation/service personnel for this type equipment. All installations must be in accordance
with these instructions and with all applicable national and local codes and standards.
Read these instructions thoroughly before starting the installation. Follow all precautions and
warnings contained within these instructions and on the unit. The instructions included with
this keater kit are for installations in air handlers only.
DO NOT DESTROY. PLEASE READ CAREFULLY & KEEP IN A SAFE PLACE FOR FUTURE REFERENCE.
INSTALLATION INSTRUCTIONS
2
IMPORTANT SAFETY INFORMATION
INSTALLER: Please read all instructions before servicing
this equipment. Pay attention to all safety warnings and
any other special notes highlighted in the manual. Safety
markings are used frequently throughout this manual to
designate a degree or level of seriousness and should not
be ignored. WARNING indicates a potentially hazardous
situation that if not avoided, could result in personal injury or
death. CAUTION indicates a potentially hazardous situation
that if not avoided, may result in minor or moderate injury
or property damage.
WARNING:
ELECTRICAL SHOCK, FIRE OR
EXPLOSION HAZARD
Failure to follow safety warnings exactly could
result in serious injury or property damage.
Improper servicing could result in dangerous
operation, serious injury, death or property
damage.
• Before servicing, disconnect all electrical
power to the unit.
• Whenservicingcontrols,labelallwiresprior
to disconnecting. Reconnect wires correctly.
• Verifyproperoperationafterservicing.
GENERAL INFORMATION
About the heater kit
H8HK Series electric heater kit is approved for field installation
in B5, B6, MB7, HMG, HMB, & HCG, air handlers. All sizes
are available with factory-provided circuit-breakers for short
circuit protection and to provide a disconnecting means. Also
available are 5, 8, and 10 kw electric heater kits without circuit-
breakers. Refer to the National Electric Code (ANSI/NFPA
70) and applicable local codes for over-current protection
and disconnect requirements.
NOTES:
• The20,24,and29kwelectricheaterkitsareNOT approved
forinstallationinA-cabinetairhandlers.The24&29Kw
kits are for B6, MB7, HMG, HMB, & HCG C-cabinet air
handlers. For all heater kit applications, use Table 1, Table
2, Table 3 (page 6), and Figure 1 (page 5).
• Theseinstructionsarewrittenassumingtheairhandleris
in the upflow position (outlet facing up). For horizontal and
downflow applications, it is recommended that the electric
heater kit be installed prior to installation of the air handler.
• Usecautionwhenhandlingorinstallingthiscomponent.
Personal injury can occur from sharp metal edges present
in all sheet metal constructed equipment.
• 460Vheaterkitsareonlyapprovedforuseinthe460V
MB7 (C-cabinet) air handler.
TABLE OF CONTENTS
IMPORTANT SAFETY INFORMATION .................... 2
GENERAL INFORMATION ....................................... 2
About the heater kit............................................... 2
Clearances to Combustibles ................................. 3
Standard Air Handlers ........................................ 3
VariableSpeedAirHandlers ........................... 3
ELECTRICAL SUPPLY ............................................. 3
Power Wiring......................................................... 3
ELEMENT INSTALLATION ....................................... 3
Electric Heater Kits with Circuit Breakers ............. 3
5, 8, & 10 kw Electric Heater Kits ....................... 4
15,20,24,&29kwElectricHeaterKits ............. 4
3-Phase9&15kwelectricheaterkits ............... 4
Line Cover .......................................................... 4
Electric Heater Kits without Circuit Breakers ........ 4
Staged Heat .......................................................... 4
MOTOR SPEED SELECTION ................................... 4
Standard Air Handlers .......................................... 4
Standard 3 Speed Motors ................................... 4
Standard C-Cabinets .......................................... 4
VariableSpeedAirHandlers ................................ 4
FIGURES & TABLES ................................................ 5
Figure 1. Heater Kit Identification Code .............. 5
Figure 2. Sample Installation .............................. 5
Figure 3. Installation of Circuit Breakers ............. 5
Figure 5. Line Cover Installed ............................. 5
Figure4.LineCover ........................................... 5
Figure 6. Circuit Breaker Bracket with
Terminal Block Installed ....................... 5
Table 1. Blower Heating Speed ........................... 6
Table 2. HMG Cabinet Sizes ............................... 6
Table 3. Electrical Ratings ................................... 6
Figure 7. H8HK Heater Kit Installation ................ 6
Wiring Diagrams ................................................... 7
Figure 8. Single Phase, 3kW & 5 kw W.D............ 7
Figure9.SinglePhase,8kw&10kwW.D. ......... 8
Figure 10. Single Phase, 15 kw W.D. .................. 9
Figure 11. Single Phase, 20 kw WD ................... 10
Figure 12. Single Phase, 25 kw WD ................... 11
Figure 13. Single Phase, 30 kw W.D. ................. 12
Figure14.3-Phase,9kw&15kwW.D. ................ 13
Figure15.3-Phase,460VW.D. ........................... 14
3
Clearances to Combustibles
Standard Air Handlers
All installations of H8HK electric heater kits in standard air
handlers are approved for zero-clearance to combustibles
when the minimum electric heat airlfow is set as directed in
these instructions.
VariableSpeedAirHandlers
All installations of H8HK electric heater kits in variable speed
air handlers are approved for zero-clearance to combustibles
when the minimum electric heat airflow is set as directed in
these instructions.
ELECTRICAL SUPPLY
• Allelectricalconnectionsmustbeincompliancewithall
applicable local codes with the current revision of the
National Electric Code (ANSI/NFPA 70). For Canadian
installations the electrical connections and grounding shall
comply with the current Canadian Electrical Code (CSA
C22.1 and/or local codes).
• Iftheairhandlerwaspreviouslyinstalledwithoutelectric
heat, the existing supply wiring may not be sufficient to
carry the increased load. If installing electric heat in the
air handler, the supply wiring can be aluminum or copper.
The supplied circuit breakers and terminal blocks are
approved for either wire type. Make sure to follow all of
the rating information on the circuit breaker or terminal
block and that the supply wiring is sized according to the
current NEC codes and any other state or local codes.
See the rating label or Table 3 (page 6) for minimum
circuit ampacities and maximum overcurrent protection.
• Allheaterkitsaresuppliedfromthefactoryconguredfor
use with one or more supply circuits. 5 & 10 kw heater
kits 10 are configured for use with a single supply circuit
(Circuit A). 15 & 20 kW heater kits are configured for use
with2circuits(CircuitA&CircuitB).24&29kWheater
kits are configured for use with 3 circuits (Circuit A, Circuit
B, & Circuit C). See Table 3 for additional information.
NOTE:Ifasinglesupplyisdesired,accessorykit#913874
is required to convert to single circuit connection.
Power Wiring
All wiring must comply with the current revision of the National
Electric Code and must be sized for the minimum ampacities
as listed on the unit data label or in Table 3. Refer to Figure
8 (page 7), Figure 9 (page 8), Figure 10 (page 9),
Figure 11 (page 10), Figure 12 (page 11), Figure 13
(page 12), & Figure14(page13) for proper connections.
If a single circuit adaptor kit is used it may need to be re-
configured for some applications. Remove the single circuit
adaptor kit cover and verify that the lugs are configured
correctly for the application. If the lugs are not configured
for the application, reference the instructions included with
the kit and modify the configuration. Install the single circuit
adaptor kit (if used) in the line side (“on” end) of the circuit
breakers.Tightenthelugssecurely(45in-lbsrecommended).
Connect the supply wiring to the circuit breaker(s), single
circuit adaptor kit, or terminal block. Tighten the lugs securely.
When using multiple supply circuits verify that the supply
sized for circuit “A” is connected to the circuit breaker that
is connected to the top element assembly.
Install metal circuit breaker line cover on the left side of the
circuit breaker to cover the supply wires.
ELEMENT INSTALLATION
1. Set the thermostat to the lowest temperature setting.
2. Turn off all electrical power to the air handler.
3. Remove the upper access door from the air handler.
4.Removethescrewssecuringtheupperelementclose-off
plate from the back of the air handler control box.
5. Remove the element close-off plate and set the screws
aside. Do not discard the screws. NOTE: For 2-tiered
electric heater kits, remove two close-off plates. For
3-tiered electric heater kits remove all 3 close-off plates.
The close off plates should be removed from the bottom
up in ascending order.
6. Insert the element assembly into the opening in the
air handler control box being careful not to damage
the element wire or the ceramic element supports.
NOTE: Heating element alignment rods will slide into
alignment holes in the back of the air handler element box.
7. Secure the element assembly to the back of the air handler
controlboxwiththescrewsremovedinstep4.
•For15,20,24,or29kwHeaterKitstheACrelaybracket
also needs to be installed.
a.) Place the AC relay bracket below the bottom element
plate so the back edge is behind the element plate.
b.) Line up the slot hole on the bracket with the half hole
on the element plate. See Figure 7 (page 6).
8. Single Stage Board: Connect the W wires from the control
board (white), AC relay (white) and the W wire from the
thermostat with one of the supplied wire nuts. Connect
the C wires from the board (grey), AC relay (grey) and C
wire (if supplied) from the thermostat with one wire nut.
Two-Stage Board: Place the W1 wire from the thermostat
and the white wire from the AC relay under the W1 screw
terminal on the board. Place the C wire from the thermostat
(if present) and the grey wire from the AC relay underneath
the C terminal on the control board.
9.Connectthe2-PinPowerplugfromtheelementassembly
into the unit's 2-Pin power plug. Connect the 7-Pin Harness
from the element assembly to the unit's circuit board.
NOTE: A wiring diagram and a rating label are supplied
with the electric heater kit. Affix the wiring diagram to the
blower housing.
• Wheninstallingtheelectricheaterkitintoastandardair
handler, affix the supplied rating label over the electrical
data section of the air handler unit data label located on
the lower access door.
• Wheninstallingtheelectricheaterkitintoavariablespeed
air handler, the rating label supplied with the kit will NOT
be used. Check the appropriate block on the air handler
ratings label located on the lower access door.
8. Install the circuit breaker bracket inside of the air handler.
Position the tab on the bottom of the bracket into the slot
of the control panel box. See Figure 2 (page 5) for
proper location of bracket.
9.Slidethebracketforwardandalignthescrewholeswith
the holes in the bottom of the control panel box. Secure
the bracket to the air handler with the supplied screws.
Electric Heater Kits with Circuit Breakers
NOTE 1: Circuit breakers supplied with the H8HK electric
heater kit are for short-circuit protection of the internal wiring
and to serve as a unit disconnect. They DO NOT provide
over-current protection of the supply wiring. Over-current
protection of the supply wiring must be provided at the
4
distribution panel and sized as shown in Table 3 (page 6)
or the unit data label, and in accordance with the NEC and
all applicable local codes.
NOTE 2: In some cases, the over-current protection specified
in Table 3 (or the unit data label) is less than the 60 amp rating
of the circuit breakers used in the H8HK electric heater kit.
This difference may occur if the function of the over-current
protection required at the distribution panel (field supplied)
and the function of the circuit breakers in the H8HK electric
heater kit are different.
5, 8, & 10 kw Electric Heater Kits
1. Snap the circuit breaker onto the circuit breaker bracket.
Thecircuitbreakermustbepositionedwiththe1/4"tab
terminals to the right as shown in Figure 3 (page 5).
2. Remove the lower circuit breaker knockout from the air
handler upper access door.
15,20,24,&29kwElectricHeaterKits
NOTE 1: The heavy red and black supply leads are bundled
by circuit with wire ties at the factory. The bundle coming
from the top element tier is circuit “A”.
NOTE 2: The element assembly is right-side-up when the
limits are on the right side). The bundle coming from the
second element tier is circuit “B”. The bundle coming from
thebottomelementtieriscircuit"C".
1. Snap the circuit breaker onto the circuit breaker bracket.
Thecircuitbreakermustbepositionedwiththe1/4"tab
terminals to the right as shown in Figure 3 (page 5)
2. Remove all necessary circuit breaker knockouts in the air
handler upper access door.
3-Phase9&15kwelectricheaterkits
1. Snap the 3-pole circuit breaker onto the circuit breaker
bracket. The circuit breaker must be positioned with the
1/4"tabterminalstotherightasshowninFigure 3 (page
5).
2. Remove the bottom two circuit breaker knockouts in the
air handler upper access door.
Line Cover
Heater Kits with circuit breakers are supplied with a line
cover shown in Figure 4 (page 5). The line cover is
required by code in order to protect installers from the line/
supply wiring. The line cover should be installed as shown
in Figure 5 (page 5).
Electric Heater Kits without Circuit Breakers
1. Attach the supplied power terminal block to the circuit
breaker bracket with the supplied screws as shown in
Figure 6 (page 5).
2.Usingthe1/4"terminals,connecttheredsupplywire(s)
from the element assembly to one pole of the terminal
block and connect the black wires to the other pole.
Staged Heat
All Single-phase heater kits are internally staged using B5,
B6, HMG and HMB air handler circuit board logic. B5 air
handlers may stage the heater kit with a slow or fast timed
option. B6 single stage air handlers will not stage the heater
kit. B6 two-stage air handlers may stage the heat Kw turned
on with either a low or high heat call. All 3-phase heater kits
are not equipped for internal staging. Refer to the installation
instructions supplied with the air handler for additional staging
information.
MOTOR SPEED SELECTION
Standard Air Handlers
The blower speed is preset at the factory for operation at
the same speed for heating and cooling, by using the blower
motor jumpering terminal on the blower motor and connecting
it to the desired speed with both the red and black wires
connected to the jumpering terminal. For optimum system
performance and comfort, it may be necessary to change
the factory set speed.
To change the blower speed:
WARNING:
To avoid the risk of electric shock, personal
injury, or death, disconnect all electrical power
to the unit before performing any maintenance
or service. The unit may have more than one
electrical power supply.
1. Disconnect all electrical power to the unit and remove the
upper door.
2. Remove the black and red wires from the blower motor
jumping terminal.
3. Connect the heating speed wire (red) and the cooling
speed wire (black) to the desired blower speed marked on
the terminal block of the blower motor. If needed, re-use
the motor jumping terminal.
IMPORTANT NOTE
After changing the blower speed setting, make sure to
bundle and insulate any unused blower motor leads
so that they will not make contact with the air handler
cabinet or non-insulated live parts.
Standard 3 Speed Motors
Terminal4=Hispeed
Terminal5=Medspeed
Terminal6=Lowspeed
Standard C-Cabinets
TerminalM1=Lowspeed
TerminalM2=MediumLowspeed
TerminalM3=Mediumspeed
TerminalM4=MediumHispeed
TerminalM5=Hispeed.
Highspeedoperationmayberequiredwhenusinga20,24,
or29kwelectricheaterkitinadownowapplication.Also
see Clearances to Combustibles (page 3).
4.Replacetheupperdoorandsecureittotheunit.
5. Restore power to the unit.
Variable Speed Air Handlers
The minimum electric heat airflow is selected by setting
switches on the air handler circuit board. Selecting the
minimum electric heat airflow sets the minimum air flow that
will be produced whenever electric heater kits are energized.
When the electric heater kits are energized along with a heat
pump, the airflow may be higher depending on the basic
cooling/heat-pump airflow setting. Reference the installation
instructions supplied with the air handler for additional airflow
information.
5
Figure 5. Line Cover Installed
Figure 2. Sample Installation
(shown with access door removed)
2 - Pin Connector
7 - Pin Connector
Circuit Breaker
Bracket
Figure 4. Line Cover
Figure 3. Installation of Circuit Breakers
FIGURES & TABLES
Figure 6. Circuit Breaker Bracket with
Terminal Block Installed
Figure 1. Heater Kit Identification Code
HHK 020 -H 1
Product Type:
H-Heater
Product Identifier:
HK - Heater Kit
Generation:
6 - Sixth Series
No. of Breakers
Electric Code:
H=240 - 1 - 60
Q=208 / 240 - 3 - 60
S=480 - 3 - 60
Stage
Sequencer
005 - 5Kw
008 - 8Kw
009 - 9Kw
010 - 10Kw
015 - 15Kw
020 - 20Kw
024 / 025 - 25Kw
029 / 030 - 30Kw
Primary Capacity:
82
6
Table 2. HMG Cabinet Sizes
MODEL CABINET SIZE
H(M,C)G024 A
H(M,C)G030 A
H(M,C)G036 B
H(M,C)G042 B
H(M,C)G048 C
H(M,C)G060 C
MODEL
H8HK-
CABINET
SIZE
MINIMUM REQUIRED BLOWER
HEATING SPEED
A B C UPFLOW HORIZONTAL DOWNFLOW
005H X X X LOW LOW LOW
008H X X X LOW LOW LOW
010H X X X LOW LOW LOW
015H X X X LOW LOW MED
020H X X LOW LOW HIGH
024H X X MED MED HIGH
029H X MED MED N/A
009Q X X LOW LOW LOW
015Q X X LOW LOW MED
009S X 1150 CFM 1150 CFM 1150 CFM
015S X 1400CFM 1400CFM 1400CFM
(1) Only on *30 (2.5 Ton) model air handlers
Table 1. Blower Heating Speed
Table 3. Electrical Ratings
MODEL
NUMBER
H8HK-
VOLTAGE KW
STANDARD AIR HANDLER
(A & B SIZE)
VARIABLE SPEED & STANDARD AIR HANDLER
(C SIZE)
MINIMUM CIRCUIT
AMPACITY
MAX. OVER-CURRENT
CIRCUIT AMPACITY
MINIMUM CIRCUIT
AMPACITY
MAX. OVER-CURRENT
CIRCUIT AMPACITY
CIRCUIT A
CIRCUIT B
CIRCUIT C
SINGLE
CIRCUIT
CIRCUIT A
CIRCUIT B
CIRCUIT C
SINGLE
CIRCUIT
CIRCUIT A
CIRCUIT B
CIRCUIT C
SINGLE
CIRCUIT
CIRCUIT A
CIRCUIT B
CIRCUIT C
SINGLE
CIRCUIT
005H-XX 240 4.8 - - - 30 - - - 30 - - - 34 - - - 40
008H-XX 240 7.5 - - - 45 - - - 50 - - - 48 - - - 50
010H-XX 240 9.6 - - - 55 - - - 60 - - - 59 - - - 60
015H-XX 240 14.4 55 25 - 80 60 30 - 90 59 25 - 83 60 30 - 90
020H-XX 240 19.2 55 50 - 105 60 60 - 125 59 50 - 109 60 60 - 125
024H-XX 240 24.0 - - - - - - - - 59 50 25 134 60 60 30 150
029H-XX 240 28.8 - - - - - - - - 59 50 50 159 60 60 60 175
005H-XX 208 3.6 - - - 27 - - - 30 - - - 30 - - - 40
008H-XX 208 5.6 - - - 39 - - - 40 - - - 42 - - - 50
010H-XX 208 7.2 - - - 48 - - - 50 - - - 52 - - - 60
015H-XX 208 10.8 48 21 - 70 50 25 - 80 52 22 - 73 60 25 - 80
020H-XX 208 14.4 48 43 - 92 50 50 - 100 52 43 - 95 60 50 - 100
024H-XX 208 18.0 - - - - - - - - 52 43 22 117 60 50 25 125
029H-XX 208 21.6 - - - - - - - - 52 43 43 138 60 50 50 150
009Q-XX 240 9.0 - - - 32 - - - 40 - - - 36 - - - 40
015Q-XX 240 14.4 - - - 48 - - - 50 - - - 52 - - - 60
009Q-XX 208 6.8 - - - 29 - - - 30 - - - 32 - - - 40
015Q-XX 208 10.8 - - - 43 - - - 50 - - - 46 - - - 50
009S-XX 460 - - - - - - - - - - - 19 - - - 20
015S-XX 460 -
- - - - - - - - - - 28 - - - 30
Line up the slot hole on the
bracket with the half hole on
the element plate
Place the AC relay
bracket behind the
element plate.
Figure 7. H8HK Heater Kit Installation
7
Figure 8. Single Phase, 3kW & 5 kw W.D.
(Air Handler with Circuit Breaker(s))
2
1
BLACK
12
RED
ORANGE
GREY
7-PIN PLUG
2-PIN
POWER PLUG
LIMIT
ELEMENT
DC RELAY
AC RELAY
TO CONTROL BOARD
TO CONTROL BOARD
CIRCUIT
BREAKER
(Circuit breaker
models only)
TERMINAL
BLOCK
(for select
models only)
SUPPLY VOLTAGE
BLACK
RED RED
BLACK
RED
GREY
WHITE
WIRING DIAGRAM
NOTES:
1. If any of the original wire supplied with this unit
must be replaced, it must be replaced with wiring
material of the same gauge size and temperature
rating.
2. The installation of this heater kit may require a change
in the blower speed tap connection. See Installation
Instructions for details.
3. Use copper conductors with a minimum temperature
rating of 60°C for supply connections.
FIELD WIRING
LEGEND:
LOW VOLTAGE
HIGH VOLTAGE
3 kW, 5 kW, 1-Phase Electric Heater KitH8HK005H-01
H8HK005H-11
711433A
(Replaces 7114330)
05/15
Wiring Diagrams
8
Figure 9. Single Phase, 8kw & 10 kw W.D.
(Air Handler with Circuit Breaker(s))
BLACK
12
RED
GREY
ORANGE
BLUE
2
1
3
LIMIT
AC RELAY
2-PIN
POWER PLUG
DC RELAY
CIRCUIT
BREAKER
(Circuit breaker
models only)
7-PIN PLUG
TO CONTROL BOARD
TO CONTROL BOARD
TERMINAL
BLOCK
(for select
models only)
SUPPLY VOLTAGE
ELEMENT
BLACK
BLACK
RED
RED
RED
RED
BLACK
BLACK
GREY
GREY
WHITE
GREY
WHITE
RED
RED
WIRING DIAGRAM
NOTES:
1. If any of the original wire supplied with this unit
must be replaced, it must be replaced with wiring
material of the same gauge size and temperature rating.
2. The installation of this heater kit may require a change
in the blower speed tap connection. See Installation
Instructions for details.
3. Use copper conductors with a minimum temperature
rating of 60°C for supply connections.
FIELD WIRING
LEGEND:
LOW VOLTAGE
HIGH VOLTAGE
8kW, 10kW, 1-Stage, 240 VAC, 1-Phase Electric Heater KitH8HK008H-01 (without circuit breaker)
H8HK008H-11 (with circuit breaker)
H8HK010H-11 (with circuit breaker)
H8HK010H-01 (without circuit breaker)
711434A
(Replaces 7114340)
05/15
9
BLACK
12
RED
GREY
ORANGE
BLUE
2
1
3
4
YELLOW
TO CONTROL BOARD
TO CONTROL BOARD
CIRCUIT
BREAKER
(Circuit breaker
models only)
SUPPLY VOLTAGE
LIMITELEMENT
AC RELAY
DC RELAY
2-PIN
POWER PLUG
7-PIN PLUG
BLACK
BLACK
RED
RED
RED
RED
GREY
WHITE
BLACK
BLACK
RED
RED
GREY
GREY
WHITE
GREY
GREY
WHITE
BLACK
RED
RED
BLACK
RED
WIRING DIAGRAM
NOTES:
1. If any of the original wire supplied with this unit must be
replaced, it must be replaced with wiring material of the
same gauge size and tempera-ture rating.
2. The installation of this heater kit may require a change in
the blower speed tap connection. See Installation
Instructions for details.
3. Use copper conductors with a minimum temperature
rating of 60°C for supply connections.
FIELD WIRING
LEGEND:
LOW VOLTAGE
HIGH VOLTAGE
15kW, 240 VAC, 1-Phase Electric Heater Kit H8HK015H-21 (with circuit breaker)
711435A
(Replaces 7114350)
05/15
Figure 10. Single Phase, 15 kw W.D.
(Air Handler with Circuit Breaker(s))
10
Figure 11. Single Phase, 20 kw WD
(Air Handler with Circuit Breaker(s))
BLACK
12
RED
5
BROWN
GREY
ORANGE
BLUE
YELLOW
2
1
3
4
ELEMENT
LIMIT
AC RELAY
DC RELAY
CIRCUIT
BREAKER
(Circuit breaker
models only)
SUPPLY VOLTAGE
TO CONTROL BOARD
TO CONTROL BOARD
2-PIN
POWER PLUG
7-PIN PLUG
BLACK
BLACK
RED
RED
RED
RED
GREY
WHITE
BLACK
BLACK
RED
RED
GREY
GREY
WHITE
GREY
GREY
WHITE
BLACK
RED RED
BLACK
RED
BLACK
RED
GREY
RED
RED
GREY
WHITE
BLACK
20 kW, 240 VAC, 1-Phase Electric Heater Kit
WIRING DIAGRAM
H8HK020H-21
NOTES
1. If any of the original wire supplied with this
unit must be replaced, it must be replaced
with wiring material of the same gauge size
and temperature rating.
2. The installation of this heater kit may require a
change in the blower speed tap connection.
See Installation Instructions for details.
3. Use copper conductors with a minimum
temperature rating of 60°C for supply
connections.
FIELD WIRING
LEGEND:
LOW VOLTAGE
HIGH VOLTAGE
711436A
(Replaces 7114360)
05/15
11
Figure 12. Single Phase, 25 kw WD
(Air Handler with Circuit Breaker(s))
BLACK
12
RED
5
BROWN
GREY
ORANGE
BLUE
YELLOW
2
1
3
4
ELEMENT
LIMIT
AC RELAY
DC RELAY
CIRCUIT
BREAKER
(Circuit breaker
models only)
SUPPLY VOLTAGE
TO CONTROL BOARD
TO CONTROL BOARD
6
WHITE
2-PIN
POWER PLUG
7-PIN PLUG
BLACK
BLACK
RED
RED
RED
RED
GREY
WHITE
BLACK
BLACK
RED
RED
GREY
GREY
WHITE
GREY
GREY
WHITE
BLACK
RED RED
BLACK
RED
BLACK
RED
GREY
RED RED
GREY
WHITE
BLACK
BLACK
RED
RED
RED
BLACK
GREY
WHITE
GREY
WIRING DIAGRAM
FIELD WIRING
LEGEND:
LOW VOLTAGE
HIGH VOLTAGE
NOTES
1. If any of the original wire supplied with this
unit must be replaced, it must be replaced
with wiring material of the same gauge size
and temperature rating.
2. The installation of this heater kit may require a
change in the blower speed tap connection.
See Installation Instructions for details.
3. Use copper conductors with a minimum
temperature rating of 60°C for supply
connections.
25kW , 240 VAC, 1-Phase Electric Heater Kit H8HK024H-31 (with circuit breaker)
711437A
(Replaces 7114370)
05/15
12
BLACK
12
RED
5
BROWN
GREY
ORANGE
BLUE
YELLOW
2
1
3
4
ELEMENT
LIMIT
AC RELAY
DC RELAY
CIRCUIT
BREAKER
(Circuit breaker
models only)
SUPPLY VOLTAGE
TO CONTROL BOARD
TO CONTROL BOARD
6
WHITE
2-PIN
POWER PLUG
7-PIN PLUG
7
VIOLET
711438A
(Replaces 7114380)
05/15
BLACK
BLACK
RED
RED
RED
RED
GREY
WHITE
BLACK
BLACK
RED
RED
GREY
GREY
WHITE
GREY
GREY
WHITE
BLACK
RED
RED
BLACK
RED
BLACK
RED
GREY
RED
RED
GREY
WHITE
BLACK
BLACK
RED
RED
RED
BLACK
GREY
WHITE
GREY
GREY
GREY
WHITE
RED
BLACK
BLACK
RED
RED
WIRING DIAGRAM
FIELD WIRING
LEGEND:
LOW VOLTAGE
HIGH VOLTAGE
30kW , 240 VAC, 1-Phase Electric Heater Kit
NOTES
1. If any of the original wire supplied with this
unit must be replaced, it must be replaced
with wiring material of the same gauge size
and temperature rating.
2. The installation of this heater kit may require a
change in the blower speed tap connection.
See Installation Instructions for details.
3. Use copper conductors with a minimum
temperature rating of 60°C for supply
connections.
H8HK029H-31 (with circuit breaker)
Figure 13. Single Phase, 30 kw W.D.
(Air Handler with Circuit Breaker(s))
13
CIRCUIT
BREAKERS
SUPPLY
VOLTAGE
GROUND
POWER
PLUG
LIMIT
WIRING DIAGRAM
H8HK 3-Phase Electric Heater Kit, 208/240V
Legend
Field Wiring
Factory Wiring:
Low Voltage
High Voltage
NOTES
1. The blower motor speed tap connection may not be as shown. See the Installation Instructions.
2. Disconnect all power before servicing.
3. Transformer may have a dual voltage primary tap. Match the tap position with the supply voltage used.
4. If the Internal wiring is replaced, use only 105
°
C copper wire of the same gauge.
TRANSFORMER
24V
BLACK
WHITE RED
GREY
HEATER KIT
PLUG
2
1
BLACK
RED
ELEMENT 1
BLACK
L1
L2
L3
L1
L2
L3
ELEMENT 2
ELEMENT 3
BLACK
YELLOW
RED
BLACK
RED
BLACK
YELLOW
RED
ELEMENT 3
ELEMENT 2
ELEMENT 1
CONTACTOR
BLACK
34
56
7
RELAY
RED
ORANGE
GREY
From indoor
air handler
circuit board
RED
GREY
From indoor
air handler
circuit board
To indoor
air handler
circuit board
COM
NO
YELLOW
BLACK
BROWN
7114390
08/14
Figure 14. 3-Phase, 9kw & 15kw W.D.
14
3-Phase Electric Heater Kit, 480V
4. If the internal wiring is replaced, use only 105 C copper wire of the same gauge.
10097720
09/15
FIELD WIRING
LEGEND:
LOW VOLTAGE
HIGH VOLTAGE
WIRING DIAGRAM
H8HK
NOTES:
1. The blower motor speed settings are not shown here. See the Installation Instructions.
2. Disconnect all power before servicing.
3. Line voltage from the contactor should be connected to the circuit breaker through the terminal screw.
CIRCUIT
BREAKER
(Circuit Breaker
in Air Handler)
CONTACTOR
L1
L2
L3
1 2 3 4
5 6 7
To Indoor Air Handler Circuit Board
LIMIT
480V
From Indoor Air Handler Circuit Board
ELEMENTS
DC RELAY
7 PIN PLUG
24V
BROWN
BROWN
BLACK
YELLOW
RED
BLACK
BLACK
BLACK
BLACK
BLACK
RED
RED
RED
GREY
GREY
GREY
ORANGE
RED
BLACK
WHITE
Figure 15. 3-Phase, 460V W.D.
15
INSTALLER: PLEASE LEAVE THESE INSTALLATION
INSTRUCTIONS WITH THE HOMEOWNER
709774B (Replaces709774A)
Specifications & illustrations subject to change without notice or incurring obligations (03/16).
O’Fallon,MO,©NortekGlobalHVACLLC2016.AllRightsReserved.
/