Art.: 80900223
Short Instruction for Spraying LEEB LT and GS
Variant ECO, CCS and CCS Pro
NOTE
The short instruction for the operation of the machine is only to be used with observation of the
safety and warning notes of the pertaining operating instructions. Compensation claims for dam-
ages due to non-observance of the operating instructions are excluded.
1. Filling the machine
2. Machines of the ECO and CCS variants:
Set the ball valve on the suction side to solu-
tion tank and the ball valve on the pressure
side to circulation/spraying.
Ball valve
pressure side
Ball valve
suction side
3. Start the tractor
¾ ECO variant: Switch on the PTO-shaft.
¾ Variants CCS and CCS Pro: Set the diesel
speed to approx. 1500 rpm.
4. Touch and hold the Unfold button on the folding
menu until the folding boom has fully unfolded.
Folding menu
Folding
Unfolding
5. Adjusting the working height of the spraying boom
6. Enter l/ha setpoint
7. Check the value “min. pressure” and “max. pres-
sure” for the permissible spraying pressure range.
8. Activate the folding boom control
9. Switch on circulation
Main control page
l/ha setpoint
Folding menu
Circulation
on/o
Folding boom control
on/o
Spraying
on/o
10. Switch on main sprayer switch
Main spraying
switch