Gilson Melting Pot User manual

  • Hello! I am an AI chatbot trained to assist you with the Gilson Melting Pot User manual. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
INTRODUCTION
These instructions are intended to be a guide for general opera-
tion of this device. For complete instructions on capping con-
crete specimens with sulfur mortar, please refer to ASTM C 617
or AASHTO T 231.
UNPACKING & SETUP
Carefully inspect melting pot for shipping related damages. Re-
port any damage to the shipping company as soon as possible.
Connect unit to a properly grounded power supply with
the correct voltage and amperage requirements. (Electrical
requirements are listed on the specication tag of each unit.)
WARNING!
Use this device only in a properly ventilated area.
NEVER leave a melting pot unattended during
operation. Unplug the pot when not in use.
Wear protective eye wear and gloves when using the
melting pot. DO NOT wear shorts or short-sleeve shirts.
OPERATING INSTRUCTIONS
For All Units:
Consult supplier of material to be melted for the correct
melting temperature. NEVER set controls above that
temperature.
HM-205
Keep cover in place. This speeds melt time, reduces o-gassing
and prevents contamination of the material.
For Operation with a Timer:
Select a timer that meets or exceeds electrical requirements
of melting pot.
Connect timer to a properly grounded power supply meeting
the specied requirements.
Plug melting pot power cord into timer receptacle.
Set timer to turn on melting pot two hours before arrival and
to turn o at the end of the work day.
ASTM C 617; AASHTO T 231
Melting Pot
HM-200, HM-201, HM-202, HM-204, HM-205
& HM-206
OPERATING MANUAL
Rev: 01/2019
PHONE: 800-444-1508 P.O. Box 200, Lewis Center, Ohio 43035-0200
740-548-7298 E-mail: customerservice@gilsonco.com Product Web Page: www.globalgilson.com
FAX: 800-255-5314
740-548-5314
/