Toro Cement Bowl, Compact Tool Carrier, Cement Bowl, Compact Utility Loader Installation guide

  • Hello! I am an AI chatbot trained to assist you with the Toro Cement Bowl, Compact Tool Carrier Installation guide. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
FormNo.3438-610RevA
CementBowl
ForCompactUtilityLoaderswithAugerDriveHeadAttachment
ModelNo.22442—SerialNo.260000001andUp
InstallationInstructions
Safety
Important:Beforeusingthisproduct,readthe
safetysectioninyourtractionunitoperators
manual,andfollowallprecautionslistedthere.
StabilityRatings
Todeterminethedegreeofslopeyoucantraverse
withthecementbowlinstalledonatractionunit,nd
thestabilityratingforthehillpositionyouwantto
travelintheappropriatetableonthefollowingpage,
thenndthedegreeofslopeforthesameratingand
hillpositionintheStabilityDatasectionofthetraction
unitoperatorsmanual.
Important:Ifyourtractionunithasarear
operatorsplatform,thecounterweightmustbe
usedontheplatformwhileusingthecementbowl,
orthetractionunitwillbecomeunstable.
WARNING
Exceedingthemaximumrecommendedslope
cancausethetractionunittotip,crushing
youorbystanders.
Donotdrivethetractionunitonaslope
steeperthanthemaximumrecommended
slope,asdeterminedinthefollowingtables
andthetractionunitoperatorsmanual.
StabilitywithaLoadedBowl
OrientationStabilityRating
FrontUphill
B
RearUphill
D
SideUphill
C
StabilitywithanUnoadedBowl
OrientationStabilityRating
FrontUphill
C
RearUphill
C
SideUphill
B
©2020—TheToro®Company
8111LyndaleAvenueSouth
Bloomington,MN55420
Registeratwww.Toro.com.
OriginalInstructions(EN)
PrintedintheUSA
AllRightsReserved
*3438-610*A
SafetyandInstructional
Decals
Safetydecalsandinstructionsare
easilyvisibletotheoperatorandare
locatednearanyareaofpotential
danger.Replaceanydecalthatis
damagedorlost.
decal100-4664
100-4664
1.Tippinghazard—themaximumloadwhiledrivingthe
machineis91kg(200lb).
Installation
1
InstallingtheCementBowl
ontotheAugerDriveHead
Partsneededforthisprocedure:
1
Cementbowl
2Bolt
2Nut
Procedure
1.Raisetheloaderarmssothedriveheadclears
thegroundandstoptheengine.
2.Manuallyrotatetheaugerdriveheadup,until
youcaninstalltwoboltsintotheholesonboth
sidesofthecradlearms,securingthedrive
head.Secureeachboltwithanut(Figure1).
g003845
Figure1
1.Augerdrivehead3.Nutsandbolts
2.Cradlearm
3.Starttheengine.
4.Maneuverthedriveshaftintothecollaronthe
backofthebowl(Figure2).
2
g003846
Figure2
1.Augerdrivehead
2.Cementbowl
5.Stoptheengine.
6.Securethebowltothedriveheadwiththebolt
andnutsuppliedwiththeaugerdrivehead
(Figure3).
g003847
Figure3
1.Bolt2.Nut
2
Reading/Storingthe
Documentation
Partsneededforthisprocedure:
1
OperatorsManual
1
PartsCatalog
Procedure
1.Readthedocumentation.
2.Storethedocumentationinasafeplace.
Operation
Specications
Note:Specicationsanddesignaresubjectto
changewithoutnotice.
Width
25.15inches(64cm)
Length
18.25inches(46cm)
Weight
75lb(34kg)
Maximumdryconcreteload
200lb(90.7kg)
MixingandPouring
Concrete
WARNING
Whenfullofconcrete,thebowlisveryheavy
andcouldunbalancethetractionunit.The
tractionunitcouldtip,seriouslyinjuringyou
orbystanders.
Neverusethecementbowlona200or
300seriescompactutilityloaderwithout
rstinstallingthecounterweight,available
fromyourTorodealer.
Alwayskeepthebowlclosetotheground.
1.Lowertheloaderarmsasfaraspossiblewhile
tiltingthebowlupwardasfaraspossible.
2.Addupto200lb(90.7Kg)ofdryconcrete
mixture.
3.Movethethrottlelevertothefastposition
(rabbit).
4.Ifyourtractionunithasaspeedselectorand
owdivider,movethespeedselectorleverto
fast(Rabbit),andtheowdividercontroltothe
10to11o’clockposition(20to30rpm).
5.Pushtheauxiliaryhydraulicsleverawayfrom
theoperatorgriptomixtheconcreteandadd
theappropriateamountofwater.
6.Whenthecementissufcientlymixed,movethe
auxiliaryhydraulicslevertoneutralanddrive
slowlytotheworksite.
7.Tiltthebowlforwardandpulltheauxiliary
hydraulicslevertotheoperatorgripandholdit
todumptheconcrete.
8.Whennishedusingthebowl,washitoutbefore
theconcretesets.
3
RemovingtheBowlfrom
theAugerDriveHead
1.Setthebowldowninitsstoragelocation.
2.Stoptheengine.
3.Removetheboltandnutsecuringthedrivehead
tothebowl.
4.Starttheengineandbackthetractionunitaway
fromthebowl.
Storage
1.Beforelongtermstorage,washthebowlwith
milddetergentandwatertoremovedirtand
grime.
2.Storethebowlinaclean,drygarageorstorage
area.Coverittoprotectitandkeepitclean.
4
/