Toro Kawasaki Engine Conversion Kit, Suzuki-Powered Heavy-Duty Lawn Mowers Installation guide

  • Hello! I am an AI chatbot trained to assist you with the Toro Kawasaki Engine Conversion Kit, Suzuki-Powered Heavy-Duty Lawn Mowers Installation guide. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
FormNo.3365-744RevA
KawasakiEngineConversionKit
Suzuki-PoweredHeavy-DutyLawnMowerswithBBC
ModelNo.119-7845
InstallationInstructions
Installation
LooseParts
Usethechartbelowtoverifythatallpartshavebeenshipped.
ProcedureDescription
Qty.
Use
Beltcover(74-1770)
1
Engine(117-5220)
1
Decal(110-0520)
1
Screw(95-1727)
4
Bladeretainerspacer(103-3795)
1
Tankbracket(115-0954-03)
1
Fueltankcap(93-7198)
1
Screw(104-2628)
3
Fuelhose(109-0296)
1
Fuellter(71-9280)
1
Clamp(2412-98)
4
Fuelhose(109-0650)
1
Cabletie(3290-378)
4
Bladebolt1
BBCspacer
1
Springwasher
2
2
Throttlecontrol(117-3543)
1
Installthenewengine.
1
RemovingtheOldEngine
NoPartsRequired
Procedure
Important:Saveallfastenersthatyouremovedfor
reuseunlessotherwisenoted.
1.Drainthefuelfromthefueltank.
2.Removetheoldbeltcoveranddiscardit.
3.Removeanddiscardthethrottlecontrolcable.
4.Removeanddiscardtheoldfuelhose,fuellter,
andclamp.
5.RemovethebladeandtheBBCassembly.
6.Removethebeltfromthedriverpulley;inspectthe
beltforwearandreplaceitifnecessary.
7.Removetheenginemountingbolts.
8.Removetheoldenginefromthemowerhousing.
9.Removethefueltankfromthetankbaseandretain
itforreuse.
10.Replacethefueltankcapwithanewcapprovidedin
thekit;discardtheoldfueltankcap.
11.Removeanddiscardthedischargetunneldoor.
12.Cleanthemowerhousingandcheckitfordamage
andwear.
©2010—TheToro®Company
8111LyndaleAvenueSouth
Bloomington,MN55420
Registeratwww.Toro.com.
OriginalInstructions(EN)
PrintedintheUSA
AllRightsReserved
Figure1
1.Engine
8.Fuelhose,fuellter,andclamps
2.Mowerdeck
9.Enginemountingbolt(4)
3.Beltcover
10.Spacer
4.Fueltankcap
11.Springwasher
5.Throttlecontrol12.Bladebolt
6.Dischargedoor13.Tankbracketscrew
7.Tankbracket
2
2
Partsneededforthisprocedure:
1
Beltcover(74-1770)
1
Engine(117-5220)
1
Decal(110-0520)
4
Screw(95-1727)
1
Bladeretainerspacer(103-3795)
1
Tankbracket(115-0954-03)
1
Fueltankcap(93-7198)
3
Screw(104-2628)
1
Fuelhose(109-0296)
1
Fuellter(71-9280)
4
Clamp(2412-98)
1
Fuelhose(109-0650)
4
Cabletie(3290-378)
1Bladebolt
1
BBCspacer
2
Springwasher
1
Throttlecontrol(117-3543)
Procedure
Note:RefertoFigure1forinstallingthenewengine.
1.Installthenewdooronthedischargetunnel.
2.Installthetankbracketontotheengineusing3
screws(fromtheloosepartsbag)andLoctite(242).
Note:Torquethescrewsto70–120in-lb.
3.Installthefueltankontothemountingbracketusing
2screws.
Note:Torquethescrewsto40–50in-lb.
4.Installthenewengineonthemowerhousing.
Note:Torquetheenginemountingboltsto
250–400in-lb.
5.InstalltheBBCassembly.
Note:ForinformationoninstallingtheBBC
assembly,refertotheWalkBehindPowerMowerDrive
SystemsServiceManual(FormNo.492-4733).
6.Installtheblade.
Note:Torquethebladenutsto180–320in-lb.
7.Attachthenewfuelhose,fuellter,andclamptothe
engineandthefueltank.
Note:Theshorthoseattachestothefueltank.
8.Installandadjustthenewthrottlecontrolcable.
9.Replacethebeltcover.
3
/