Beckett CleanCut Oil Pump Operating instructions

  • Hello! I am an AI chatbot trained to assist you with the Beckett CleanCut Oil Pump Operating instructions. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
The PD Timer delay cordset is a direct replacement for standard oil
burner solenoid valve cordsets but contains electronics that provide a
precise 4 sec. delay before the valve coil is energized. It is designed to
plug into 120 VAC solenoid valves such as the Beckett / Delta F84 valve
and the CLEANCUT and Suntec valves, to provide a valve-on delay with
primary controls that do not provide the delay.
The PD Timer delay cordset is a direct replacement for standard oil
burner solenoid valve cordsets but contains electronics that provide a
precise 4 sec. delay before the valve coil is energized. It is designed to
plug into 120 VAC solenoid valves such as the Beckett / Delta F84 valve
and the CLEANCUT and Suntec valves, to provide a valve-on delay with
primary controls that do not provide the delay.
PRECISION DELAY (PD) TIMER KIT #21887U
INSTALLATION INSTRUCTIONS
21887U Kit Parts List:
(1) 21887 PD Timer delay cordset
(1) 61473 Installation instructions
INSTALLATION INSTRUCTIONS:
1. Disconnect all power to the burner.
2. Loosen the primary control and igniter fasteners to access the solenoid
valve wiring. Detach and remove existing valve cordset and delay timer, if
there is one.
3. Plug the PD timer securely into the coil of the valve.
4. Route the PD timer cordset through the housing wiring area and into the
4x4 wiring box. Connect the leads to the motor and neutral leads of the
primary control. See the typical wiring diagram below.
5. Secure primary control and igniter. Energize burner. The valve should be
energized 4 seconds after the motor starts.
Printed in the U.S.A. RWB 61473 R0303
SK9567
R.W. BECKETT CORPORATION
P.O. Box 1289, Elyria, Ohio 44036
R.W.
BECKETT CANADA, LTD
430 Laird, Unit 3, Guelph, Ontario, N1G 3X7
PRECISION DELAY (PD) TIMER KIT #21887U
INSTALLATION INSTRUCTIONS
21887U Kit Parts List:
(1) 21887 PD Timer delay cordset
(1) 61473 Installation instructions
INSTALLATION INSTRUCTIONS:
1. Disconnect all power to the burner.
2. Loosen the primary control and igniter fasteners to access the solenoid
valve wiring. Detach and remove existing valve cordset and delay timer, if
there is one.
3. Plug the PD timer securely into the coil of the valve.
4. Route the PD timer cordset through the housing wiring area and into the
4x4 wiring box. Connect the leads to the motor and neutral leads of the
primary control. See the typical wiring diagram below.
5. Secure primary control and igniter. Energize burner. The valve should be
energized 4 seconds after the motor starts.
Printed in the U.S.A. RWB 61473 R0303
SK9567
R.W. BECKETT CORPORATION
P.O. Box 1289, Elyria, Ohio 44036
R.W.
BECKETT CANADA, LTD
430 Laird, Unit 3, Guelph, Ontario, N1G 3X7
/