VEVOR Bucket Integral Digging Tooth User manual

Type
User manual
Bucket integral digging tooth instruction manual
1. Product Overview
2. Product assembly instructions
1: place the bucket motherboard according to the bucket size in
bucket corresponding position, if there is a hole bucket on both sides
of the edge, it shall, in accordance with the reserved hole position will
bolt installation, product main board and bucket maintain tightness
state (note: if there is no hole on the bucket, it should be according to
the products are mainly on the holes punched on the bucket, then to
product for installation)
2: place the tooth tooth one by one according to the position of
the tooth root on the mainboard for installation;
3: put the pin in accordance with the reserved holes on the tooth
one by one, need to use a hammer to knock into the hole, ensure that
the pin is complete into the hole, ensure the installation and assembly
of the tooth and bucket;
4: Assembly is complete.
The serial
number
NAME
The length
mm)
teeth
PCS
pin
PCS
Bolt + nut
PCS
1
48 inch
1200
6
6
4
2
60 inch
1505
6
6
4
3
66 inch
1657
7
7
4
4
72 inch
18096
7
7
4
  • Page 1 1

VEVOR Bucket Integral Digging Tooth User manual

Type
User manual

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI