Heat & Glo • 350X-AU, 550X-AU Installation Manual • 2279-980 Rev. L • 8/23
2
Safety Alert Key:
• DANGER! Indicates a hazardous situation which, if not avoided will result in death or serious injury.
• WARNING! Indicates a hazardous situation which, if not avoided could result in death or serious injury.
• CAUTION! Indicates a hazardous situation which, if not avoided, could result in minor or moderate injury.
• NOTICE: Used to address practices not related to personal injury.
Table of Contents
Installation Standard Work Checklist .................... 3
1 Product Specic and Important Safety Information
A. Appliance Certication ............................4
B. Glass Specications ..............................4
C. Gas Pressure Requirements .......................4
D. High Altitude Installations ..........................5
E. Non-Combustible Materials Specication. . . . . . . . . . . . . . 5
F. Combustible Materials Specication .................5
G. Electrical Codes .................................5
2 Getting Started
A. Design and Installation Considerations ...............6
B. Good Faith Wall Surface/TV Guidelines ..............6
C. Tools and Supplies Needed ........................6
D. Inspect Appliance and Components ..................7
3 Framing and Clearances
A. Appliance/Decorative Front Dimension Diagrams .......8
B. Clearances to Combustibles ......................10
C. Constructing the Appliance Chase ..................12
D. Floor Protection ................................12
E. Vinyl Flooring ..................................12
4 Termination Location and Vent Information
A. Vent Termination Minimum Clearances .............. 13
B. Chimney Diagram. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14
C. Approved Pipe .................................15
D. Use of Elbows ................................. 15
E. Measuring Standards ............................ 16
F. Vent Diagrams .................................17
G. Power Vent Congurations ........................30
5 Vent Clearances and Framing
A. Pipe Clearances to Combustibles .................. 31
B. Wall Penetration Framing/Firestops .................32
C. Ceiling Firestop/Floor Penetration Framing ...........33
D. Install Attic Insulation Shield .......................33
6 Appliance Preparation
A. Vent Collar Preparation ..........................34
B. Installing the Optional Heat-Zone®-240V Kit ..........36
C. Securing and Leveling the Appliance ................36
D. Non-Combustible Material ........................36
7 Venting and Chimneys
A. Assemble Vent Sections .........................37
B. Assemble Slip Sections ..........................38
C. Secure the Vent Sections ......................... 39
D. Disassemble Vent Sections ....................... 39
E. Vertical Termination Requirements ..................40
F. Horizontal Termination Requirements ............... 41
8 Electrical Information
A. General Information .............................43
B. Wiring Requirements ............................44
C. Fan ..........................................45
D. Control Module Operation ........................45
9 Gas Information
A. Fuel Conversion ................................ 46
B. Gas Pressure ..................................46
C. Gas Service Access .............................46
D. Gas Connection ................................46
E. High Altitude Installations .........................46
F. Air Shutter Setting ..............................47
G. Burner Identication/Verication ....................48
10 Finishing
A. Facing Material ................................. 49
B. Mantel and Wall Projections ....................... 50
C. Decorative Front Finishing ........................52
11 Appliance Setup
A. Remove Fixed Glass Assembly ....................53
B. Remove the Shipping Materials ...................53
C. Clean the Appliance .............................53
D. Setup Overview ................................53
E. Install Hearth Components, Teco-Sil, Glowing
Embers® , Refractory and Logs .................... 53
F. Install and Paint Teco-Sil .........................54
G. Install Logs. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 55
H. LED’s ........................................58
I. Install Fixed Glass Assembly ......................58
J. Install Decorative Front .......................... 58
K. Appliance Operation .............................58
12 Reference Materials
A. Vent Components Diagrams ...................... 59
B. Accessories ...................................66
= Contains updated information.