YSI EXO Long Term Deployment Tube User guide

  • Hello! I am an AI chatbot trained to assist you with the YSI EXO Long Term Deployment Tube User guide. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
Stop Bolt
Long Term Monitoring Guide
Vertical Tube Deployments
September 2014 Rev A
TM
EXOwater.com
MATERIALS
• SCH 40 or SCH 80 - 4” PVC Pipe
• 1/2” SS Bolt, 6” Long
• 1/2” Flat Washers, Lock and Nut
• 4” Lockable Well Cap, Plastic or Aluminum
• 5200 Marine Sealant (for bonding pipe to cap)
Lockable
Well Cap
Expected
High Water
12.0”
12.0”
6.0”
12.0”
12.0”
Open Bottom
INSTRUCTIONS
Vent or tube flushing hole pattern:
2.5” internal diameter.
Start one set 6” from end or top of sensor
holes. Drill two holes at 0° and 180°.
Start second set of two holes at 12” from
sensor holes, drill at 90° and 270°.
Sensor area hole pattern:
1.0” internal diameter, 1.5” on center from
1.0” above stop pin.
NOTES
• Clean and degrease pipe prior to
modifications
• In marine and other fouling sites paint
inside and out with anti-fouling paint
• Clean pipe at least twice a year
Copper DesignMounted to Pier
MATERIALS
• SCH 40 or SCH 80 - 4” PVC Pipe, 36” Long
• 1/2” SS Bolt or Eye Bolt, 6” Long
• 1/2” Flat Washers, Lock and Nut
• 4” Lockable Well Cap, Plastic or Aluminum
• 5200 Marine Sealant (for bonding pipe to cap)
Two heavy weighted slabs to support pipe
Lockable
Well Cap
Stop Bolt +
Open Bottom
NOTES
• PVC pipe must be firmly secured to its base or mount to prevent loss in high flows
• Mount and pipe should be treated with anti-fouling paint if in fouling environment
• Secure submerged parts to shore with chain or SS wire rope to a fixed object
• Never clamp sonde directly to mount
FLOW
Sensors
~45° to flow
Chain to fixed object or anchor on shore
INSTRUCTIONS
Vent or tube flushing hole pattern:
2.5” internal diameter.
Drill one set of two, starting 6” from sensor
holes at 0° and 180°. Drill second set of two
12” holes upwards at 90° and 270°.
Sensor area hole pattern:
1.0” internal diameter, 1.5” on centers 12”
area from 1” above stop bolt.
Long Term Monitoring Guide
Horizontal Tube Deployments
TM
36”
12.0”
12.0”
6.0”
September 2014 Rev A
EXOwater.com
Shows exposed sensors.
No debris deployments only.
/