YSI EXO Long Term Deployment Tube User guide

Type
User guide
Stop Bolt
Long Term Monitoring Guide
Vertical Tube Deployments
September 2014 Rev A
TM
EXOwater.com
MATERIALS
• SCH 40 or SCH 80 - 4” PVC Pipe
• 1/2” SS Bolt, 6” Long
• 1/2” Flat Washers, Lock and Nut
• 4” Lockable Well Cap, Plastic or Aluminum
• 5200 Marine Sealant (for bonding pipe to cap)
Lockable
Well Cap
Expected
High Water
12.0”
12.0”
6.0”
12.0”
12.0”
Open Bottom
INSTRUCTIONS
Vent or tube flushing hole pattern:
2.5” internal diameter.
Start one set 6” from end or top of sensor
holes. Drill two holes at 0° and 180°.
Start second set of two holes at 12” from
sensor holes, drill at 90° and 270°.
Sensor area hole pattern:
1.0” internal diameter, 1.5” on center from
1.0” above stop pin.
NOTES
• Clean and degrease pipe prior to
modifications
• In marine and other fouling sites paint
inside and out with anti-fouling paint
• Clean pipe at least twice a year
Copper DesignMounted to Pier
MATERIALS
• SCH 40 or SCH 80 - 4” PVC Pipe, 36” Long
• 1/2” SS Bolt or Eye Bolt, 6” Long
• 1/2” Flat Washers, Lock and Nut
• 4” Lockable Well Cap, Plastic or Aluminum
• 5200 Marine Sealant (for bonding pipe to cap)
Two heavy weighted slabs to support pipe
Lockable
Well Cap
Stop Bolt +
Open Bottom
NOTES
• PVC pipe must be firmly secured to its base or mount to prevent loss in high flows
• Mount and pipe should be treated with anti-fouling paint if in fouling environment
• Secure submerged parts to shore with chain or SS wire rope to a fixed object
• Never clamp sonde directly to mount
FLOW
Sensors
~45° to flow
Chain to fixed object or anchor on shore
INSTRUCTIONS
Vent or tube flushing hole pattern:
2.5” internal diameter.
Drill one set of two, starting 6” from sensor
holes at 0° and 180°. Drill second set of two
12” holes upwards at 90° and 270°.
Sensor area hole pattern:
1.0” internal diameter, 1.5” on centers 12”
area from 1” above stop bolt.
Long Term Monitoring Guide
Horizontal Tube Deployments
TM
36”
12.0”
12.0”
6.0”
September 2014 Rev A
EXOwater.com
Shows exposed sensors.
No debris deployments only.
  • Page 1 1
  • Page 2 2

YSI EXO Long Term Deployment Tube User guide

Type
User guide

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI