INSTALLATION INSTRUCTIONS FOR LYTECASTER INCANDESCENT
PRE-WIRED MOUNTING FRAME
07-04/Rev-02
ISF:1102IC
FIG.3
FIG.4
FIG.5 FIG.6
FIG.7
FIG.8
FIG.11
FIG.12
MOUNTING
FRAME
MOUNTING
BAR
LOCKING
TABS
MOUNTING
BAR
LOCKING
CLIP
MOUNTING
FRAME
"PRY-OUT"
PLUG
FLEXIBLE
WIRE
WIRE
CONNECTOR
JUNCTION
BOX
LIGHTING
UNIT
PLUMB
LINE
MARK
"ROTO-CLIP"
FASTENERS
MOUNTING
FRAME
SOCKET
"PRY-OUT"
PLUG
JUNCTION
BOX
JUNCTION
BOX
FLEXIBLE
CONDUIT
BX
CONNECTOR
WITH VAPOUR BARRIER COVER: NºVBE (Order separately)
1. Select a location for the fixture.
2. Fasten the edge of the
vapour barrier cover under the wood joist. (Fig.1)
3. Install the fixture (see step A, B and C).
4. Install the ceiling vapour barrier. (Fig.2)
Note: Seal the edges of the vapour barrier cover and the vapour barrier.
(Fig.2)
FOR NEW CEILING:
A. MOUNTING BAR:
Note-1: The mounting bars are extensible from 12½" to 29" max.
Note-2: For off-centre installation, use the 20" expandable mounting bars
(Nº1964, order separately).
1. Insert the
mounting bars into the proper openings on the short side or the
long side of the
mounting frame. (Fig.4)
2. Align the
mounting bar with the bottom edge of the joist. (Fig.3)
3. Push in the
built-in nailer. (Fig.3)
B. MOUNTING FRAME:
1. Align the
mounting frame using the alignment marks. (Fig.10)
2. Install the
locking clip. (Fig.5)
Note-1: The ocking clip is also available separately
(Nº0098, order separately).
Note-2: To lock more securely into place fold the locking tabs. (Fig.4)
Note-3: Make sure that the opening in the mounting frame is clear before
cutting. (Fig.11)
C. WIRE-IN:
1. Remove the appropriate "
Pry-out plug". (Fig.6)
2. Insert the supply lead into the
junction box:
a) If using
FLEXIBLE CONDUIT: Use a BX connector (not provided). (Fig.7)
b) If using
FLEX WIRE: Insert under the wire connector. (Fig.8)
3. Connect the
ground lead. (Fig.9)
4. Connect the
white leads (NEUTRAL) together, and the black leads
(120V) together. (Fig.9)
D. CEILING:
1. Mark the position of the
lighting unit and close the ceiling. (Fig.10)
2. Cut an opening in the ceiling using the
mounting frame as a template.
(Fig.11)
3. Pull out the
socket. (Fig.12)
Note: The socket may be used for temporary lighting.
TRIM:
Install the trim using the appropriate sheet.
Note: For the series 1131 & 1133 (with the slope ceiling)
Position the
mounting frame with the junction box facing up. (Fig.13)
PLUMB
LINE
FIG.10
FIG.13
JUNCTION
BOX
MOUNTING
FRAME
WOOD JOIST
FIG.1 FIG.2
VAPOUR
BARRIER EXTENDER
VAPOUR BARRIER
VAPOUR BARRIER
EXTENDER
VAPOUR BARRIER
SILICONE
SEALER
OR OTHER
FIXTURE
FIG.9
INPUT (120V)
GROUND
THERMAL
PROTECTOR
BLACK
WHITE
JUNCTION
BOX
LAMP
BLACK
NEUTRAL (white)
MOUNTING
BAR
BUILT-IN
NAILER
WOOD
JOIST
INSTRUCTION SHEETINSTRUCTION SHEET
INSTRUCTION SHEETINSTRUCTION SHEET
INSTRUCTION SHEET
Read and understand these instructions before installing the luminaire.
CAUTION: Branch circuit conductors must be rated 90°C minimum. To prevent electrical shock turn off electricity and check your
local electrical code and regulations. Consult a qualified electrician before installing.
WARNING: - Risk of fire: Transformer contains luminaire thermal protector. Use only replacement transformer obtained from
Lightolier CFI.
  • Page 1 1

Lightolier Lytecaster Frames Install Instructions

Type
Install Instructions

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI