FMI Outdoor Fireplace MM39/44/49VF User manual

Category
Fireplaces
Type
User manual
Instructions
Models MM39/44/49VF
Do not store or use gasoline or other
ammable vapors and liquids in the
vicinity of this or any other appliance.
WHAT TO DO IF YOU SMELL GAS:
Do not try to light any appliance.•
Do not touch any electrical switch; do •
not use any phone in your building.
Immediately call your gas supplier from •
a neighbors phone and follow the gas
suppliers instructions.
If you cannot reach your gas supplier, •
call the re department.
Installation and service must be
performed by a qualied installer, service
agency, or the gas supplier.
WARNING:
If the information in these instructions is
not followed exactly, a re or explosion
may result causing property damage,
personal injury or death.
Vent Free Universal Masonry Firebox
This rebox has been tested and approved by PFS
under ANSI Z21.91 for use with any ANSI Z21.11.2
approved gas logs.
FOR USE ONLY WITH A LISTED GAS-FIRED UNVENTED
DECORATIVE ROOM HEATER NOT TO EXCEED 40,000
BTU/HR
DO NOT BUILD A WOOD FIRE.
Carefullyreviewtheinstructionssuppliedwiththedecorative
typeunventedroomheaterfortheminimumreplacesize
requirement.
DO NOT INSTALL AN APPLIANCE IN THlS FIREBOX
UNLESS THlS FIREBOX MEETS THE MINIMUM
DIMENSIONSREQUIREDFORTHEINSTALLATION.
IMPORTANT: READ THESE INSTRUCTIONS
CAREFULLY BEFORE STARTING
INSTALLATION OF THIS FIREPLACE.
Donotstoregasolineorotherammablevaporsandliquidsinthevicinityofthisoranyotherappliance.
Thisapplianceisonlyforusewiththetype
ofgasindicatedontheratingplate.This
applianceisnotconvertibleforusewith
othergases,unlessacertiedkitisused.
Installer:Leavetheseinstructionswiththeconsumer.
Consumer:Retainforfuturereference.
ReportNo.08-154
ICCEvaluationServices
ReportNo.2401
FireplacePartsDiagram.........................................................................................Pg.2
FireplacePartsList.................................................................................................Pg.3
GeneralInformation................................................................................................Pg.4
SafetyInformation................................................................................................... Pg.5
Location...................................................................................................................Pg.6
SupportingFloorSystems....................................................................................... Pg.6~7
GrandMeridianWeightDeterminations.................................................................. Pg.8
Clearances.............................................................................................................. Pg.9,10
AirforCombustionandVentilation.......................................................................... Pg.10,11
ImportantPre-installationInformation..................................................................... Pg.12
FireplaceAssemblyProcedures..............................................................................Pg.13~15
GasPipingInstallation............................................................................................Pg.15
ElectricalLineFeed................................................................................................. Pg.15
FirebrickLinerInstallation....................................................................................... Pg.16
InitialFireplaceOperation....................................................................................... Pg.16
TechnicalService....................................................................................................Pg.16
ReplacementParts.................................................................................................. Pg.16
AppendixI............................................................................................................... Pg.17
AppendixII.............................................................................................................. Pg.18
WarrantyInformation............................................................................................... Pg.19
CONTENTS
2.625”
6.500”
.125”
.125”
Refer to installation instructions and check local codes prior to installing. This appliance must be installed in accordance
with local codes if any. Otherwise, in accordance with the National Fuel Gas Code ANSI Z223.1 installation codes.
P/N MFP170 OCT2009
COMPLIES WITH ANSI Z21.91-2007, VENTLESS FIREBOX ENCLOSURES FOR GAS-FIRED UNVENTED DECORATIVE ROOM
HEATERS. FOR USE WITH LISTED ANSI Z21.11.2 UNVENTED DECORATIVE ROOM HEATERS, NOT TO EXCEED 40,000 BTU/HR.
0" - 10" : NO PROJECTIONS
10" - 16" : 1½" MAX. PROJ.
16" - 22" : MAX. PROJ.
22" & ABOVE : 10" MAX. PROJ.
DISTANCE FROM SIDE OPENINGS
3" MIN. : 1¾" MAX. PROJ.
MANTEL CLEARANCES
2701 S. Harbor Blvd.
Santa Ana, CA 92704
THIS APPLIANCE NEEDS
FRESH AIR FOR SAFE
OPERATION AND MUST
BE INSTALLED SO
THERE ARE PROVISIONS
FOR ADEQUATE
COMBUSTION AND
VENTILATION AIR.
DO NOT REMOVE THIS LABEL
MODEL No.:
MM44VF MM49VFMM39VF
SERIAL No.
DATE OF MFG:
BOTTOM
0"
2"
42"
18½"
TOP,
BACK &
SIDES
OPENING
TO CEILING
CLEARANCES TO COMBUSTIBLES
RECESS
DEPTH
PFS
®
US
7. HOLES: 4X Ø.125” THRU
6. CLEAR BOXES NEXT TO MODEL NUMBERS ARE TO BE STAMPED DURING MANUFACTURE OF FIREPLACE.
5. LARGE TEXT TO BOLD UPPERCASE ARIAL, 10 PT. MIN. (WHERE SHOWN).
4. SMALLEST TEXT TO BE ARIAL, 8 PT. MIN (WHERE SHOWN).
3. ALL TEXT AND GRAPHICS TO BE BLACK ON A CONTRASTING, CLEAR ALUMINUM BACKGROUND.
2. FINISH: CLEAR MYLAR TO BE APPLIED ON TOP SURFACE.
1. MATERIAL: CLASS IIIA , .024 THICK ALUMINUM RATED AT 302°F (150°C).
NOTES: UNLESS OTHERWISE SPECIFIED
DESCRIPTION: PLATE, RATING VF
PART NUMBER: 125122-01
REV: A
DATE: 11/3/2009
LAST MODIFIED BY: CHRISTI
Doc File Name: 125122-01.ai
Belowisasamplepictureoftheratingplatethatislocatedinsidethelowerdomesideofyourreplace.ModelNumber,Dateof
ManufactureandSerialNumbershouldbestampedontheplatewhereindicated.
2
Fireplace Parts Diagram
Figure 1
Exploded Diagram
5
9
12
2
7
1
3A
2X
2X
3X
7X
2X
8X
3
6
11
WARNING
Failure to position the parts in
accordance with these diagrams or
failure to use only parts specically
approved with this appliance may result
in property damage or personal injury.
3
Optional Outside Ø4”
Combustion Air Kit
Model No.: MM4AK
(Ø4” Ducting not included)
Refractory Firebrick Liners
(HerringbonePatternshown,alsoavailable
inRunningBond-seePg.16)
MM(39,44,49)SHBL- Herringbone
MM(39,44,49)FRBL- Running Bond
MM39/44/49VF Fireplace Parts List
ITEM P/N DESCRIPTION
QTY
1
MFP39-1
MFP44-1
MFP49-1
HEARTH(LeftorRight)
2
2
MFP39-2
MFP44-2
MFP49-2
REARWALL
4
3
MFP39-3
MFP44-3
MFP49-3
SIDEWALL
7
3A
MFP39-3A
MFP44-3A
MFP49-3A
SIDEWALLwith4”holeforAirKit
1
5
MFP39-5
MFP44-5
MFP49-5
DOMEREAR-LOWER
1
6
MFP39-6
MFP44-6
MFP49-6
LINTEL
1
7
MFP39-7
MFP44-7
MFP49-7
DOMESIDE-LOWER
2
9
MFP39-9
MFP44-9
MFP49-9
DOMETOP
1
11
125122-01
RATINGPLATE
1
12
#3REBAR(Ø3/8”)x36”
8
4
General Information
Introduction
WeextendawarmwelcomefromallofusatFMI
PRODUCTS,LLCproudmanufacturersoftheGrandMeridian
Fireplaces.
ThankyouforChoosingFMIPRODUCTS,LLC.
Youmayhavethoughtlongandhardbeforeyouchosethe
replacewhichwouldgraceyourhome.Restassuredthat
everycomponentoftheFireplacehasbeentestedtoensure
long-termdurability.
Before Beginning the Installation
Readtheseinstructionscarefullybeforebeginningthe
installationofthisVent-Freereplace.Alsoreadthegas
logappliancemanufacturer’sliteratureregardingsizingand
suitabilityforinstallationintothisEnclosurepriortoinstallation.
Statement of Intended Use:
TheGrandMeridianVent-FreeUniversalMasonryFireplaceis
amodularrefractorymasonryunitdesignedforeldassembly.
Thereboxisconstructedusingpre-cast,interlocking
refractoryblocks.Theblocksarethensecuredtoeachother
usingMortar.Thesystemincludesallpartsnecessaryforthe
assemblyofacompletemasonryvent-freedecorativegaslog
enclosure.
Inadditiontothebasicenclosure,astandard
1-1/8”thick,hightemperaturerefractorybrickis
requiredtolinetheinterioroftherebox.
Thesereplacesarenotintendedtoserveas
aprimaryheatsource,rather,thereplacewas
expresslycreatedasasupplementalsourceof
heat.
TheGrandMeridianFireplaceisDesignedfor
UseOnlywithanyVentfreedecorativegaslog
setsmeetingstandardANSIZ21.11.2
Ventfreedecorativegaslogsetsmeeting
standardANSIZ21.11.2,aresuppliedbyothers
andarelimitedtoanylistedvent-freegas-red
logsetswithheatinputratingsupto40,000Btu/
hr.
WARNING:Anyapplicationotherthanthe
“IntendedUse”asstatedaboveisinviolation
ofthemanufacturer’sinstructionsandishereby
prohibited.Suchviolationmaycauseimmediate
hazard,propertydamageorlossoflifeandwill
voidallliabilitiestothemanufacturerandwill
voidallwarrantiesexplicitorimplied.
Product Overview
GrandMeridianreplacesaredesignedasFactoryBuilt-Field
AssembledFireplacestobeinstalledonbothcombustibleand
non-combustibleoorsystems.Theyhavebeenextensively
testedtoperformwithexcellentresultsinthisenvironment.
Attention:Beadvisedthatalltheillustrationsinthismanual
areforgeneralreferenceonly.Theyarenotdrawntoscale.
Actualdesignelementswillvaryfromcasetocase.Pay
attentiontospeciedminimumclearancesastheyrelateto
combustiblematerials.
SECTION A-A
W1
W3
W2
231/8"
28"
383/4"
463/4"
71/8"
21"
41/2"
325/8"
A
A
Figure 2
Model W1 W2 W3
MM39VF 43” 39” 29-1/4”
MM44VF 48” 44” 34-1/4”
MM49VF 53” 49” 39-1/4”
OUTSIDEAIRACCESS
5
Safety Information
Carbon Monoxide Poisoning:Earlysignsofcarbonmonoxide
poisoning resemble the u, with headaches, dizziness, or
nausea. If you have these signs, the replace may not be
working properly. Get fresh air at once! Have the replace
serviced.
Note:Some peopleareaffectedmorethan othersbycarbon
monoxide. These may include pregnant women, people with
heartorlungdisease,areanemic,anyoneundertheinuence
ofalcohol,andthoseathighaltitude.
IMPORTANT:Readthisownersmanualcarefully
andcompletelybeforetryingtoassemble,operate,
or service this replace. Improper use of this
replace can cause serious injury or death from
burns,re,explosion,electricalshock,andcarbon
monoxidepoisoning.
General Safety Concerns
1. Ifyousmellgas
Shutoffgassupply.•
Donottrytolightanyappliance.•
Donottouchanyelectricalswitch;donotuseany•
phoneinyourbuilding.
Immediatelycallyourgassupplierfromaneighbor’s•
phone.Followthegassupplier’sinstructions.
Ifyoucannotreachyourgassupplier,callthere•
department.
2. Thisreplaceshallnotbeinstalledinabedroomor
bathroom.
3. Neverinstallthereplace
Inarecreationalvehicle.•
Wherecurtains,furniture,clothing,orotherammable•
objectsarelessthan36inchesfromthefront,top,or
sidesofthereplace.
Inhightrafcareas.•
Inwindyordraftyareas.•
4. Donotusethisreplaceasawood-burningreplace.
5. Donot add extralogsor ornaments suchaspine cones,
vermiculite, or rock wool. Using these added items can
causesootbuild-up.
6. Thisreplaceisdesignedtobesmokeless.Iflogsappear
tosmoke,turnoffreplaceandcallaqualiedservice
person.
7. Avoid any drafts that alter burner ame patterns. Do not
allowfanstoblowdirectlyintothereplace.Donotplace
ablowerinsideburnareaoftherebox.Ceilingfansmay
createdraftsthatalterburneramepatterns.Sootbuild-up
andimproperburningwilloccur.Sootbuild-upcansettleon
householdsurfacesoutsidethereplace.
8. Thisreplaceneedsfreshairventilationtorunproperly.
TheVentfreedecorativegaslogsetmusthavean
oxygendepletionsensor(ODS)pilotlightsafetysystem.
TheODSshutsdownthereplaceifnotenoughfresh
airisavailable.SeeAirforCombustionandVentilation,
page8.Ifthereplacekeepsshuttingoff,seeappliance
manufacturers’troubleshootinginstructions.
9. Donotrunreplace
Whereammableliquidsorvaporsareusedorstored.•
Underdustyconditions.•
10. Donotusethisreplacetocookfoodorburnpaperor
otherobjects.
11. Neverplaceanyobjectsinthereplaceoronlogs.
12. Fireplacescreensmustbeprovidedandaretobeclosed
beforeoperatingthedecorativeroomheater.Ifdoorsare
installed, they must be open during operation. Fireplace
frontandscreenbecomeveryhotwhenrunningreplace.
Keepchildrenandadultsawayfromhotsurfacestoavoid
burns or clothing ignition. The replace will remain hot
for atime after shut down.Allow surfaces to coolbefore
touching.
13. Carefullysuperviseyoungchildrenwhentheyareinthe
roomwiththereplace.
14. Do not use replace if any part has been exposed to or
underwater.Immediatelycallaqualiedservicetechnician
toinspectthereplaceandtoreplaceanypartofthecontrol
systemandgascontrolwhichhasbeenunderwater.
15. Do not operatethe replace if any log is broken.Do not
operate the replace if a log is chipped (dime-sized or
larger). Verify proper log placement prior to operating
appliance.
16. Turn replace off and let cool before servicing. Only a
qualied service person should service and repair the
replace.
17. Operatingthereplaceaboveelevationsof4,500feet
maycausepilotoutage.
DO NOT USE OR STORE GASOLINE OR OTHER
FLAMMABLE LIQUIDS OR GASES IN OR NEAR THE
FIREPLACE!
ATTENTION:Areoranexplosioncouldoccurcausingproperty
damage,injuryorlossoflifeifyoudonotfollowtheinformation
inthismanual!
NOTE: THIS MANUAL MUST BE REPRODUCED ONLY IN
ITS ENTIRETY.
Carefullyreviewtheinstructionssuppliedwiththedecorative
type unvented room heater for the minimum rebox size
requirement.
DO NOT INSTALL THE APPLIANCE IN THIS
FIREBOX UNLESS THIS FIREBOX MEETS THE
MINIMUM DIMENSIONS REQUIRED FOR THE
INSTALLATION.
When choosing a location for your replace, avoid locations
thataresubjecttotoomuchdraftorlocationswhereyoumay
encounterobstructionsthatmaybeinthewayofthereplace
onceinstalled.Alwayschecklocalcodesandfamiliarizeyourself
withthesurroundingconstruction.
DANGER:
Carbon monoxide poisoning may lead to
death!
6
Location
Note:Youmayneedtoprovidecombustionandventilationair
from an outside source to adequately satisfy local codes so
avoidinstallingacombustionairinletwheretheopeningcould
beblockedbysnow,bushesorotherobstacles.Notethatthe
accessforoutsideairinletislocatedontherighthandsideof
thereplace.
Internal
Wall
Installation
Full
Projection
Installation
Flush
Installation
Corner
Installation
Figure 3
A ush installation is recommended where living space is
limitedoratapremium.Checklocalcodesforanyrestrictions.
W
H
D
Figure 4
Model W H D
MM39VF 43” 41” 28”
MM44VF 48” 41” 28”
MM49VF 53” 41” 28”
Projected installationscanextendanydistanceintotheroom.
A projection may be ideal for a new addition on an existing,
nishedwall.
Corner installationsmakeuseofspacethatmaynotnormally
beusedandprovidesawiderandmoreefcientrangeforheat
disbursement.
An internal wall installation provides a discreet option for
room separation and can also be ideal as an addition to an
existingwall.
IMPORTANT:Vent-freeheatersaddmoisturetotheair.Installing
areplaceinroomswithoutenoughventilationairmaycause
mildewtoformfromtoomuchmoisture.
IMPORTANT:Makesurethereplaceislevel.Ifthereplaceis
notlevel,thelogsetwillnotworkproperly.
Attention:YoumayneedabuildingpermittoinstallaGrand
Meridianreplace.Checkwiththelocaljurisdictionbeforeyou
getstarted.
Supporting Floor Systems
Floor Framing
Itisimportanttotakeintoconsiderationthattheloadforthe
GrandMeridianFireplaceisconsiderable,but,moreimportant,
thatitisadeadloadthatwillhavetobeabsorbedbyarelatively
smallamountofexistingoorspace.
It is the ultimate responsibility of the installer to ensure that
properconcreteslabsupportsareused.
WARNINGtothelicenseddesignprofessionaland/orbuilding
contractor:ItisyourresponsibilitytobecertainthattheGrand
Meridian can be properly supported by the combustible oor
systemonwhichthereplacewillrest.
Forreplacesupportfoundationsinstalledonconcretereferto
AppendixIandII(pages 17 & 18)forspecicinstructions.
Rebar locations
Lay-out the position of the replace and drill holes where
therebarwillbelocated.Securethe#3rebar4inchesintothe
concretefoundationwithITWEpoxyorSimpsonEpoxy.Follow
manufacturer’sinstructionsforinstallationofrebarintoslab.
Wood Floor
Anchorageofreplacetowoodoorconstructionisrequired.
RefertoFigure 8foranchoragedimensions.Fouranchorsare
requiredtoattachtothesub-ooringframing.
Crawl Space or Upper Floor:
Forinstallationofreboxovercombustiblecrawlspacesor
upperoors,anchorageofthereboxisrequired.Illustrations
of examples of possible anchorage methods are shown in
Figures5thru7dependinguponthetypeofoorframing.Final
methodof anchorageisto bedeterminedby licenseddesign
professional.
7
Forconventionalframing,wheretheoorjoistsareparallel
withthesidesoftherebox,theadditionofoorjoiststoalign
with the anchor brackets allows the brackets to be directly
connectedtotheoorjoists.
Notethat additionaloor joistsmay berequiredto support
theweightofthereboxandchimney.Wheretheoorjoistsrun
paralleltothefrontoftherebox,anchoragecanbeaccomplished
inlikemannerasshowninFigure5usingblockingbetweenthe
oorjoist.
ForoorssupportedbyI-Joists,themethodofanchorageis
illustratedinFigures6and7.Figure10illustratesthegeneral
arrangementofanchoragetooorframing.
Itisimportanttotakeintoconsiderationthattheloadforthe
Grand Meridian Fireplace must be considered as additional
deadloadthatwillhavetobesupportedbytheoorframing.
AdditionaloorjoistsorI-joistsmayberequiredasdetermined
bythelicenseddesignprofessional.
ThedeadweightsforthereplacearenotedinTableI.Itis
thetaskandresponsibilityofthegeneralcontractor/installerto
seethattheproperreinforcementforweightloadsaremadeby
alicenseddesignprofessionalpriortothereplaceinstallation.
As statedabove, it isdesirable to place additionalframing
foralignmentofanchorrods.RefertoFigure10foranchorrod
locations.
Figure 5
FloorSheathing
notshownfor
clarity
Anchor Bracket
Assembly
EXAMPLE ONLY
2X FLOOR JOIST
2X FLOOR JOIST
A35Brackets
(16required)
I-Joist
Simpson
Strong-Tie
A-35 or
equivalent
Figure 6
I-JoistAnchoring
TopView
Example Only
I-JOISTS
Anchor
Brackets
Figure 7
I-Joist
Anchoring
Bottom
View
Example Only
8
Grand Meridian Weight Determinations
ThefollowingaredeadloadweightestimatesfortheGrandMeridianFireplace.
Table I
FireplaceModel
MM39VF MM44VF MM49VF
FireplaceWeight
809lbs. 896lbs. 987lbs.
Mortar,Rebar&
ReadyMixConcrete
350lbs. 357lbs. 364lbs.
FirebrickLining
333lbs. 345lbs. 356lbs.
FloorArea
43”x28”(8.12ft²) 48”x28”(9.33ft²) 53”x28”(10.30ft²)
Other Weight Considerations:
Fireplacenishedfacing(surround):Thisinformationneedstobeobtainedfromthecontractor.
Table II - Deection Limits
Construction L S or W D +L1
FloorMembers
I/360 --- I/240
1
For woodstructural membershavinga moisturecontent oflessthan 16per centattime ofinstallation andusedunder dry
conditions,thedeectionresultingfromL+0.5DispermittedtobesubstitutedforthedeectionresultingfromL+D.
NotethatFMIPRODUCTS,LLCcannotacceptresponsibilityforstructuraloorsupportdetails.Alldrawingsarepresentedas
mereillustrationstoindicatethepresenceoftheunderlyingoorsystem.Itistheresponsibilityofthegeneralcontractor/installer
toconsultwithalocallicenseddesignprofessionalforguidanceinbuildingaproperoorsupportsystem.
F
10"
4"
Figure 8
A
Model A
MM39VF 38-3/4”
MM44VF 43-3/4”
MM49VF 48-3/4”
Figure 9
Fireplace
outline
10”
Typical Anchorage
Layout
EXAMPLE ONLY
SECTION VIEW
ROTATED 90CW
Figure 10
9
Clearances
The Importance of Clearances
Warning to thestructural engineer and/orbuilding contractor:
It is your responsibility tobe certain that the Grand Meridian
Fireplacecan beproperly supportedby the combustibleoor
system on which the replace will rest. Be advised that this
engineering equation will be in addition to any live or dead
weightsthattheoorhastocarry.
Clearances to Combustibles
Nothing is more important than paying strict attention to
giving clearance between replace surfaces and surrounding
“combustibles”themostcommonofwhichare:
Drywall•
Woodooring•
Plywoodsub-ooring•
Framingmaterials•
Particleboard•
Millboard•
Plywoodpaneling•
Required Clearances are:
Unitfront,sides,rear:..........................................0"
CombustibleFloor:.............................................0"
CombustibleSheathingaboveopeningtop:....... 8"(200mm)
Sheathingortrimtoopeningsides:....................8"(200mm)
Mantleaboveopening:.......................................12"(300mm)
Openingtosidewall:...........................................24"(500mm)
Insulationfromrebox:.......................................0"
The Grand Meridian Vent-Free replacemay be installed
at “zero clearance” to plywood sheathing and to uninsulated
woodframingmembersattheunitbottom,sides,rearandtop
whenusedforenclosinganylistedvent-freegas-redlogset
withmaximumheatinputratingsupto40,000Btu/hr.However,
whenaVent-Freereplaceistobeinstalledoncarpeting,wood
ooring,oranycombustiblematerialotherthantileorconcrete,
the Vent-Free replace shall then be installed on a metal or
woodplatformextendingthefullwidthanddepthoftheVent-
Freereplace.
Clearance to Combustible Trim:
Grand Meridian Vent-Free Fireplaces are designed to be
custom nished with facing trim and mantle to be an owner
option. However, all such trim material must meet standard
replacecoderequirements.
Non-combustible facing material must be applied to a
minimumofeightinches(8”)beyondthesidesofthenished
openingoftheVent-Freereplaceandnon-combustiblefacing
material mustcover aminimum oftwelve inches(12”) above
thenishedopeningoftheinstalledunit.
Figure 11
1-1/2”
8” MIN
NON-
COMBUSTIBLE
FACIA
Figure 12
1-1/2”
12” MIN
NON-COMBUSTIBLE
FACIA
Clearancetocombustibletrimarethosedistancesrequired
toensurethatcombustiblemantleandfacingmaterialwillnot
beexposedtoexcessiveheatwhiletheunitisoperating.
These clearances should be adequate to prevent
discolorationorwarpingoftrimfacingsduetoheat.However,
circumstancesuniquetoeachinstallationcreatevariablesthat
may be beyondthe scope of this manual.Therefore be sure
tofollow gaslogappliance manufacturers explicitinstallation
instructions regarding all minimum trim facing, mantle height
andsidewallclearancerequirements.
Figure 13
Parts of the combustiblemantle assembly located above
and projecting more than one and one-half inches (1-1/2”)
inches from the rebox opening shall bekept at least twelve
inches(12”)fromthetopoftheopening.
Mantleshelveswithhorizontalprojectionofteninches(10”)
fromthefaceofthereplacemustbeheldtoaminimumvertical
distance of twenty inches (20”) from the top of the nished
replaceopening.
Note: Mantle height clearances may vary among gas log
appliancemanufacturersorwiththeuseofreboxcanopies.
Be sure to follow the gas log appliance manufacturer’s
explicit installation instructions for mantle height clearance
requirements.
10
Interior Wall Materials:
Wall materials, such as drywall, should be set ush with
theroughfrontfaceoftheVent-Freereplace.Thiswillallow
forplacementofrequirednon-combustiblesurroundmaterialin
suchawaythatthesurroundmaterialcanlayatagainstthe
nishedwallsurfaceandalsoalignwiththeleadingedgeofthe
rebrickinterioroftheVent-Freereplace(seeFigure 15).
Trim Facings:
Parts of the combustible mantle assembly located along
thesidesofthereboxopening,whichprojectmorethanone
andone-halfinches(1-1/2”)fromthefaceofthereplace,shall
bekeptatleasteightinches(8”)fromthereboxopening.
Adjoining Room Walls:
Interior wall surfaces of adjoining room walls must be at a
minimumhorizontalmeasureoftwentyfourinches(24”)away
fromthenishedopeningoftheVent-Freereplace.
D1
W
1-1/2”
8”MIN.NON-COMBUSTIBLEMATERIAL
FRAMING
Figure 14
Model W D1
MM39VF 43” 73-1/2”
MM44VF 48” 77”
MM49VF 53” 80-1/2”
1-1/2”
8”MIN
20”
MIN
8”MIN.NON-COMBUSTIBLEMATERIAL
FRAMING
Figure 15
Air for Combustion and Ventilation
Energyefcienthomesrequirehomestobeairtightbutatthe
same time provide sufcient fresh air to breathe. Fresh air
enters the home through air conditioning duct vents, around
doorsandwindowsbutalsomustprovideenoughfreshairfor
propercombustiononallfuel-burningappliancesinthehome.
Exhaust fans, replaces, clothes dryers, and fuel-burning
appliancesdrawairfromthehousetooperate.Youmustprovide
adequatefreshairfortheseappliances.Thiswillinsureproper
ventingofventedfuel-burningappliances.
Non-combustible
FlexHose
Figure 16
Exterior
Providing Adequate Ventilation
InaccordancewiththeNationalFuelGasCodeNFPA54/ANSI
Z223.1, Section 5.3, Air for Combustion and Ventilation, all
spacesinhomesfallintooneofthethreefollowingventilation
classications:
1.UnusuallyTightConstruction
2.UnconnedSpace
3.ConnedSpace
Thefollowinginformationwillhelpyouclassifyyourspaceand
provideadequateventilation.
Unusually Tight Construction
Theairthatleaksarounddoorsandwindowsmayprovide
enough fresh air for combustion and ventilation. However,
in homes of unusually tight construction, you must provide
additional fresh air.Unusually tightconstruction isdened as
constructionwhere:
a.Wallsandceilingsexposedtotheoutsideatmospherehave
acontinuouswatervaporretarderwitharatingofoneperm*
orlesswithopeningsgasketedorsealedand...
b.Weatherstrippinghasbeenaddedonopenablewindowsand
doorsand...
c. Caulking or sealants are applied to areas such as joints
aroundwindowanddoor frames,between sole platesand
oors, between wall-ceiling joints, between wall panels, at
penetrations for plumbing, electrical, and gas lines, and
otheropenings.
*Apermisaunitofpermeanceorwatervaportransmission,
theUSperm-inchisdenedasthepassageof1grainofvapor
through1squarefootof1inchthickmaterialin1hourundera
pressuredifferenceof1inchofmercury.
Ifyourhomemeetsallthethreecriteriaabove,youmustprovide
additionalfreshair.
11
Unconned Space
An unconned space has a minimum total air volume of
50 cu.ft. (cubic feet) for each 1,000 Btu/Hr input rating of all
appliances inthe totalspace (cu.ft.= lengthx widthx height
of space). Include adjoining rooms only if there are doorless
passagewaysorventilationgrillsbetweentherooms.IftheBtu
per 50 cu.ft. is less than 1,000 Btu/Hr, then fresh air will be
providedbythenaturalairowintothehouse.
Conned Space
Aconnedspacehasanairvolumeoflessthan50cu.ft.for
each1,000Btu/Hrinputratingofallappliancesinthespace(cu.
ft.=lengthxwidthxheightofspace).Includeadjoiningrooms
only if there are door less passageways or ventilation grills
betweentherooms.
Determining Total Air Volume
Use this work sheet to determine if you have a conned
orunconnedspace.Thespacetobeconsideredincludesnot
onlytheroominwhichyouwillinstallthereplacebutalsoany
adjoining rooms with ventilation grills between them or door
lesspassageways.
1. Determinethetotalvolumeofyourspace
LxWxH=_______cu.ft.
Example:Spacesize=20ft.longx20ft.widex8ft.high
(ceilingheight)=3,200cu.ft.
If adjoining ventilation to adjoining room is supplied with
grillsoropenings,addthevolumeoftheseroomstothetotal
volumeofthespace.
2. Divide the space volume by 50 cu.ft. to determine the
maximumBtu/Hrthespacecansupport.
_______cu.ft.(volumeofspace)
50cuft.=(MaximumBtu/Hrthespacecansupport)
Example:3200cuft.(Volumeofspace)/50cu.Ft.=64.0or
64,000(maximumBtu/Hrthespacecansupport.)
3. AddtheBtu/Hrofallfuelburningappliancesinthespace.
Vent-freereplace _______ Btu/hr
Gaswaterheater* _______ Btu/hr
Gasfurnace _______ Btu/hr
Ventedgasheater _______ Btu/hr
Gasreplacelogs _______ Btu/hr
Othergasappliances* _______ Btu/hr
Total= _______ Btu/hr
Example: Gaswaterheater40,000Btu/hr
Vent-freereplace+36,000Btu/hr
Total=76,000Btu/hr
*Donotincludedirect-ventedgasappliances.Directventdraws
combustionairfromtheoutdoorsandventstotheoutdoors.
4. ComparethemaximumBtu/Hrthespacecansupportwith
theactualamountofBtu/Hrused.
_________Btu/Hr(maximumthespacecansupport)
_________Btu/Hr(actualamountofBtu/Hrused)
Example:
64,000Btu/Hr(maximumthespacecansupport)
76,000Btu/Hr(actualamountofBtu/Hrused)
Thespaceinthepreviousexamplewasaconnedspace
becausetheactualBtu/Hrusedwasmorethanthemaximum
Btu/Hrthespacecouldsupport.IfyoundyouhaveaConned
Space,youmustprovideadditionalfreshair.Youroptionsare
asfollows:
a)Re-workworksheet,addingthespaceofanadjoiningroom
thatmaynothavequaliedfortheextravolume.Iftheextra
space provides enough volume to convert the area to an
unconned space, remove door to adjoining room or add
ventilationgrillsbetweenrooms.
b)Ventroomdirectlytotheoutdoors.
c) Install a lower Btu/Hr gas log (if lower Btu/Hr size makes
roomunconned).
IftheactualBtu/HrusedislessthanthemaximumBtu/Hrthe
spacecansupport,thespaceisanunconnedspace.Youwill
neednoadditionalfreshairventilation.
WARNING: If the area in which the heater may be operated
is smallerthan that denedas an unconnedspace, provide
adequatecombustionandventilationairbyoneofthemethods
describedintheNationalFuelGasCode,ANSIZ223.1Section
5.3orapplicablelocalcodes.
Local codes may have stricter denitions for conned space
and/or for unusually tight construction. Installing our optional
outsideairkitmayallowthespacetobeclassiedasnotbeing
unusuallytightorbeinganunconnedspace.Checkyoulocal
codes.
IMPORTANT: Do not provide openings for inlet or outlet air
intoanatticiftheattichasathermostat-controlledpowervent.
Heatedairenteringtheatticwillactivatethepowervent.
12
Important Pre-installation Information
Overview
YouwillndthattheGrandMeridianFireplaceisdesignedfor
completeassemblyatyourconstructionsitewithallnecessary
itemsdeliveredconsistingofinterlockingprecastparts,50lbs.
ofmortarandrebar.
Thepartsofthereplacearemadeofincrediblystrongblendof
specialtycementandalightweightaggregate.
Thedesignofthereplacecallsfortheinstallationofarefractory
rebrickliner.This should be a minimum of 1-1/8”thick.The
liner will be applied within the walls of the rebox. Modular
rebrickpanelsarealsoavailablefromFMIPRODUCTS,LLC.
Additional Materials Required:
1)Ready-Mixconcrete-2cu.ft.
SURFACE CRACKS-TheGrandMeridianFIREPLACESare
manufactured using high quality materials. During the drying
process,surfacecrackingmayoccur.Thesesmallcracks(under
1/16”willnotaffectthereplacesafetyorperformance).During
the assembly process,ll surface cracks with thin-set mortar
andbrushwhendryingforasmoothsurfacenish.
Leveling and Aligning Components:
ItisimportanttoassembleallVent-Freereplacecomponents
ush, level and square. Since it is not intended that mortar
beusedtolay a mortarjoint of anymeasurable thickness as
istypical when laying brick or concrete block, adjustmentsin
componentheightandlevelalignmentsareaccomplishedwith
theuseofsmallshims.Theseshimscanbetappedintoplaceto
levelandaligncomponents.OncetheMortarisset,theshims
mustberemovedcompletely.
Besuretore-groutanyandallgapswhereshimshavebeen
inserted and then removed or where contact surfaces have
beenseparatedbyshimleveling.
Field Assembly Procedures
1) Mixingthemortar–Youwillrequirea50lb.bucketofmortar
whichwillbemorethanenoughtoadequatelyafxallthe
replacecomponents,onetothenext.Themortarispremixed
anddryandistobeusedtoadhereallthereplacecomponents.
Besuretousecleanwaterandworkitupintoamixturethat
ispastybutnotlumpy.Ifitistoothin,thecomponentswill
notadhere.Sometrialanderrormaybenecessary.Youwill
wanttoapplythemixturewithastandardgroutbag.
2) Moisten all surfaces which will have grout applied prior
to assembly. This will minimize shrinkage and cracks
developinginthejointareas.Bestwaytoaccomplishthisis
withabucketofwaterandalargesponge.Dipspongeinto
waterandapplyaliberalamountofwatertothegroutjoint
surfaceseveralminutesbeforethepartistobeassembled.
Thewaterwillabsorbintothesurfaceallowingthegroutto
properlycure.
3)Assembly of the Components – Onceyou have found the
properconsistencyofthemixture,loaditintothegroutbag
andthenplacethecomponentstogetherapplyingthemixture
directlytothecomponentswheretheycometogether.Asa
rule,youcangurethatyoushouldlaydownabout½”(one-
halfinch)ofathreadofmortar.Thelineofmortarshouldbe
approximately½”(one-halfinch)awayfromalltheedgesof
eachseparatecomponent.
Themortarhasaconsiderableamountofholdingpowerso
donotoverloadthecomponentswithtoomuchmortar.
4)You will notice that some mortar will “ooze out” when you
placethenextcomponentontopofornexttothecomponent
youpreviouslyplace.Thisistobeexpected–itmeansthe
two pieces have properly bonded -- and you will want to
swipethe excess awaywitha trowel.It isnever intended
thatthesurfaces ofthecomponentsare tobecompletely
coveredwithmortar.
5) Donotapplythemortarinthickbandsevenifthecomponent
youareworkingwithislargerthantherest.Youwillwantto
apply“stripes”ofmortarinthesesituations.
6) Making Sure Components Are Level – It is extremely
important that you pay careful attention to how you are
assembling the replace. Since every component builds
on thenext, itis critical, thatfrom thebeginning, you are
checkingthatthecomponentsarettingtogethertobelevel
andush.Ifyouhavetomakeanykindofanadjustment,
donottrytodoit“byloadinganopening”withmortar.That
iscompletelyunacceptable,resultinginareplacethatwill
notbeplumborlevel.Whatyouareadvisedtodoismake
useofshims.Youwillndthesesuppliedwiththereplace
andyoucannudgetheminbetweenopeningstoachieve
theprecisionyouneedinmakingcomponentadjustments.
7) Onceyouhaveremovedtheshims,youwillwanttocover
anygapsthatmayhaveresultedwiththegrout.
Warning:Allsurfaceswheregroutisappliedmust
have water sponged on several minutes prior to
assembly.Thiswillminimizecrackingofgroutjoint
andprovidemaximumstrength.
13
Fireplace Assembly Procedures
TOOLS NEEDED FOR INSTALLATION:
One4ft.level•
Roto-hammerwith½”drillbit•
DrillmotorwithmixerbladetomixMortar•
Twoempty5gallonbucketstomixMortar•
Onewheelbarrow• andshoveltomixconcrete
Groutbag•
Triangularmasonrytrowel•
Rubberhammer•
Spongeand2waterbucketstowipedownandmoisten•
partspriortoapplyingmortar
MATERIALS NEEDED FOR INSTALLATION:
Epoxyforsecuringrebarinfooting/foundation•
Three(3)-90lb.bagsofreadymixconcretewith¼”or•
smalleraggregate
MATERIALS INCLUDED:
8-⅜”Rebarx28”Long•
8-⅜”Rebarx12”Long•
1-50lb.bucketMortar•
20-SmallWoodShims•
Note-Wipeexcesswaterfromsurfacepriortoapplyinggrout.
Thiswillhelpgrouttoadheretosurfaceduringassembly.
Warning:Allsurfaceswheregroutisappliedmusthavewater
spongedonseveralminutespriortoassembly.Thiswillminimize
crackingofgroutjointandprovidemaximumstrength.
PlacetheGrandMeridianFireplacehearthbaseontopofyour
non-combustible oor. For concrete slabs, supporting oor
needstoberatedatASTM90.
Drawanoutlineofthehearthareabasedonthedimensions1)
showninFigure 17.PositionHearthslabsandmarkrebar
centerlocations.Drill4inchesintoconcreteslabandsecure
the8piecesof12inchrebarwithepoxy.
Figure 17
LeftSideHearth2nd
RightSideHearth1st
Model W
MM39VF 43”
MM44VF 48”
MM49VF 53”
W
28”
Applymortar
betweenjoints
12inchrebar
MixabatchofmortarandprepareRightSideHearthbottom2)
surfacetobebondedasshowninFigure 18.
Figure 18
1/2”AWAY
FROMEDGES
1/2”MORTAR
BEADTYPICAL
Hearthsectionshownprepared
forRightSideposition
APPLYMORTAR
BEADTOALL
MATINGSURFACES
AlignRightSideHearthtotheoutlinecreated.Theoverall3)
widthshouldallowforanapproximategapof1/8”between
slabsfortheadditionalmortartounitetheremainingslab.
Checkforsurfaceatness,levelifnecessary.
ApplymortartotheremainingHearthexceptthistimeapply4)
beadingonsurfacetobefacingoorasshowninFigure
19.
Figure 19
Hearthshownprepared
forLeftSideposition
Before installingside walls, conrm placementof outside5)
combustion air access (if required), this can be installed
eithersidedependingonwhichsideisaccessibletooutside
combustion air (all diagrams in this manual show the
combustion air inlet hole onthe right side). Prepare side
wallandrearwallmatingsurfaceswiththepreparedmortar
andbeginassembly.
Figure 20
Side Wall shown prepared for Right Side Air
Access.ForLeftSidebeadoppositeside.
1/2”AWAY
FROMEDGES
Keeptheassemblyofthenextsectionsofthereboxside6)
wallsmovingup,keepingcomponentsmoist,mixingmortar
as youneed itand threading themortar appropriately as
youstackeachsection,oneontothenext.Constantlycheck
forsquarenessandlevelnesswhilebuildingeachcourseof
block.Asyoucompleteeachsection,makecertainthatyou
adherethemortarateachandeveryjoint.
14
Figure 21
CombustionAirAccess
RightorLeft(Rightshown).
Apply
mortar
Applymortar
SideWall
RearWall
SideWall
When you have arranged all the components into place7)
and you are working on the top rear rebox, check that
your work is level. If you need to, you can make some
adjustments in the top surface of the box assembly
simply by using shims. Once you are satised with the
degree of levelness, you can address any gap that may
have occurred with an appropriate amount of mortar.
Although you are cautioned to use mortar sparingly
because it does have such holding power, you should
look over the rebox assembly at the end and ll any
gaps with mortar especially at joint connections.
Adjustmentsmustbemadetoensurethereplaceislevel
andsquarewhilethemortarisstillwet.
Afterfourthrowofwallsareinplace,add36”rebartoall8)
cells as shown in Figure 22. Therebar should enter the
holesintheHearthandlieadjacenttothe12”rebarsecured
insuboor.Then llcells withapprox. 2cu.ft. Ready-Mix
Concrete.
Figure 22
12inch
rebar
Addrebarafter
fourthrow
Temporarily placeLintel betweensidewalls, makingsure9)
it is ush to the front and snug at the inside. Check for
alignment.RemoveLintelandapplymortaronsurfacesto
bemated.InstallLintel.
InstallLowerRearDomeushtotherearwallsasshownin10)
Figure 23.
Figure 23
Lintel
Lower
RearDome
11) Place Lower Side Domes between Lintel and Lower
RearDometoverifyt.Thefacewiththeratingplatefaces
theinsideof therebox asshown in Figure 24. Remove
andpreparematingsurfaceswithmortar.AssembleLower
DomeSidesandcheckthatallfourtopsurfacesarelevel
witheachother.Shimifnecessary.
Figure 24
LowerDomeSides
(RatingPlatefacesinside)
12)NowinstalltheSmokeDomeTops.Alignouteredgeswith
LowerDomeSides.Checkforatnessandsquareness.
Figure 25
15
Raised and Flush Hearth Application:
Ifyouwouldprefertohavearaisedhearth,theVent-Freebox
canberaisedtothedesiredheightusingwoodstudsorconcrete
blocks.
Figure 26
ConcreteBlock
RaisedPlatform
Whendeterminingraisedhearthheight,besuretoallow
forthe3”thickreboxhearthand1-1/2”thickrebrickoor,in
additiontotheheightofbaseplatform.
Figure 27
RaisedWood
Platform
Fora“ushhearth”(replaceoorushwiththeroom’s
oor)thebaseplatecanbeomittedfromtheassemblyandthe
rebox walls built directly on the concrete support slab. The
rebrickoorofthereboxisthensetdirectlytotheconcrete
supportslab.Thismakesthe replacenished re brickoor
approximatelyoneandone-halfinches(1-1/2”)abovethetop
oftheconcretesupportslab.
Gas Piping Installation
The provision for installation of a gas pipe is only for
connection to a Vent free decorative gas log sets meeting
standardANSIZ21.11.2
Familiarize yourself with requirements for installation as
outlinedbytheNationalFuelGasCode,ANSIZ223.1.
This gas pipe provision must only be connected to an
approved vent-free gas log heater certied toANSI Z21.11.2
heater standard. Check local building codes for specic pipe
andmaterialrequirements.
1) Gaspipingcanberoutedfromtheoor,rearorsidewalls.
With a masonry drill, follow the instructions from the gas
appliancemanufacturer.Anywiresmustberoutedthrough
separateconduit.Makesureprovisionsaremadeforaccess
tomanualshut-offvalve.
Figure 28
CSA Certied Manual
Shut-offValve
Tee-joint
Sediment
Trap
Approved
Flexible
GasLine
3”
Minimum
Pipe
Nipple
Cap
FromExternal
Regulator
(11-14”W.C.pressure)
2) Afterroutingpiping,llholearoundpipewithmortar.
Electrical Line Feed
Electrical line feed can be routed through the Standard
reboxbackwall,sidewallsoroorbydrillinganappropriately
sized hole using a masonry drill bit. Be sure to follow the
Vent free decorative gas logManufacturer’s explicitelectrical
line connection instructions for vented masonry replace
installations.
NOTE: Gas line and electric line must be routed through
separate access holes.
FirebrickSideGasor
ElectricLine
Figure 29
IMPORTANT: Allaccessholesmustbegroutedwithmortarto
sealanygapsorcracks.
16
Firebrick Liner Installation
Itis requiredthat theinterior sides,rear andbottom belined
withminimum1-1/8”thickrebrick.Pre-fabricatedrebrickliner
wallscanmaketheinstallationeasier.
Allrequiredthrough-wallaccesses(gasandelectrical
linefeedsandcombustionairsupplyaccessholes)shouldbe
drilledbeforetherequiredrebrickliningisinstalled.
Modular Firebrick Lining
IfusingFMIPRODUCTS,LLCFirebrickLiners,simplyusean
extrabucketofmortar.InstallHearthLinerrst,rearnextand
sideslast.Considerifbracketsforgrateswillberequired,also
ifpre-drillingisrequiredforgaslines,electricaloriftheoutside
combustionairkitistobeinstalled.
The following Firebrick Patterns are available from FMI
PRODUCTS,LLC:
MM(XX)SHBL- Herring Bone
Figure 30
MM(XX)FRBL- Running Bond
Figure 31
Initial Fireplace Operation
Followthegasappliancemanufacturers’requirements
forlightingandoperatingyourventfreelog.Whenrstoperating
thereplace,openawindowintheroomtoallowsmellscreated
fromtheheaterandreplacecuring.
Wesuggestoperatingtheheaterforseveral30minute
intervalsallowingthereplacetocoolforanhourinbetween.
This will allow any moisture in the brick and replace to
escape.
Keep in mind that it may require several operations
tocompletelyremoveanysmellfromtheoperationofavent-
free heater and replace. If this condition continues, contact
yourgasappliancedealertoinspectthegasheaterforproper
operation.
Youmayhavefurtherquestionsaboutinstallation,op-
eration,ortroubleshooting.Ifso,contactFMIPROD-
UCTS,LLCat1-866-328-4537.
Whencallingpleasehaveyourmodelandserialnum-
bersofyourreplaceready.
Youcanalsovisitourwebsiteat
www.fmiproducts.com.
Ifthisproductismissingapartorhasabrokencom-
ponent,pleasedonotreturnittothestore.CallFMI
PRODUCTS, LLC at 1-866-328-4537 to answer
questionsandreplacepartsunderwarranty.
Note: Use only original replacement parts. This will
protect your warranty coverage for parts replaced
under warranty.
Whencalling,haveready:
• yourname
• youraddress
• modelandserialnumbersofyourreplace
• howreplacewasmalfunctioning
• purchasedate
Technical Service
Replacement Parts
17
18
WARRANTY
KEEP THIS WARRANTY
FMI PRODUCTS, LLC LIMITED WARRANTIES
New Products
FMIPRODUCTS,LLCwarrantsallGrandMeridianFireplacestobefreefromdefectsinmaterialsthatadverselyaffectreplace
performanceforaperiodoften(10)yearsfromthedateofpurchase,subjecttothetermsandconditionsofthislimitedwarranty.
FMIPRODUCTS,LLCdoesnotwarrantaccessorychimney,outsideairducts,gascontrolorburnersystem,ceramiclogs,and
devicesnotmanufacturedbyFMIPRODUCTS,LLC.Valvesandelectronicpartsareonlycoveredforoneyearpartsandlaborper
thelogsetmanufacturer’swarranty.
ThiswarrantycoversonlyproductsmanufacturedbyFMIPRODUCTS,LLC,specicallythemodularconcreterebox,andNO
WARRANTY, EXPRESS OR IMPLIED, EXTENDS TO ANY OF THE HARDWARE, FOUNDATION, VENTING, DUCTS, OR
ACCESSORIES.THISWARRANTYDOESNOTCOVERDRAFTING,SMOKING,ORSOOTINGOFTHEFIREPLACESYSTEM.
Factorsbeyondthemanufacturer’scontrolmayaffectdrafting,smoking,andsooting,FMIPRODUCTS,LLCcannotguarantee
theseaspectsofperformance.
Ifacomponentisfoundtobedefectiveunderthetermsofthiswarranty,thepartythiswarrantyisextendedtoshallnotifyFMI
PRODUCTS,LLC,2701S.HarborBlvd.SantaAna,CA92704inwriting,byregisteredmail,withinthirty(30)daysfollowingthe
discoveryofthedefectwithinthewarrantyperiod.Thelettershallcontain(1)thedateofpurchase;(2)placeofpurchase;(3)
addressofinstallation;(4)name,addressandphonenumberofthehomeowner;and(5)abriefdescriptionofthedefect.
FMIPRODUCTS,LLC,oranyentitythereof,isnotresponsibleforanylaborcostsorindirectcostsincurredforthereplacement
ofdefectivecomponents.
FMIPRODUCTS,LLC isnot responsibleformisuseor mishandlingofcomponentparts. Nothingin thiswarrantymakesFMI
PRODUCTS, LLC, or any entity thereof, liable in any respect for any injury or damage to the building or structure in which
thereplacehasbeeninstalledortothepersonsorpropertythereinarisingoutoftheuse,misuse,orinstallationofproperly
manufacturedFMIPRODUCTS,LLCproduct.
FMIPRODUCTS,LLC,ORANYENTITYTHEREOF,SHALLNOTBEHELDLIABLEFORANYINCIDENTALORCONSEQUENTIAL
DAMAGESOREXPENSESARISINGOUTOFTHEUSEOFTHEFIREPLACE.ALLSUCHDAMAGESANDEXPENSESARE
HEREBYEXCLUDED.
This warranty is null and void when the replaces are not installed pursuant to the installation instructions provided by FMI
PRODUCTS,LLCandlocalbuildingcodeshavenotbeenfollowedcompletely.
ThiswarrantyappliesonlytothosereplacesinstalledinthecontinentalUnitedStates,Hawaii,AlaskaandCanada.Ifanypartof
thiswarrantyisfoundtobeunenforceable,,theremainingpartsshallremaininforceandeffect.
FMIPRODUCTS,LLCHEREBYDISCLAIMSALLGUARANTEESANDWARRANTIES,EXPRESSORIMPLIED,BEYONDTHE
WARRANTIESSETFORTHHEREIN.
CUSTOMERSERVICE&PARTSREPLACEMENT:
Partsandaccessoriesmaybepurchasedfromyourlocaldealer.AdditionalinformationisavailablefromFMIPRODUCTS,LLC.
Accessoryorderswillbeacceptedbymail,oryoumaycalltoorderMondaythroughFridayfrom8:00a.m.to5:00p.m.(Central
StandardTime)at:(800)328-4537.
Pleasecompletethefollowinginformationforfuturereferenceandwarrantyverication:
Model(
locatedonproductoridenticationtag
)_________________
SerialNo.(
locatedonproductoridenticationtag
)______________
DatePurchased__________________
Keepreceiptforwarrantyverication.
2701S.HarborBlvd.
SantaAna,CA92704
1-866-328-4537
www.fmiproducts.com
125162-01
Rev.A
12/09
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16
  • Page 17 17
  • Page 18 18
  • Page 19 19
  • Page 20 20

FMI Outdoor Fireplace MM39/44/49VF User manual

Category
Fireplaces
Type
User manual

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI