checked
checked
checked
checked
checked
checked
PREPARATION CHECKLIST
THE FOLLOWING ITEMS MUST BE COMPLETED PRIOR TO INSTALLATION
Solid xing must be provided in the walls behind the wall channels. Refer to the
‘Layout Plan’ on page 3 to establish your shower type.
To ensure a successful result, the walls must be plumb and the oor at and level.
Contract a plumber to ensure waste tting is correctly installed.
ACRYLIC INSTALLATION OPTION
To install acrylic tray and liner, please refer to separate installation instructions with
packaged with product.
TILE INSTALLATION OPTION
Wall and oor surfaces must be waterproofed by a Certied Applicator and a Producer
Statement provided for the local council.
All tiling must be completed and allowed to cure before installing the shower enclosure.
4
INSTALLATION OF GEORGIA SQUARE SHOWER - 2 SIDED
Go to the Layout Plan on Page 3 and identify the shower type you are installing. Mark
out the outside line positioning of the wall channels within the minimum to maximum
range to suit your requirements.
Using these points mark out the position of the Front Door Assembly Channel (1) and
the Fixed Return Panel (3) onto the tray.
Mark the outside line and the wall channels (1) and (2) with a spirit level. Through the
holes in the channel pre-drill the start of the hole as a guide (refer Diagram A1).
Apply a bead of silicone down the back of the channels (1) and (2) and x in place with
screws (8) checking that they remain plumb (refer Diagram A2).
DIAGRAM A:
A1 A2