Design House 523522 Installation guide

Category
Sanitary ware
Type
Installation guide
8. With gasket in place, slide escutcheon over
trim sleeve. Fasten escutcheon to faucet body
and tighten to finished wall surface using two
mounting screws
Design
House
Plaster guard is preinstalled.
Shut off main water supply. Preparation/Assembly: Recommended
component locations: Recommended valve depth is front of valve to
front of the finished wall of 2 3/16” (1 7/8” min – 2 ½” max). Shower
and /or spout outlet hole: 1 ¼” diameter. Valve access hole: 6”
diameter. Caution: Allow at least 2” between tub outlet and tub rim.
Pipe should stick outside
finished wall by 4”
Pipe should stick outside
finished wall by 4”
Insert screw through
handle and thread to
faucet body. Insert
button over set screw
Slide handle onto
shaft.
Thread shower head onto shower
arm.
Wrap threaded connections (except where o-ring or rubber sealant are present)
with Teflon tape available from your local hardware or plumbing supply store.
Always wrap in a clockwise direction.
7a.Place handle on valve stem and turn handle to full on mixed
position. Turn on hot and cold water lines to full open for one
minute each. Check for leakage. Shut off water at faucet. Remove
the Handle.REMARK:Adjust the water temperature by adjusting the
rotational limit. Remove the rotational limit stop from the valve by
sliding it off the stem.Re-install in correct position.
Screw the plastic spout
assembly into the metal spout.
Then slip the spout onto the pipe
and tighten the screw to hold
spout in place.
4.
4 4 4
5
5.
6
9
9.
10.
7.
10
7
8
6.
Handle
Screw
Button
Spout Assembly
Stop Valve
Plug
Washer
Cartridge
Cover
Shower Arm
Flange
Plaster Guard
Escutcheon
Gasket
Screw
Screw
Trim Sleeve
Body Assembly
Shower Head
523548,523530,523522
  • Page 1 1

Design House 523522 Installation guide

Category
Sanitary ware
Type
Installation guide

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI