American Hearth Tahoe Premium Clean-Face Gas Conversion NAT to LP Owner's manual

Type
Owner's manual

This manual is also suitable for

37112-1-1019 Page 1Empire Comfort Systems Inc. • Belleville, IL
GAS CONVERSION KIT
INSTALLATION INSTRUCTIONS
FOR CONVERSION TO PROPANE (LP) GAS
WARNING
This conversion kit is to be installed by an Empire Comfort Systems, Inc., distributor (or other
qualied agency¹)*in accordance with the manufacturers instructions and all codes and
requirements of the authority having jurisdiction. Failure to follow instructions could result
in serious injury or property damage. The qualied agency performing this work assumes
responsibility for this conversion.
1National Fuel Gas Code Z223.1 (Latest Edition)
*The term “qualied individual, rm, corporation or company which either in person or through
a representative is engaged in and is responsible for (a) the installation of gas piping or (b)
the connection, installation repair, or servicing of equipment, who is experienced in such
work, familiar with all precautions required, and has complied with all the requirements of the
authority having jurisdiction.
CHECK SAFETY SHUTDOWN PERFORMANCE
WARNING
Perform the safety shutdown test anytime work is done on a gas system to avoid the possibility
of re or explosion with property damage, personal injury or loss of life.
SAFETY SHUTDOWN SYSTEM
Continuous Ignition Systems (Standing Pilot)
1. Place gas control knob in PILOT position. Main burner should go off and pilot should remain lit.
2. Extinguishpilotame.Pilotgasowshouldstopwithin30seconds.Safetyshut-offofpilotgasprovescomplete
shutdownsincesafetyshut-offvalveblocksowofgastomainburnerandpilot.
3. Relightpilotburnerandoperatesystemthroughonecompletecycletomakesureallcontrolsoperateproperly.
Intermittent Ignition Systems (Intermittent Pilot)
100%Shut-OffIPSecondLockout
DIRECT VENT GAS FIREPLACE CONVERSION KITS
DVCP36(PP,SP)30-1 CONVERSION KIT DVCP36(PP,SP)70-1 CONVERSION KIT
PartNumber35396 PartNumber35398
FOR CONVERSION TO PROPANE GAS
37112-1-1019Page 2 Empire Comfort Systems Inc. • Belleville, IL
PARTS LIST
PART DESCRIPTION CONVERSION KIT - 35396 CONVERSION KIT - 35398 QUANTITY SUPPLIED
PilotOrice R7658 R10426 1
MainBurnerOrice P210 P210 1
LP Flue Restrictor
36008 36008 1
SITGasValveConversionKit
R7657 R11169 1
GasConversionLabel 2139 2139 1
Tools Needed:StandardScrewdriver,1/4"HexDriver,5/16"HexDriver,3/8"and1/2"Wrenches
Gas input for direct vent replace insert converted to Propane Gas:
• DVCP36(PP,SP)3032,000Btuperhour
• DVCP36(PP,SP)7032,000Btuperhour
ThedirectventgasreplacewhenconvertedtoPropaneGaswillhaveamanifoldpressureapproximately10.0"w.c.
(2.49kPa)foramaximuminputor4.9"w.c.(1.220kPa)foraminimuminputatthevalveoutletwiththeinletpressuretothe
valvefromaminimumof11.0"w.c.(2.739kPa)forthepurposeofinputadjustmenttoamaximumof13.0"w.c.(3.235kPa).
INSTRUCTIONS FOR CONVERSION
1. Ifthereplaceinsertisinstalled,turnOFFgasandelectricsupplytoreplacebeforemakinggasconversion.
2. Removeaccesspanelbelowglass;liftandpullawayfromreplace.
3. Releasethetwoglassframespringclampsbeneathoneofthetwoglassframes.
4. Removetheglassframeandscreenframeasanassembly.
5. Removelogsfromburnerassembly.
6. Removethetenscrewsaroundtheburnerperimeter,andremovethefalseoorfromtheburnerassembly.
7. Removethefourscrewsretainingtheburnertotheburnerbase,andremoveburner.
8. RemoveNaturalGasmainburneroricefromoricetting.
9. InstallPropaneGasmainburneroriceintooricetting:
• forDVCP36(PP,SP)30,OriceisMARKED #51
• forDVCP36(PP,SP)70,OriceisMARKED #51
10. Pullupwardonpilothoodtoremoveandgainaccesstopilotinjectororice.
11. RemoveNaturalGaspilotinjectororicefrompilotburnerwith5/32"hex(Allen)wrench.
12. InsertIncludedPropaneGaspilotinjectororiceintopilotburnerusinga5/32"hexwrench.
13. Re-installpilothoodtopilotassembly.Pushdownwardtosnapinplace.
14. ForDVCP36(PP,SP)30only,convertgasvalveasinstructedinS.I.T.PropaneGasValveConversionKit.
15.
ForDVCP36(PP,SP)70only,removeNaturalGasvalvefrommanifoldpipeandreplacewithincludedPropaneGasvalve.
16. Adjustairshuttersettingto3/16”open(1/8”with40ft.verticalvent).
17. Replacetheburnerassemblyontotheburnerbase.
18. Replacethefalseoortotheburner.
19. Forverticallyventedinstallationsonly,replacetheuerestrictorwithincludedPropaneGasuerestrictor.
20. Replacelogset.
21. Replaceglassandscreenframes,andloweraccesspanel.
22.
Theconvertedreplacemustbeconnectedtoasupplyoftheconversiongasandcheckedforleaksatallconnections.
  • Page 1 1
  • Page 2 2

American Hearth Tahoe Premium Clean-Face Gas Conversion NAT to LP Owner's manual

Type
Owner's manual
This manual is also suitable for

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI