EZPole EZD21 User manual

  • Hello! I am an AI chatbot trained to assist you with the EZPole EZD21 User manual. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
Post hole digger or spade shovel
Level
Ruler or tape measure
1 - 80lbs bag of quick setting
concrete
1/2 Gal. of gravel
Mixing container
Tools and
Materials
Needed:
Step-by-Step Instructions:
1.Select flagpole location. Check for
underground sprinkler water lines and
electrical lines before you dig.
2.Dig a 22'' hole with a tapered diameter,
see diagram below.
3.Put 2'' of gravel under base of sleeve,
(Allows for drainage) tamp stone.
4.Place aluminum sleeve (bead down)
with bottom section of flagpole into
place
so cement won’t fill bottom of sleeve.
5.Mix bag of cement and pour into hole.
6.Mound up concrete around sleeve to
allow for water runoff.
(Add rocky fill to increase concrete
volume).
7.Use level to square vertical. Stabilize for
24 hours. Insert remaining sections.
/