ASSEMBLY PARTS
KEEP THIS MANUAL FOR FUTURE REFERENCE
3-STEP LADDER ASSEMBLY
DIAGRAM 1
DIAGRAM 2
A
EFG
G
BC
LADDER STEPX3
M6X30
2PCS
D
M6X45
6PCS
M6NUT
2PCS
H
H
ELASTIC ROPE
2PCS
ALLEN KEY
1PC EXTRA PARTS
LADDER BASEX1 LADDER HANDLE BARX2
Reference Diagram 1 to proceed with the installation:
1. Install Part A (Steps) to the corresponding positions.
Note that Part D (Long Screws) should not be fully
tighten until the end of the installation process.
2.Insert Part B (Ladder Base) into Part C (Ladder
Frame).
3.Align Part F (Nuts) with the hole position first, and
then install Part E (Short Screws) and tighten.
4.Install Part D (Long Screws) from the top to the
bottom and tighten.
Reference Diagram 2 to proceed with the installation:
1.Insert Part G (Elastic Rope) through the opening of
the top of Part C (On the Hook of the ladder frame).
2.Loop the elastic rope around the frame of the
trampoline.
3.End of the elastic rope must be wrapped around the
ball.
Make sure that the SkyBound logo is facing front while
the handle bars are facing back
A
A
A
E
EF
F
B
C
C
D
D
D
D
D
D
D
X 1
E
X 1
F
X 1