ESAB Installation of new Meters in Meter Kits Installation guide

  • Hello! I am an AI chatbot trained to assist you with the ESAB Installation of new Meters in Meter Kits Installation guide. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
A
B
A
A
B
B
A = EXISTING HOLES
B = .140 DIA. (N
O
28 DRILL)
F-12-829
June, 1997
INSTRUCTIONS for
INSTALLATION OF
NEW METERS IN METER KITS
When replacing a voltmeter or ammeter with one of
the new dustproof type meters, it is necessary to drill
three .140-in. diameter holes (No. 28 drill bit) before
the meter can be installed. Proceed as follows:
1. Disconnect main input power to the control.
2. Remove front control panel and meter to be
replaced.
3. Using template supplied below as Fig. 1, mark
and drill (with a No. 28 drill bit) the new mounting
holes.
4. After mounting the meter, refer to the appropriate
control instruction booklet for correct electrical
connections:
UEC-7 F-12-543
UEC-8 F-12-747
UCC-8 F-12-515
UCC-9 F-12-593
AGC-1 F-12-553
PCC-8 F-12-528
5. Reassemble the front panel to the control
cabinet.
6. The following voltmeters and ammeters are
available:
New Replaces
Voltmeter Part Number Part Number
0-80 VAC 2062415 996597
0-80-VDC 2062416 2062053
Ammeter
0-1000 AAC 2062418 996599
0-1500 AAC 2062419 2062049
0-500 ADC 2062421 639598
0-800 ADC 2062422 2062051
0-1000 ADC 2062423 639586
0-1500 ADC 2062424 639592
F-12-829 6/97 Printed in U.S.A.
Fig. 1 - Mounting Hole Pattern Template
/