Everbilt EB-0053DT-10BK Operating instructions

Type
Operating instructions
Shelving Installation Instructions
2700 Oak Industrial Dr. NE | Grand Rapids, MI 49505-6026 USA
1.800.253.1561 | 616.459.3311 | Fax: 877.636.3290
www.kv.com
1. Locate & mark wall studs. 2. Level and attach the standards/upright to the wall
on 16" stud centers.
3. Insert brackets into standards/upright and firmly tap
them down at the base to seat the bracket securely.
4. Add shelves to the brackets to complete the installation.
  • Page 1 1

Everbilt EB-0053DT-10BK Operating instructions

Type
Operating instructions

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI