Reznor VCT Installation guide

Type
Installation guide

This manual is also suitable for

Reznor VCT heaters offer efficient and versatile heating solutions for a range of industrial and commercial applications. With a variety of sizes and fuel options available, these infrared tube heaters can be customized to meet your specific heating needs. From workshops and warehouses to showrooms and aircraft hangars, Reznor VCT heaters provide dependable and cost-effective warmth, even in the most challenging environments.

Reznor VCT heaters offer efficient and versatile heating solutions for a range of industrial and commercial applications. With a variety of sizes and fuel options available, these infrared tube heaters can be customized to meet your specific heating needs. From workshops and warehouses to showrooms and aircraft hangars, Reznor VCT heaters provide dependable and cost-effective warmth, even in the most challenging environments.

Page 1
Applies to: Tubular Infrared Models VC & VP
Tubing Conguration Addendum
VPS Model Sizes
Length
U Bend L Bend
5’
Straight
20 30 40 50 60 70 80
VPS
60(60,000)
VP B VP B VP A
VPU VPL VPH
VPU VP D
VPS 80
(80,000)
Natural
VP B VP A VP A
VPU VPL VPH
VPU VP D VP D
HDT5 VPU HDT5
HDT5
VPS 80
(80,000)
Propane
VP B VP A VP A
VPU VPL VPH
VPU VP D VP D
VPU
VPS 100
(100,000)
VP A VP A VP A
VPU VPL VPH
VP D VP D VP E
VPU HDT5 HDT5
HDT5
VPS 125
(125,000)
VP A VP A VP B
VPU VPL VPHVP D VP E VP E
VPS 150
(150,000)
VP A VP A VP B VP B
VPU VPL VPHVP E VP E VP E VP D (2)
VPU
VPS 170
(170,000)
VP C VP C VP C VP C
VPU VPL VPHVP E VP E VP D (2) VP D
VPU VP E
VPS 200
(200,000)
VP C VP C VP C VP C
VPU VPL VPHVP E VP E VP D (2) VP D
VPU VP E
Please review the attached charts for revised congurations
Note that in order to achieve the prior congurations dimensionally, as listed in the enclosed Installation Manual, it may
be necessary to add a U bend. The congurations highlighted in gray are the revised congurations. Please follow
these charts for current offerings.
Do not use the congurations listed in the manual unless they are shown on the attached matrix.
Note: When using a U or L Bend refer to the Installation Manual to determine whether a burner insert and/or tubulator is required.
Document No D303055 (4-16)
Obsoletes Document No D303055
Page 2
VCS Model Sizes
Length
U Bend L Bend
5’
Straight
20 30 40 50 60 70 80
VCS 60
(60,000)
Natural
VC BS VC BS VC AS(2)
VCUS VCLS VCHS
VCUS
VCS 60
(60,000)
Propane
VC BS VC AS(2) VC AS(2)
VCUS VCLS VCHS
VCUS VCUS
VCS 80
(80,000)
Natural
VC BS VC AS(2) VC AS(2)
VCUS VCLS VCHS
VCUS VCUS HDT5
HDT5 HDT5
VCS 80
(80,000)
Propane
VC BS VC AS(2) VC AS(2)
VCUS VCLS VCHS
VCUS VCUS
VCS 100
(100,000)
Natural
VC AS(2) VC AS(2) VC AS
VCUS VCLS VCHS
VCUS HDT5 VC BS
HDT5 HDT5
VCS 100
(100,000)
Propane
VC AS(2) VC AS VC AS
VCUS VCLS VCHS
VCUS VC BS VC BS
HDT5 VCUS HDT5
HDT5
VCS 125
(125,000)
VC AS(2) VC AS(2) VC AS VC BS(2)
VCUS VCLS VCHS
VCUS VC BS
VCS 150
(150,000)
VC AS VC AS VC BS(2) VC AS(2)
VCUS VCLS VCHSVC BS VC BS VC BS
VCUS
VCS 170
(170,000)
Natural
VC BS(2) VC BS(2) VC AS(2) VC AS
VCUS VCLS VCHS
VCUS VC BS VC BS(2)
VCUS
VCS 170
(170,000)
Propane
VC BS(2) VC AS(2) VC AS(2) VC AS
VCUS VCLS VCHS
VCUS VC BS VC BS VC BS(2)
VCUS
VCS 200
(200,000)
VC BS(2) VC BS(2) VC AS VC AS
VCUS VCLS VCHSVCUS VC BS VC BS(2) VC BS(2)
VCUS VCUS
Note: When using a U or L Bend refer to the Installation Manual to determine whether a burner insert and/or tubulator is required.
Page 3
VPT Model Sizes
Length
U Bend L Bend
5’
Straight
20 30 40 50 60 70 80
VPT 60
(60,000)
Natural
VP B VP B VP A
VPU VPL VPH
VPU HDT5 VP D
HDT5 HDT5
VPT 60
(60,000)
Propane
VC BS VP B VP A
VPU VPL VPH
VPU VP D
VPT 80
(80,000)
VP A VP A
VPU VPL VPH
VP D VP D
VPU HDT5
HDT5
VPT 100
(100,000)
VP B VP A
VPU VPL VPHHDT5 VP D
HDT5
VPT 125
(125,000)
VP A VP A VP A
VPU VPL VPHVP D VP D VP E
VPU
VPT 150
(150,000)
VP A VP A VP B
VPU VPL VPHVP D VP E VP E
VPU
VPT 170
(170,000)
VP C VP C VP C VC AS
VPU VPL VPHVP D VP E VP D (2) VC BS(2)
VPU
VPT 200
(200,000)
VP C VP C VP C VC AS
VPU VPL VPHVP D VP E VP D (2) VC BS(2)
VPU
Note: When using a U or L Bend refer to the Installation Manual to determine whether a burner insert and/or tubulator is required.
Page 4
VCT Model Sizes
Length
U Bend L Bend
5’
Straight
20 30 40 50 60 70 80
VCT 60
(60,000)
Natural
VC BS VC BS VC AS(2)
VPU VPL VPH
VPU HDT5 HDT5
HDT5
VCT 60
(60,000)
Propane
VC BS VC BS VC AS(2)
VPU VPL VPH
VPU
VCT 80
(80,000)
VC AS(2) VC AS(2)
VPU VPL VPH
VPU HDT5
HDT5
VCT 100
(100,000)
Natural
VC AS(2) VC AS(2)
VPU VPL VPHVPU HDT5
HDT5
VCT 100
(100,000)
Propane
VC AS(2) VC AS(2)
VPU VPL VPHVPU
VCT 125
(125,000)
VC AS(2) VC AS VC AS
VPU VPL VPHVPU VC BS VC BS
VPU
VCT 150
(150,000)
VC AS VC BS(2) VC BS(2)
VPU VPL VPHVC BS VPU
VPU
VCT 170
(170,000)
Natural
VC BS(2) VC BS(2) VC AS(2) VC AS
VPU VPL VPH
VPU VC BS VC BS(2)
VCT 170
(170,000)
Propane
VC BS(2) VC AS(2) VC AS(2) VC AS
VPU VPL VPH
VPU VC BS VC BS VC BS(2)
VPU
VCT 200
(200,000)
VC BS(2) VC AS(2) VC AS(2) VC AS
VPU VPL VPHVPU VC BS VC BS(2) VC BS(2)
VPU VPU
Note: When using a U or L Bend refer to the Installation Manual to determine whether a burner insert and/or tubulator is required.
Specications & illustrations subject to change without notice and without incurring obligations.
©Nortek Global HVAC, LLC 2016. All rights reserved.
All marks are the property of their respective organizations.
O’Fallon, MO I Printed in U.S.A. (4/16)
Doc No D303055 (4-16) SKU 393E-0416
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4

Reznor VCT Installation guide

Type
Installation guide
This manual is also suitable for

Reznor VCT heaters offer efficient and versatile heating solutions for a range of industrial and commercial applications. With a variety of sizes and fuel options available, these infrared tube heaters can be customized to meet your specific heating needs. From workshops and warehouses to showrooms and aircraft hangars, Reznor VCT heaters provide dependable and cost-effective warmth, even in the most challenging environments.

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI