Gill 8" TAKE-OFF BOARD SYSTEM Operating instructions

  • Hello! I have reviewed the installation instructions for the GILL Take-Off Board Tray 443 - 8". This document provides detailed steps on how to properly install the tray on a recessed concrete pad, including information on anchor bolts, tray positioning, and drainage. I'm ready to answer your questions about this product and its installation process.
  • What is the recommended width of the tray?
    Is it recommended to install a drain?
    What should I ensure when positioning the tray?
WARNING: Cancer and Reproductive Harm –
For more information go to www.p65warnings.ca.gov
F
Trubolt Wedge Anchor
INSTALLATION INSTRUCTIONS
1. Using a bit whose diameter equals the anchor
diameter, drill hole to any depth exceeding the
minimum embedment. Clean hole.
2. Assemble anchor with nut and washer so that
the top of the nut is flush with the top of the
anchor. Drive anchor through material to be
fastened so that nut and washer are flush with
surface material.
3. Expand anchor by tightening nut 3 to 5 turns, or
to the specific torque requirement (see selection
chart).
htt
p
://www.itwredhead.com/trubolt
_
installation
_
instr.as
p
/