Detach the service port’s cap of
1.
3-way valve, and the valve cap for 2-way valve
and 3-way valve. Connect the service port to the low side of the gauge manifold
Open the handle on the low side of the gauge manifold and operate vacuum pump.
2.
Vacuum the tubing for at least 15 minutes. The vacuum level on the low side gauge
should be 29.9 in of Hg, 76 cm of Hg, 0.1 MPa. when vacuuming is complete, close
the valve on the manifold and turn off the vacuum pump. The vacuum level should
hold for 1-2 minutes. If the vacuum level does not hold, check the flared connections
and repeat this step.
3.
Purging Method:To use vacuum pump
5
Open
Open the 2-way valve 1/4 turn. After 5-6 seconds, close the valve and inspect for
leaks with a leak detector or soap solution.
4.
No gas leakage? Go to step 6.
5.
Detach the charge hose6.
from the service port,
open 2-way valve and 3-way
Close
2-way valve
3-way valve
Open 90
O
2-way valve
3-way valve
2-way valve
3-way valve
2-way valve
3-way valve
Valve cap
Valve cap
Service port cap
After attaching the caps, check for leakage around the caps.
7.
8.
Step 1.
Step 2.
Step 3.
Step 7.
Step 6.
Step 4.
The power source must be exclusively used for air
conditioner.
In the case of installing an air conditioner in a moist place,
please install an ea-
For installation in other places, use an HVACR circuit breaker or time delay fuse.
If the refrigerant of the air conditioner leaks, it is necessary to discharge all the
according to the amount marked on the name plate.
Please do not let other cooling medium, except speci
ed one (R410A), or air
enter into the cooling circulation system. This could cause high pressure and
1
Power Source Installation
CAUTION
rth leakage breaker.(GFCI)
2
On Drainage
It becomes
high midway.
The gap with the
ground is too small.
There is the bad
smell from a ditch
It waves.
The end is imm-
ersed in water.
Install the drain hose and ensure downward flow.
Do not run the drain hose as shown below.
Pour water in the drain pan of the indoor unit, and
is proper.
In case that the attached drain hose is in a room, apply insulation to the hose to
Less than
5cm
con
rm that drainage
prevent condensation.
4
Check Items for Test Run
Please kindly explain to our customers how to operate
through the instruction manual.
Check for Installation and Test Run
1
1+2=
kg
R410A
2
kg
2=
1=
B
C
D
F E
kg
A
This product contains fluorinated greenhouse gases covered by
the Kyoto Protocol. Do not vent into the atmosphere.
Refrigerant type:R410A
GWP* value:1975
GWP=global warming potential
Please fill in with indelible ink,
and
on the refrigerant charge label supplied with the product.
The filled out label must be adhered in the proximity of the product
charging port (e.g. onto the inside of the stop value cover).
A contains fluorinated greenhouse gases covered by the Kyoto
Protocol
B factory refrigerant charge of the product: see unit name plate
C additional refrigerant amount charged in the field
D total refrigerant charge
E outdoor unit
F refrigerant cylinder and manifold for charging
Contains fluorinated greenhouse gases
covered by the Kyoto Protocol
Refrigerant charge label
Put check mark
in boxes
To prevent the gas
leakage,
continues, remove the refrigerant used for the leakage check and flare
tubes again. Repeat vacuum and leak and if no leakage, proceed to step 6.
replace the service port and valve caps.
Gas leak from interconnecting tubing?
Installation is on the interconnecting tubing?
Are the connecting wirings of indoor and outdoor
rmly
Is the connecting wiring of indoor and outdoor
rmly xed?
Is drainage securely carried out?
Is the ground wire securely connected?
Is the indoor unit securely xed?
Is power source voltage the local codes?
Is there any noise?
Are the lights near the unit working normally?
Are cooling and heating (when in heat pump) performing
normally?
Is the operation of room temperature control normal?
inserted to the terminal block?
Loosen the screws on
terminal block and
insert the wires fully into terminal
block, then tighten the screws.
If wiring is not correct, the unit will not operate properly and it could cause a
Fix the cable with a clamp.
Connection
3
If the drain-elbow is used,
please attach as shown in figure.
(Note:
Only for heat pump unit.)
Attaching Drain-Elbow
4
defect in the unit.
and connect the vacuum pump to the center port of the manifold.
In case of a leak, try tightening the flare connections to fix the leak. If the
leak stops, go to step 6. If the leak continues, check the flare connections
and repair as needed, then go back to step 3. then proceed step 6. If leak
valve completely.
refrigerant. Repair the leak, vacuum the unit then charge the liquid refrigerant
into air conditioner
could cause a leak and lead to personal injuries.
2-way valve
3-way valve
2-way valve
3-way valve
2-way valve
3-way valve
2-way valve
3-way valve